Groza shortly after completion in 1932 | |
History | |
---|---|
Soviet Union | |
Name | Groza |
Namesake | Гроза, Russian for "thunder" |
Ordered | 1st Five-Year Plan |
Builder | Shipyard 190 (Zhdanov), Leningrad |
Laid down | 13 August 1927 |
Launched | 28 September 1930 |
Commissioned | 22 July 1932 |
Out of service | 12 November 1952 |
Renamed | As PKZ-51, 25 February 1953 |
Reclassified |
|
General characteristics (as built) | |
Class and type | Uragan-class guard ship |
Displacement | 490 t (480 long tons) (standard) |
Length | 71.5 m (234 ft 7 in) |
Beam | 7.4 m (24 ft 3 in) |
Draught | 2.95 m (9 ft 8 in) |
Installed power |
|
Propulsion | 2 shafts; 2 geared steam turbines |
Speed | 21 knots (39 km/h; 24 mph) |
Range | 850 nmi (1,570 km; 980 mi) at 16 knots (30 km/h; 18 mph) |
Complement | 114 men (1943) |
Armament |
|
The Soviet guard ship Groza was a Uragan-class guard ship built for the Soviet Navy during the 1920s and 1930s. The ship was one of the Series I ships known officially as Project 2. Initially assigned to the Baltic Fleet, she was transferred to the Northern Flotilla shortly after she was commissioned in 1932 and played a minor role in the 1939–1940 Winter War against Finland.
During World War II, Groza initially provided naval gunfire support during Operation Barbarossa for Soviet troops defending the Rybachy Peninsula and then escorted Allied merchant ships in Soviet waters in 1942–1943. The ship briefly served as a target ship in 1952–1953 before being hulked as an accommodation ship in early 1953.
The Russian Civil War had shut down design and construction of all ships, both naval and commercial from 1917 to 1924, thus Soviet naval architects and shipyards lacked experience when the Soviet Navy decided to replace the few old Tsarist torpedo boats still in service. [1] The initial requirement was based on that of the later batches of the World War I-era German A-class torpedo boat [2] that could carry mines as necessary to serve as fleet escorts and conduct torpedo attacks. The Uragans were almost 6 knots (11 km/h; 6.9 mph) slower than designed due to this inexperience and, in their intended role, they "were complete failures – they were too slow for use as torpedo boats and of no value as ASW vessels because of their lack of depth-charge handling equipment and underwater detection devices". [3]
The Series I Uragan-class ships, officially known as Project 2, displaced 490 metric tons (480 long tons ) at standard load and 633 t (623 long tons) at full load. They were 71.5 m (234 ft 7 in) long overall, had a beam of 7.4 m (24 ft 3 in) and a draft of 2.95 m (9 ft 8 in). [2] [4] The ships had 14 main watertight compartments and a double bottom only underneath the machinery and boiler rooms. [1] In 1943 Groza's crew numbered 114. [5]
The Uragan-class ships were powered by two Parsons geared steam turbines, each driving one propeller shaft using steam provided by a pair of three-drum boilers. The turbines of the Series I ships developed a total of 5,700 shaft horsepower (4,300 kW ) which gave them a speed in service of 21 knots (39 km/h; 24 mph). Groza carried 102–116 metric tons (100–114 long tons) of fuel oil that gave her a range of 850 nautical miles (1,570 km; 980 mi) at 16 knots (30 km/h; 18 mph). [6]
The main armament of the Uragan-class guard ships consisted of a pair of Tsarist-era 102-millimeter (4 in) Pattern 1911 guns in single mounts, one each forward and aft of the superstructure. [7] Anti-aircraft defense was intended to be provided by four single 37-millimeter (1.5 in) 11-K AA guns; these were modified versions of the British 2-pounder (40 mm (1.6 in)) guns, but deteriorating relations with the United Kingdom prevented the Soviets from buying any of these weapons. A pair of 7.62-millimeter (0.3 in) Maxim machine guns were fitted in their place. [8]
A rotating triple mount for 450 mm (17.7 in) torpedoes was fitted between the funnels. The Uragans were fitted with a pair of racks for 22 B-1 165-kilogram (364 lb) and 15 M-1 41-kilogram (90 lb) depth charges. Alternatively up to 20 KB mines could be carried using rails mounted on the main deck. No sonar was fitted so dropping depth charges was largely an act of futility. Two K-1 minesweeping paravanes were fitted on the main deck after the design was finalized. One DM-1 2-meter (6 ft 7 in) rangefinder was mounted above the open bridge and a 1-meter (3 ft 3 in) searchlight was fitted on a small platform abaft the rear funnel. [7] [9] [10]
Beginning in 1934, four semi-automatic 45 mm (1.8 in) 21-K AA guns in single mounts were being fitted to the Uragans. The 45 mm guns were generally mounted fore and aft of each of the 102 mm guns. Four years later 12.7 mm (0.50 in) DShK machine guns began replacing the Maxim machine guns. Around the same time ships began exchanging their 21-Ks for three single mounts for fully automatic 37 mm AA guns. These were usually positioned between the forward gun and the bridge, between the searchlight platform and the aft 102 mm gun, and abaft the rear gun. Some ships retained one or two of the 21-Ks into the war. When the Soviets began receiving 12.7 mm Colt-Browning machine guns through Lend-Lease, they began supplementing the DShKs aboard the Uragans, up to a total of six barrels in four mounts, with one twin-gun Colt-Browning mount replacing the searchlight in some ships. Some Uragans had a pair of BMB-1 depth charge throwers installed on the stern in 1941; Groza received hers on 13 August. Beginning in 1942, gun shields for the 102 mm guns were installed. By 1943, the ship had had a British Type 128 sonar installed. [11] [12] [13] [14]
Groza was laid down in Shipyard No. 190 (Zhdanov) in Leningrad as yard number 324 on 13 August 1927. She was launched on 28 September 1930 and commissioned on 22 July 1932 into the Baltic Fleet. [4] Construction was delayed by inadequate shipyard facilities, shortages of skilled labor and poor quality control by Soviet industry. [7] Groza, and her sisters Smerch and Uragan, were sent to the White Sea via the newly opened White Sea–Baltic Canal on 26 July 1933 and Groza was assigned to the Northern Flotilla on 21 September. [15] To lighten the ships for passage through shallows their armament was removed, along with much of the moveable deck equipment, and carried in barges that followed the ships. During the Winter War, Groza helped to transport the 104th Rifle Division to occupy Liinakhamari and provided fire support when Petsamo was occupied between 30 November and 2 December 1939. [16] On 2–3 January 1940, the ship escorted two minelayers as they laid a minefield off Petsamo. [17]
After the Axis invasion of the Soviet Union on 22 June 1941 (Operation Barbarossa), Groza and her sisters were quite active in mid-1941 providing fire support for Soviet troops defending the Zapadnaya Litsa River and the Rybachy Peninsula. On 6–7 July the ship was part of a force that landed two battalions of naval infantry that counter-attacked German forces driving on Murmansk during Operation Platinum Fox. She bombarded German positions with 36 rounds from her main guns on 1 January 1942. The ship received emergency repairs on 8–13 January and then spent the time between 24 March and 17 June under repair. Groza's crew claimed to have damaged a German U-boat on 10 September, but this has not been substantiated by post-war research. [18] [19]
Groza and Uragan were among the Soviet ships that met Convoy JW 53 as it approached Soviet waters in mid-February 1943 and arrived at Kola Inlet on 26 February. The ship was part of the escort for Convoy KB.23 from Murmansk to Archangel on 21–23 September. Six months later Groza escorted Convoy BK.2 as it sailed from Archangel to Murmansk on 5 February 1944. Six days later she is one of the Soviet escorts that rendezvoused with Convoy JW 64 on 11 February. [20] Groza was modernized from 25 November 1943 until December 1944. The ship was converted to serve as a target ship on 12 November 1952 and was hulked as a barracks ship with the name of PRZ-51 on 25 February 1953. [21]
USS Milwaukee (CL-5) was an Omaha-class light cruiser built for the United States Navy during the 1920s. The ship spent most of her early career assigned to the Asiatic and Battle Fleets. In 1941, she was assigned to the Neutrality Patrol until she was refitted in New York in late 1941. She escorted a troop convoy to the Pacific in early 1942 before returning to the South Atlantic where she patrolled for German commerce raiders and blockade runners. In November, she intercepted one of the latter, but it scuttled itself before it could be captured. In 1944, she was temporarily transferred to the Soviet Navy and commissioned as Murmansk. The ship was returned by the Soviets in 1949 and sold for scrap in December.
Chervona Ukraina was an Admiral Nakhimov-class light cruiser of the Soviet Navy assigned to the Black Sea Fleet. During World War II, she supported Soviet forces during the Sieges of Odessa and Sevastopol before being sunk at Sevastopol on 12 November 1941 by German aircraft. She was raised in 1947 and was used as a training hulk before becoming a target ship in 1950.
Krasny Krym was a light cruiser of the Soviet Navy. She was laid down in 1913 as Svetlana for the Imperial Russian Navy, the lead ship of the Svetlana class. She was built by the Russo-Baltic Shipyard in Tallinn, Estonia, and launched in 1915. Her hull was evacuated to Petrograd when the Germans approached the port in late 1917 and laid up incomplete during the Russian Revolution. The ship was completed by the Soviets in 1926. During World War II she supported Soviet troops during the Siege of Odessa, Siege of Sevastopol, and the Kerch-Feodosiya Operation in the winter of 1941–42. Krasny Krym was awarded the Guards title on 18 June 1942. The ship was reclassified as a training ship in November 1954 before being scrapped in July 1959.
The Tashkent class consisted of a single destroyer leader, built in Italy for the Soviet Navy just before World War II. Three others were ordered from shipyards in the Soviet Union, but they were cancelled before they were laid down as they were too difficult to build with the existing technology in Soviet shipyards. Completed in 1939, Tashkent participated in the Sieges of Odessa and Sevastopol in 1941–1942, during which she ferried reinforcements and supplies into those cities, evacuated wounded and refugees, and provided naval gunfire support for Soviet troops. The ship was badly damaged twice by Axis bombers before she was sunk in the harbor in mid-1942. Her wreck refloated in 1944, but it was too badly damaged to be worth repairing and was scrapped after the war.
The six Leningrad-class destroyer leaders were built for the Soviet Navy in the late 1930s. They were inspired by the contre-torpilleurs built for the French Navy. They were ordered in two batches of three ships each; the first group was designated Project 1 and the second Project 38. These ships were the first large vessels designed and built by the Soviets after the October Revolution of 1917.
Opytny was the only member of her class of destroyers built for the Soviet Navy during the 1930s. The Soviet designation for her class was Project 45. She was originally named Sergo Ordzhonikidze and was the first Soviet destroyer to be indigenously designed. Renamed Opytny in 1940, the ship was intended as a prototype for future Soviet destroyers.
Uragan-class guard ships were built for the Soviet Navy as small patrol and escort ships in four batches with slightly different specifications. Their official Soviet designations were Projects 2, 4 and 39, but they were nicknamed the "Bad Weather Flotilla" by Soviet sailors by virtue of their meteorological names. Eighteen were built from 1927 to 1938 and those of the Baltic and Northern Fleets participated in the 1939–1940 Winter War against Finland. The Uragan class served during World War II in all four of the Soviet Fleets, including Black Sea and Pacific Fleets. Four of those ships assigned to the Baltic Fleet were lost during the war, including two during the Soviet evacuation of Tallinn in late 1941.
The Admiral Nakhimov-class cruisers were a group of four light cruisers built for the Imperial Russian Navy just before World War I began in 1914. Construction was interrupted by the Russian Revolution and only two of the ships were eventually completed well after the end of the Russian Civil War by the Soviets. Chervona Ukraina was the first ship completed and was built to essentially the original design. Krasnyi Kavkaz underwent heavy modifications and was completed five years after Chervona Ukraina. Both ships participated in the Sieges of Odessa and Sevastopol after the Germans invaded Russia in June 1941. They ferried troops into the cities, evacuated wounded and bombarded the besieging German troops. Chervona Ukraina was bombed and sunk by dive bombers in November during one of these missions and Krasny Kavkaz was badly damaged by the same type of aircraft in January 1942. After her lengthy repairs were completed, the ship transported reinforcements to cities on the Black Sea coast during the Battle of the Caucasus. She was reclassified as a training ship in 1947 before she was sunk as a target in 1956. Chervona Ukraina was salvaged in 1947 and then became a hulked. She became a target ship in 1950.
Gremyashchy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Baltic Fleet and was later transferred to the Northern Fleet in 1941.
Leningrad was the lead ship of her class of six destroyer flotilla leaders built for the Soviet Navy during the 1930s, one of the three Project 1 variants. Completed in 1936, the ship was assigned to the Baltic Fleet and played a minor role in the Winter War against Finland in 1939–1940. After the start of Operation Barbarossa, the German invasion of the Soviet Union in June 1941, Leningrad covered minelaying operations, laid mines herself, and provided naval gunfire support to Soviet units. She escorted ships during the evacuation of Tallinn, Estonia, in August and then bombarded German troops during the Siege of Leningrad. The ship was assigned to evacuate Soviet troops from their enclave in Hanko, Finland, in November, but was badly damaged by mines en route and forced to return to Leningrad for repairs. After they were completed, Leningrad resumed shelling German positions and continued to do so until the Leningrad–Novgorod Offensive drove them away from the city in January 1944.
Minsk was one of six Leningrad-class destroyer leaders built for the Soviet Navy during the 1930s, one of the three Project 38 variants. Completed in 1939, the ship was assigned to the Baltic Fleet and played a minor role in the Winter War against Finland in 1939–1940. After the start of Operation Barbarossa, the German invasion of the Soviet Union in June 1941, Minsk covered minelaying operations and provided naval gunfire support to Soviet units. She escorted ships during the Soviet evacuation of Tallinn, Estonia, in late August. The ship was sunk by German dive bombers on 23 September, although her wreck was salvaged in 1942 and repaired. Minsk was recommissioned in 1943 but the repairs were not completed until the following year. The ship was reclassified as a training ship in 1951, then became a target ship in 1958 and was sunk that year.
The Kiev class was designed in 1939 for the Soviet Navy as a smaller class of destroyer leaders after the cancellation of the Tashkent-class ships that had been intended to be built in the Soviet Union. Only three ships were begun; one was cancelled and scrapped before the Axis invasion in mid-1941 and construction of the other two was suspended during the war. The navy considered completing them under a new Project 48-K configuration afterwards, but decided against that as they would have been competing against a more modern design that lacked the stability problems that the 48-K design would have had. The Soviets either scrapped them or used them as targets.
Tashkent was the lead ship of her class of destroyer leaders, built in Italy for the Soviet Navy just before World War II. The problems of the previous Leningrad-class destroyer leaders demonstrated that Russian design experience had atrophied in the years since the Russian Revolution of 1917, and the Soviets contracted for design assistance from Fascist Italy in the mid-1930s. Delivered without any armament in 1939, Tashkent was given a temporary gunnery outfit when she entered service with the Black Sea Fleet later that year. She had her permanent armament installed shortly before the Axis Powers invaded the Soviet Union in mid-1941.
Zheleznyakov was one of eight Fidonisy-class destroyers built for the Imperial Russian Navy during World War I. She was originally named Korfu (Корфу) before she was renamed Petrovsky (Петровский) in 1925 and Zheleznyakov (Железняков) in 1939 after anarchist Anatoli Zhelezniakov.
Shaumyan (Шаумян) was one of eight Fidonisy-class destroyers built for the Imperial Russian Navy during World War I. She was originally named Levkas (Левкас) before she was renamed Shaumyan in 1925. Left unfinished during the Russian Revolution in 1917 and later captured by Ukrainian and White forces, the destroyer was completed by the Soviets in 1925 following their victory in the Russian Civil War.
Grozny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1938, she was initially assigned to the Baltic Fleet before being transferred to the Northern Fleet in mid-1939 where she participated in the 1939–1940 Winter War against the Finns.
Gromky was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1938, the ship was initially assigned to the Baltic Fleet before being transferred to the Northern Fleet in mid-1939 where she played a minor role in the 1939–1940 Winter War against Finland.
Sokrushitelny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was initially assigned to the Baltic Fleet before she was transferred to the Northern Fleet in late 1939. After the Axis invasion of the Soviet Union in June 1941, the ship laid several minefields in the White and Barents Seas. Sokrushitelny spent most of her service escorting the Arctic Convoys, run by the British to provide weapons and supplies to the Soviets, or providing naval gunfire support to Soviet troops along the Arctic coast. The ship engaged a German ship just once, while defending Convoy QP 13 in early 1942. While escorting Convoy QP 15 in November, she sank during a severe storm after breaking in half. Most of her crew was rescued by other destroyers sent to her aid, although 35 crewmen were lost.
Razumny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Originally named Prochny, she was renamed Razumny before completion in 1941, and was assigned to the Pacific Fleet. About a year after the German invasion of Russia in June 1941, she was ordered to join the Northern Fleet, sailing through the Arctic Ocean. Together with several other destroyers, Razumny left the Soviet Far East in July 1942 and arrived in Murmansk three months later where she began escorting convoys, both Allied ones from Britain and the United States and local ones in the White and Barents Seas. The ship was badly damaged by German bombs while she was refitting in 1943 and was under repairs for five months. Razumny spent most of the rest of the war on convoy escort duties, although she did bombard a German-occupied town during the Petsamo–Kirkenes Offensive of October 1944.