Shoppers World Terminal | |
---|---|
General information | |
Location | 100 Steeles Avenue West Brampton, Ontario Canada |
Coordinates | 43°39′50″N79°44′12″W / 43.66389°N 79.73667°W |
Owned by | City of Brampton |
Bus operators | |
History | |
Opened | 1981 |
Closed | 2012 |
Rebuilt | 2001 |
Passengers | |
2009 | 9000 daily [1] |
Shoppers World Terminal was a Brampton Transit bus station that served the south-central and western areas of Brampton, Ontario, including the neighbourhood of Peel Village. It was located on Steeles Avenue, west of Hurontario Street, in the parking lot of Shoppers World Brampton shopping centre. The building included a service counter, snack vending machines, and a heated waiting area. Washrooms at the station were only for Brampton Transit employees.
The terminal was replaced by the new Brampton Gateway Terminal, located on the northwest corner of Steeles Avenue and Main Street, on 26 November 2012. [2]
As of 2009, it was the second busiest terminal in Brampton, after the Bramalea Terminal, which has also been relocated. [1]
A transit terminal was built at Shoppers World in 1981, on the east side of the mall. [1]
Six routes went to Shoppers World, as of 1989: 1B Queen from City Centre Terminal, later going to Sheridan College, 2 Main from Heart Lake Terminal to Sheridan, 7 Kennedy down Heart Lake and over to Shoppers World, 8 Centre, along the same route from City Centre, and 11 Steeles, to Albion and Humberline, Martin Grove Loop on Saturdays. [3]
A new terminal was built at the south-west area of the mall on former parking spaces, and opened in 2001. The old terminal was demolished and a new building for Canadian Tire was built in its place.
Building rehabilitation lasted a few months in 2009. [4]
Issues related to the terminal's safety had been raised. The terminal is in a busy section of the mall parking lot, near independent multicultural grocery store Oceans Fresh Food Market. In April 2011, the Accessibility Advisory Committee discussed the matter of the paint signalling the ramp to some bus platforms was faded, an issue for those lacking full depth perception; no motions were considered, but the Accessibility Coordinator later talked with Brampton Transit. [5]
In 2009, the manager of Land Use Policy recommended that, with the addition of Acceleride (later Züm) and a proposed Hurontario–Main LRT, there was a "demonstrated need" to move the terminal to the corner of Hurontario and Steeles. Such a move would allow less diversion time from the route to the station, and for a larger station. [1] As a stop on the potential LRT, the terminal is considered part of the Hurontario Higher Order Transit corridor. [6] Expropriations directly on the corner allowed for the terminal to be moved;, [7] which stood in contrast to the old location which was leased. [8] As of spring 2010, the terminal redesign and relocation was scheduled to coincide with the Zum Main Street launch in fall 2011; [9] it was listed as a 2011 service initiative in the agency's 2011 Current and Capital Budget. [10]
Contract 2011–095, for the construction of the new terminal, its amenities, plus road and intersection improvements was awarded to Graham Construction and Engineering. The lowest tender, the contract was worth $10,190,340. [11] Earlier estimates presumed an $8.3 million cost. A city report placed the "higher actual costs" on a limited construction timeline and tendering the contract during the summer. [12]
Shoppers World would be on a proposed light rail corridor along Main and Hurontario, from downtown Brampton (including the Brampton GO Station) to the Port Credit GO Station near Lakeshore Road, passing the Cooksville GO Station. [13]
As of 26 November 2012, the Shoppers World Terminal was closed and the new Brampton Gateway Terminal began operations. All the routes that had been serviced by the Shopper's World Terminal, along with some new routes, were now being serviced from the Brampton Gateway Terminal. The terminal is abandoned and is scheduled for demolition and returning the area of the terminal to be a parking lot for the shopping mall.
The Hamilton Street Railway (HSR) is the public transport agency for Hamilton, Ontario. The name is a legacy of the company's early period, when public transit in Hamilton was primarily served by streetcars. Although streetcars are no longer used in the city today, the HSR operates bus and paratransit services, with a ridership of 21 million passengers a year.
Cooksville GO Station is a GO Transit train and bus station the Milton line in the community of Cooksville in Mississauga, Ontario, Canada. It is located at 3210 Hurontario Street, near Dundas and Hurontario Streets. The future Hurontario LRT will connect to this station.
MiWay, also known as Mississauga Transit and originally as Mississauga Transit Systems, is the municipal public transport agency serving Mississauga, Ontario, Canada, and is responsible to the city's Transportation and Works Department. MiWay services consist of two types of bus routes: MiLocal, local buses that make frequent stops, and MiExpress, express buses between major destinations. MiWay is the primary operator along the Mississauga Transitway, a dedicated east–west bus-only roadway.
Square One Shopping Centre, or simply Square One, is a shopping mall located in Mississauga, Ontario, Canada. It is the largest shopping centre in Ontario and the second largest shopping centre in Canada, after the West Edmonton Mall. It has over 2,200,000 square feet (200,000 m2) of retail space, with more than 360 stores and services. On average, the mall serves over 24 million customers each year. It operates on most holidays, making it the only shopping mall in the city and one of the few in the Greater Toronto Area that does so.
Brampton Transit (BT) is a public transport bus operator for the City of Brampton in the Regional Municipality of Peel, and within the Greater Toronto Area (GTA) in Ontario, Canada. Brampton Transit began operations in 1974. In 2023, the system had a ridership of 49,200,800, or about 226,500 per weekday as of the third quarter of 2024.
Steeles Avenue is an east–west street that forms the northern city limit of Toronto and the southern limit of York Region in Ontario, Canada. It stretches 77.3 km (48.0 mi) across the western and central Greater Toronto Area from Appleby Line in Milton in the west to the Toronto-Pickering city limits in the east, where it continues east into Durham Region as Taunton Road, which itself extends 58 km (36 mi) across the length of Durham Region to its boundary with Northumberland County.
Port Credit GO Station is a GO Transit train and bus station in Mississauga, Ontario, Canada. Located in the Port Credit neighbourhood, it is a stop on the Lakeshore West line train service. Port Credit GO has been identified by Metrolinx as a transportation mobility hub, where different forms of transportation come together, serving as the origin, destination or transfer point for a significant amount of trips. It also is a concentrated point of employment, housing, and recreation, making them places of significant economic development and activity where office buildings, hospitals, educational institutions, government service and information centres, shopping malls and restaurants can be located. The under-construction Hurontario LRT will serve the station.
Hurontario Street is a roadway running in Ontario, Canada between Lake Ontario at Mississauga and Lake Huron's Georgian Bay at Collingwood. Within Peel Region, it is a major urban thoroughfare within the cities of Mississauga and Brampton, which serves as the divide from which cross-streets are split into East and West, except at its foot in the historic Mississauga neighbourhood of Port Credit. Farther north, with the exception of the section through Simcoe County, where it forms the 8th Concession, it is the meridian for the rural municipalities it passes through. In Dufferin County, for instance, parallel roads are labelled as EHS or WHS for East of Hurontario Street.
The Mississauga Transitway is a bus rapid transit (BRT) system in Mississauga, Ontario, Canada. It comprises a series of purpose-constructed bus-only roadways, as well as reserved lanes on existing city streets and portions of Highway 403, that together form a continuous 18 km (11 mi) route spanning most of the city from Winston Churchill Boulevard in the west to the junction of Highways 401 and 427 in the east on the border with Toronto. Service on the Transitway is provided by MiWay and GO Transit, with some stations providing connections to Brampton Transit and Toronto Transit Commission (TTC) bus services.
Lime Ridge Mall is a two-level indoor shopping mall in Hamilton, Ontario, Canada. Opened on September 13, 1981, it is the largest mall complex in the city, an 815,000-square-foot (75,700 m2) super-regional shopping centre with over 213 stores including department stores and big box stores such as Hudson's Bay. Sears closed in 2017. It is located on 999 Upper Wentworth Street.
Square One Bus Terminal is a GO Transit intercity bus terminal located in central Mississauga, Ontario, Canada. It is situated directly across Rathburn Road West from the City Centre Transit Terminal and Square One Shopping Centre, after which the terminal is named.
Züm is a bus rapid transit system for the suburban city of Brampton, Ontario, Canada, northwest of Toronto, operated by Brampton Transit. Three routes extend into the Cities of Mississauga, Vaughan, and Toronto, with the first corridor having started service in fall 2010.
Bramalea Terminal is a Brampton Transit bus station serving the community of Bramalea in Brampton, Ontario, Canada. It is located at the south west corner of Peel Centre Drive and Central Park Drive on the north side of the Brampton Civic Centre. The customer service centre building is situated in the northerly of two island platform areas, which are accessed by pedestrian cross walks. Within the building are service counters, washrooms, snack vending machines and a heated waiting area with screens displaying current bus route information.
The Hurontario LRT is a light rail line under construction in the cities of Mississauga and Brampton, Ontario, Canada. The line will run along Hurontario Street from Mississauga's Port Credit neighbourhood north to Steeles Avenue in Brampton. The line will be built and operated as a public-private partnership by Mobilinx, a consortium of private European and Japanese companies, with provincial transit agency Metrolinx retaining ownership of the line. It will be the only street railway operating in the Greater Toronto Area outside Toronto proper.
Brampton Gateway Terminal is a Brampton Transit bus station serving the south-central and western areas of Brampton, Ontario. It is located on the north-west corner of Steeles Avenue and Main Street adjoining the Shoppers World Brampton shopping centre. The terminal opened on November 26, 2012 to replace the Shoppers World Terminal on the south-west side of the shopping centre.
502 Züm Main is a bus rapid transit route in Brampton, Ontario which leads south into Mississauga, Ontario. The second corridor, which began service on September 6, 2011, runs from Sandalwood Parkway in the city's north end to MiWay's City Centre Transit Terminal near the Square One Shopping Centre in the south. It travels via the Downtown Brampton and Brampton Gateway terminals along Main and Hurontario Streets through Brampton and Mississauga. It covers the route of current route 2, which has frequent rush-hour service. Route 502 extends and replace MiWay's route 102 InterCity Express. It runs every 10 minutes during rush hours and 20 minutes off-peak hours, including weekends. Route 2's rush hour frequency was reduced to 20 minutes to optimize ridership.
511 Zum Steeles is a bus rapid transit route in Brampton, Ontario, Canada. The final corridor outlined in Phase 1 started service on November 26, 2012.
The Big Move is a regional transportation plan (RTP) published in 2008 and consisting of 62 rapid transit projects to be implemented across the Greater Toronto and Hamilton Area (GTHA). These rapid transit projects are intended to form a seamlessly integrated regional rapid transit network, which is the first priority action in the regional transportation plan. These projects form two long-term templates with 15 and 25 year horizons. These templates outline broad projects; specific details about technology, alignment, stations and service levels for each project are subsequently determined though a cost–benefit analysis or an environmental assessment process.
Urban rail transit in Canada encompasses a broad range of rail mass transit systems, including commuter rail, rapid transit, light rail, and streetcar systems.
Mississauga City Centre is the downtown of Mississauga, Ontario, Canada. The district runs west-to-east from west of Confederation Parkway to east of Hurontario Street, and east-west from south of Webb Drive to Centre View Drive. The newer urban corridor developing along Confederation Parkway between Rathburn Road and Burnhamthorpe Road consists of residential highrise buildings. The city's financial district, centred along Hurontario Street and Robert Speck Parkway, is home to the Mississauga Executive Centre and One City Centre Drive, and well as other smaller office complexes.