Soviet destroyer Gnevny (1958)

Last updated
Project57bis Krupny-class.jpg
Gnevny in 1971
History
Naval Ensign of the Soviet Union (1950-1991).svgSoviet Union
Name
  • Gnevny
  • (Гневный)
Namesake Wrathful in Russian
Builder North Nikolayev Shipyard
Laid down17 December 1957
Launched30 November 1958
Commissioned10 January 1960
Decommissioned8 April 1988
Homeport Vladivostok
Fate Scrapped
General characteristics
Class and type Kanin-class destroyer
Displacement
  • as built:
    • 3,500 long tons (3,556 t) standard
    • 4,192 long tons (4,259 t) full load
  • as modernised:
    • 3,700 long tons (3,759 t) standard
    • 4,500 long tons (4,572 t) full load
Length126.1 m (414 ft)
Beam12.7 m (42 ft)
Draught4.2 m (14 ft)
Installed power72,000 hp (54,000 kW)
Propulsion
Speedas built 34.5 knots (63.9 km/h; 39.7 mph)
Complement320
Sensors and
processing systems
Armament
  • as built:
  • as modernised:
    • 1 × twin SA-N-1 SAM launcher (32 Missiles)
    • 2 × quad 57 mm (2.2 in) guns
    • 2 × twin 30 mm (1.2 in) AK-230 guns
    • 10 × 533 mm (21 in) torpedo tubes
    • 3 × RBU-6000 anti submarine rocket launchers
Aviation facilities Helipad

Gnevny was the fifth ship of the Kanin-class destroyer of the Soviet Navy. [1]

Contents

Construction and career

The ship was built at North Nikolayev Shipyard in Mykolaiv and was launched on 30 November 1958 and commissioned into the Black Sea Fleet on 10 January 1960. [2]

In 1961, the ship made an ultra-long-distance transition from the Black Sea around Europe, and then - via the Northern Sea Route to the base of the Pacific Fleet. [3]

On May 19, 1966, the ship like all ships of Project 57-bis, was reclassified into the Large Missile Ship (BRK). [4]

She twice visited Massawa in Ethiopia (January 1967 and 1969) and Casablanca in Morocco (October 1968 and April 1978), as well as once Aden in South Yemen (January 1969), Nairobi in Mauritius (April 1969), Bombay in India (November 1975), Vancouver in Canada (August 1976). [3]

While in the war zone, she performed combat missions to provide assistance to the armed forces of Egypt (June 1967 and from April to December 1968), Syria (June 1967). [3]

On March 13, 1969, she was transferred to the Pacific Fleet (Pacific Fleet). In the period from 1972 to 1973, it was modernized according to the project 57-A in Vladivostok at the Dalzavod shipyard. On March 7, 1974, the ship was reclassified as a Large anti-submarine ship (BOD). [3]

On April 8, 1988, the ship was decommissioned, disarmed and expelled from the Navy, in connection with the transfer to the OFI for dismantling and sale, and on July 17 of the same year her crew was disbanded. [4]

Citations

  1. "Destroyers - Project 57bis". russianships.info. Retrieved 2021-08-11.
  2. R., Kazachkov (17 July 2009). "Catalog of slipway (serial) numbers of ships and vessels of the Navy of the USSR and Russia". Naval collection. Archived from the original on 21 August 2014. Retrieved 11 August 2021.
  3. 1 2 3 4 "Сайт "АТРИНА" • Эскадренные миноносцы пр.57-бис типа "Гневный", Krupn…". archive.is. 2012-12-21. Archived from the original on 2012-12-21. Retrieved 2021-08-11.
  4. 1 2 S.S., Berezhnoy (2002). Крейсера и миноносцы: Справочник. М.: Военное издательство. p. 472. ISBN   5-203-01780-8.

Related Research Articles

Kanin-class destroyer Soviet destroyer built 1957-1960

The Kanin class were a class of destroyers of the Soviet Navy during the Cold War. The Soviet designation was Project 57AGnevny. These ships were the first Soviet guided missile destroyers and were initially designated Project 57bis and known to NATO as the Krupny class. Their primary mission was anti-surface warfare using the SS-N-1 anti-ship missile.

Soviet destroyer <i>Gremyashchy</i> (1937) Destroyer of the Soviet Navy

Gremyashchy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Baltic Fleet and was later transferred to the Northern Fleet in 1941.

Soviet destroyer <i>Sokrushitelny</i> (1937) Destroyer of the Soviet Navy

Sokrushitelny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was initially assigned to the Baltic Fleet before she was transferred to the Northern Fleet in late 1939. After the German invasion of the Soviet Union in June 1941, the ship laid several minefields in the White and Barents Seas. Sokrushitelny spent most of her service escorting the Arctic Convoys, run by the British to provide weapons and supplies to the Soviets, or providing naval gunfire support to Soviet troops along the Arctic coast. The ship only fired at a German ship one time, while defending Convoy QP 13 in early 1942. While escorting Convoy QP 15 in November, she sank during a severe storm after breaking in half. Most of her crew was rescued by other destroyers sent to her aid, although 52 crewmen were lost.

Soviet destroyer <i>Rezvy</i> (1937) Destroyer of the Soviet Navy

Rezvy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1940, she was assigned to the Pacific Fleet.

Soviet destroyer <i>Ryany</i> (1937) Destroyer of the Soviet Navy

Ryany was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Pacific Fleet.

Soviet destroyer <i>Rezky</i> (1940) Destroyer of the Soviet Navy

Rezky was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1942, she was assigned to the Pacific Fleet.

Soviet destroyer <i>Rekordny</i> (1939) Gnevny-class destroyer of the Soviet Navy later transferred to the Peoples Liberation Army Navy

Rekordny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1941, she was assigned to the Pacific Fleet.

Soviet destroyer <i>Retivy</i> (1939) Destroyer of the Soviet Navy

Retivy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1941, she was assigned to the Pacific Fleet.

Soviet destroyer <i>Reshitelny</i> (1940) Destroyer of the Soviet Navy

Reshitelny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Originally named Pospeshny, she was renamed Reshitelny before completion in 1941, and was assigned to the Pacific Fleet. She was sold to People's Liberation Army Navy in 1955 and renamed Changchun. Currently she is preserved as a museum ship.

Soviet destroyer <i>Revnostny</i> (1941) Destroyer of the Soviet Navy

Revnostny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1941, she was assigned to the Pacific Fleet.

Soviet destroyer <i>Redky</i> (1941) Destroyer of the Soviet Navy

Redky was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Originally named Pylky, she was renamed Redky before completion in 1942, and was assigned to the Pacific Fleet.

Soviet destroyer <i>Razumny</i> (1939) Destroyer of the Soviet Navy

Razumny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Originally named Prochny, she was renamed Razumny before completion in 1941, and was assigned to the Pacific Fleet. About a year after the German invasion of Russia in June 1941, she was ordered to join the Northern Fleet, sailing through the Arctic Ocean. Together with several other destroyers, Razumny left the Soviet Far East in July 1942 and arrived in Murmansk three months later where she began escorting convoys, both Allied ones from Britain and the United States and local ones in the White and Barents Seas. The ship was badly damaged by German bombs while she was refitting in 1943 and was under repairs for five months. Razumny spent most of the rest of the war on convoy escort duties, although she did bombard a German-occupied town during the Petsamo–Kirkenes Offensive of October 1944.

Skory was one of 18 Storozhevoy-class destroyers built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Skory was completed in 1941 to the modified Project 7U design.

Soviet destroyer <i>Gremyashchy</i> (1959) Kanin-class destroyer

Gremyashchy was the lead ship of the Kanin-class destroyer of the Soviet Navy.

Soviet destroyer <i>Zhguchy</i> (1959) Kanin-class destroyer

Zhguchy was the second ship of the Kanin-class destroyer of the Soviet Navy.

Soviet destroyer <i>Zorky</i> (1960) Kanin-class destroyer

Zorky was the third ship of the Kanin-class destroyer of the Soviet Navy.

Soviet destroyer <i>Derzky</i> (1960) Kanin-class destroyer

Derzky was the fourth ship of the Kanin-class destroyer of the Soviet Navy.

Uporny was the sixth ship of the Kanin-class destroyer of the Soviet Navy.

Soviet destroyer <i>Boyky</i> (1959) Kanin-class destroyer

Boyky was the seventh ship of the Kanin-class destroyer of the Soviet Navy.

Soviet destroyer <i>Gordy</i> (1960) Kanin-class destroyer

Gordy was the eighth ship of the Kanin-class destroyer of the Soviet Navy.

References

In Russian

Commons-logo.svg Media related to Gnevnyy (ship, 1960) at Wikimedia Commons