Summer Hill | |||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Eastbound view from Platform 2, October 2023 | |||||||||||||||||||||||||
| General information | |||||||||||||||||||||||||
| Location | Carlton Crescent, Summer Hill | ||||||||||||||||||||||||
| Coordinates | 33°53′26″S151°08′22″E / 33.89055°S 151.13951°E | ||||||||||||||||||||||||
| Elevation | 26 metres (85 ft) | ||||||||||||||||||||||||
| Owned by | Transport Asset Holding Entity | ||||||||||||||||||||||||
| Operated by | Sydney Trains | ||||||||||||||||||||||||
| Line(s) | Main Suburban | ||||||||||||||||||||||||
| Distance | 7.03 kilometres from Central | ||||||||||||||||||||||||
| Platforms | 3 (1 side, 1 island) | ||||||||||||||||||||||||
| Tracks | 6 | ||||||||||||||||||||||||
| Connections | | ||||||||||||||||||||||||
| Construction | |||||||||||||||||||||||||
| Structure type | Ground | ||||||||||||||||||||||||
| Bicycle facilities | Yes | ||||||||||||||||||||||||
| Accessible | Yes | ||||||||||||||||||||||||
| Other information | |||||||||||||||||||||||||
| Status |
Staffed: 6am to 7pm
| ||||||||||||||||||||||||
| Station code | SMH | ||||||||||||||||||||||||
| Website | Transport for NSW | ||||||||||||||||||||||||
| History | |||||||||||||||||||||||||
| Opened | 15 September 1879 | ||||||||||||||||||||||||
| Electrified | Yes | ||||||||||||||||||||||||
| Passengers | |||||||||||||||||||||||||
| 2023 [1] |
| ||||||||||||||||||||||||
| Services | |||||||||||||||||||||||||
| |||||||||||||||||||||||||
Summer Hill railway station is a heritage-listed railway station located on the Main Suburban line, serving the Sydney suburb of Summer Hill. It is served by Sydney Trains T2 Leppington & Inner West Line and occasional T3 Liverpool & Inner West Line services.
Summer Hill station opened on 15 September 1879. [3] [4] The Main Suburban line through Summer Hill was quadruplicated in 1892, [5] and sextuplicated in 1927 in association with electrification works. [6] [7]
As part of the 1892 work, the northern side platform was converted to an island platform and a new platform constructed on the most northern line. The latter was demolished as part of the 1927 works. [7]
In 2004, Summer Hill was provided with lift facilities which are accessed from the subway. Initial plans called for a new overhead footbridge to access the station; however, this was opposed by locals on both aesthetic and access grounds, and the plans were subsequently altered to the current arrangement. [8]
| Platform | Line | Stopping pattern | Notes |
| 1 | not in regular use | ||
|---|---|---|---|
| 2 | services to Central & the City Circle | [9] | |
| services to Central & the City Circle (weekday early morning, late night and weekends only) | [10] | ||
| 3 | services to Homebush, Leppington & Parramatta | [9] | |
| services to Liverpool via Regents Park (weekday early morning, late night and weekends only) | [10] |
Summer Hill station is served by one NightRide route: