Tinsley was a railway marshalling yard near Tinsley in Sheffield, England, used to separate railway wagons from incoming trains and add them to new trains. It was sited immediately west of the M1 motorway, about one mile north of the Catcliffe junction. It was opened in 1965, as a part of a major plan to rationalise all aspects of the rail services in the Sheffield area; it closed in stages from 1985, with the run-down of rail freight in Britain. It was also the site of Tinsley Traction Maintenance Depot (TMD), which was closed in 1998; [1] at its peak, 200 locomotives were allocated to this depot.
As of 2011, an intermodal road-rail freight terminal Sheffield International Rail Freight Terminal (SIRFT) is located on part of the site; it was built c2008. A set of sidings is operated by DB Schenker Rail (UK) serving the nearby Outokumpu steel works.
In 1961, a tenth of the rail-borne freight in Britain originated in the Sheffield district. [2] However, as with many areas, the provision of freight facilities had grown through cramped, piecemeal developments associated with the various operating companies that built Britain's rail system. With the region being one of the main heavy industry heartlands of Britain, government money was made available to remedy this situation. Central economic planning and economic self-sufficiency were government policy; the situation was seen as a major limit on Britain's economic growth.[ citation needed ]
The Sheffield district rail rationalisation plan of the 1960s called for the replacement of the majority of the marshalling yards in the Sheffield area with one large yard. A location on the Sheffield District line was chosen and work started in 1963 with new connections being built at Treeton, Broughton Lane and Tinsley South. The 80 yard Tinsley Wood Tunnel and approach cuttings were filled with some of the material excavated from the new yard, the remaining material being transported to a tip at Orgreave. The location allowed easy access to the brand new central Sheffield Freight Terminal at Grimesthorpe, and the new Freightliner terminal on the site of the Masborough Sorting Sidings in Rotherham, one of the many yards that Tinsley replaced. [3]
The locomotive depot opened in 1964, with diesel locomotives moving in from a temporary home in the old Grimesthorpe steam locomotive depot and Darnall diesel (former electric locomotive) depot, Darnall steam locomotive depot being closed to become a wagon-repair depot. Other steam locomotive depots at Millhouses and Canklow were closed and the last steam locomotives based in the Sheffield area were scrapped, along with many redundant sidings dotted about the area.
The Tinsley complex was opened by Dr Richard Beeching, former Chairman of the British Railways Board, on 29 October 1965. [4]
From its outset, Tinsley was to be a "network yard": a major railfreight node where wagon-load freight trains would arrive, be split and sorted into new trains for onward departure to other network yards, directly to the many rail-connected businesses in the area in "trip" freights, or to the freight terminal for unloading and forwarding by road. To assist with this, it featured gravity-assisted shunting and a new computerised system of wagon control, along the lines of large US rail freight yards.
At the time of opening, the yard was handling 3,000 wagons a day. Incoming trains were split in the 11 reception sidings, propelled over the hump in the yard, from where the individual wagons rolled down a slope and were automatically sorted into new trains on the yard's 50 main sorting sidings. The yard had its own dedicated class of shunting locomotive (British Rail Class 13) for this purpose as BR's standard class of shunting locomotive was not powerful enough. [1] Each of the main sorting sidings was fitted with computer-controlled retarders to either slow the rolling wagons down before they hit other wagons already on the siding, or give wagons rolling too slowly a boost to move them along to the correct position in a particular siding. This wagon-control system, manufactured by Dowty, was very complex, needed almost constant maintenance, and crucially could not handle the longer wheelbase wagons that were already becoming prevalent and required individual shunting. There was an express freight and departure yard of 10 sidings, and a 25-road secondary yard for local freight trains (with its own hump).
The Manchester-Sheffield-Wath electrification was extended into the yard in 1965 [5] to allow electrically hauled trains to the Manchester area to be handled. Seventeen miles of track from Woodburn Junction and Darnall Junction via Broughton Lane to the Reception Sidings at Catcliffe were electrified at 1500 V DC. The insulators were capable of being used at 6.25 kV AC if ever required, with the option of 25 kV AC with minimal conversion costs. [6] Unlike similar electrified marshalling yards, to save on costs the main body of the sorting sidings was not electrified: a half of the arrival sidings was electrified for incoming electric trains; departing electric trains either had to use the southern third of the main sorting sidings (the western part of which were wired for electric trains) or had to be drawn out of the main sorting sidings by diesel locomotives into electrified departure roads where the electric locomotives were attached.
From an early stage the yard was not used at capacity: by the late 1960s road competition was biting hard into the railways' goods traffic, and in particular the wagon-load freight that required hump-yards like Tinsley was already declining. The economic malaise and industrial decline of the 1970s exacerbated this. By the 1980s British Rail was closing its remaining wagon-load freight facilities as being uneconomic.
In 1981 the electrification was removed with the closure of the Manchester-Sheffield-Wath system.
On 17 December 1984 [7] the arrival sidings and hump were closed, the wagon-control system removed and the remaining Class 13s scrapped. The under-utilised Grimesthorpe Freight Terminal was severely damaged by a major fire on 14 December 1984 and was relegated to being a steel-loading facility. The yard connections were relaid to allow easier handling of block-load trains which now dominated rail freight in Britain. By 1995 the decline in British heavy industry meant that this type of traffic had also declined massively, resulting in the closure of the locomotive depot on 27 March 1998. [8] The eastern connections (both north- and south-facing chords) to the Midland 'Old Road' were closed in 1993 however the track is still in situ, and the western connection to the Midland Main Line (and goods depot at Grimesthorpe) at Brightside junction was lifted in 1999. Both chords to the ex MSLR/GCR line from Woodburn to Rotherham (via Broughton Lane junction and Tinsley South junction) remain open. The rest of the yard progressively fell into disuse over the next ten years.
A few years later only the main sorting sidings remained: a part of these were to be used to stable steel trains destined for the Sheffield area; the rest of the remaining sidings were used to store surplus-to-requirements rolling stock in a poor state of repair. However, in 2007 the remaining sidings were lifted and a new, much smaller yard laid, additionally a new rail-linked distribution and goods transshipment centre – Sheffield International Rail Freight Terminal (SIRFT) was constructed.
In 2006 the sidings at Tinsley reached the national news when Daniel Matthews, an engineering apprentice, took to the site and joyrode a Class 08 shunting engine up and down the tracks. [9]
In 2008 EWS operated the sidings at Tinsley. [10] [11] As of 2011 the DB Cargo UK yard handles steel for Avesta Sheffield (now part of Outokumpu). [12]
In the mid-2000s, land adjacent to the northwestern area of the former yard was used for the construction of the Sheffield International Rail Freight Terminal (SIRFT). The terminal consists of two warehouses of approximately 30,000 m2 (320,000 sq ft). [13] SIRFT is rail connected with through connections southwards and northwards, and is equipped to deal with conventional and containerised wagon loads. [10]
A third rail connected warehousing unit (of up to approximately 25,000 m2 (270,000 sq ft)) has approval for construction (as of 2011). [14] In 2017 it was reported that the loading gauge had been increased to the W10 standard to allow the facility to handle 2.9 m (9 ft 6 in) Hi-Cube containers. [15]
In 2021 Newell & Wright, a British road haulage company, opened an intermodal terminal on the site of the former marshalling yard. A new freight service between Felixstowe and the yard began in July 2021. [16] The service is a partnership between GB Railfreight and Maersk. [17]
Severn Tunnel Junction railway station is a minor station on the western side of the Severn Tunnel in the village of Rogiet, Monmouthshire, Wales. It is 123.5 miles (198.8 km) from London Paddington and lies at the junction of the South Wales Main Line from London and the Gloucester to Newport Line.
Railfreight Distribution was a sub-sector of British Rail, created by the division in 1987 of British Rail's previous Railfreight sector. It was responsible for non-trainload freight operations, as well as Freightliner and Intermodal services. In its early years, the division was occasionally referred to as Speedlink Distribution. It was later responsible for freight operations through the Channel Tunnel.
A rail yard, railway yard, railroad yard (US) or simply yard, is a series of tracks in a rail network for storing, sorting, or loading and unloading rail vehicles and locomotives. Yards have many tracks in parallel for keeping rolling stock or unused locomotives stored off the main line, so that they do not obstruct the flow of traffic. Cars or wagons are moved around by specially designed yard switcher locomotives (US) or shunter locomotives (UK), a type of locomotive. Cars or wagons in a yard may be sorted by numerous categories, including railway company, loaded or unloaded, destination, car type, or whether they need repairs. Yards are normally built where there is a need to store rail vehicles while they are not being loaded or unloaded, or are waiting to be assembled into trains. Large yards may have a tower to control operations.
The Manchester–Sheffield–Wath electric railway was an electrification scheme on British railways. The route featured long ascents on both sides of the Pennines with the long Woodhead Tunnel at its central summit close to the Woodhead pass. This led to the route being called the Woodhead Line.
The Sheffield District Railway was a 3+1⁄2-mile (6 km) railway line in South Yorkshire, England. It was built to give the Lancashire, Derbyshire and East Coast Railway access to Sheffield, primarily for goods traffic, for which a large goods depot at Attercliffe, in Sheffield, was built. The construction was sponsored by the LD&ECR and the Great Eastern Railway together, with the support of the Midland Railway, which agreed running powers over sections of its own lines. The Sheffield District Railway opened in 1900. The LD&ECR operated the passenger service, although the Midland Railway later ran passenger trains too. The SDR did not have rolling stock and did not operate trains itself. The LD&ECR was absorbed by the Great Central Railway in 1907, and the GCR inherited the LD&ECR running powers.
The Sheffield District Rail Rationalisation Plan was a series of linked railway civil engineering projects, station and line closures and train route changes that took place in and around Sheffield, South Yorkshire. The majority of these changes took place in the 1960s and early 1970s, however the plan, by now much modified in the face of rapidly dwindling freight traffic, was not fully realised until the 1980s.
SBB Cargo is a subsidiary of Swiss Federal Railways (SBB) specialising in railfreight and is operated as the Freight division. Swiss Federal Railways is a former state-owned and -controlled company that was transformed in 1999 into a joint-stock company under special legislation following the first Swiss railway reform and divided up into three independent divisions: Passenger, Freight and Infrastructure. The headquarters of Swiss Federal Railways SBB Cargo AG, the Freight division's official designation, are in Olten. In 2013, SBB Cargo had 3,061 employees and achieved consolidated sales of CHF 953 million. In Switzerland, SBB Cargo is the market leader in rail freight, transporting over 175,000 tons of goods every day. This corresponds to the weight of 425 fully loaded jumbo jets.
Tinsley Motive Power Depot, latterly Tinsley Traction Maintenance Depot (TMD), was a railway depot in Tinsley, South Yorkshire, near Sheffield. Access by road was from Brinsworth, near Rotherham. The depot was situated on the freight line between Treeton Junction and the A631 Shepcote Lane.
Wath marshalling yard, also known as Wath concentration yard, was a large railway marshalling yard specifically designed for the concentration of coal traffic. It was set at the heart of the South Yorkshire Coalfield, at Wath-upon-Dearne, approximately halfway between Barnsley and Doncaster, in the United Kingdom. It opened in 1907 and closed in 1988.
A goods station or freight station is, in the widest sense, a railway station where, either exclusively or predominantly, goods, such as merchandise, parcels, and manufactured items, are loaded onto or unloaded off of ships or road vehicles and/or where goods wagons are transferred to local sidings.
Feltham marshalling yard, also known as Feltham hump yard, was a large railway marshalling yard designed for the concentration of freight traffic to and from South West London, and for transfer to other marshalling yards in London. It was built on the Waterloo to Reading Line. It opened in 1918 and was closed by British Railways on 6 January 1969.
Bescot Yard is a railway yard in Bescot, a suburb of Walsall in the West Midlands, operated by DB Cargo UK. The yard is the major freight yard of the region, handling all of the rail freight movements and most of the railfreight traffic around the West Midlands.
Tees Marshalling Yard is a railway marshalling yard, used to separate railway wagons, located near Middlesbrough in North Yorkshire, Northern England.
Dresden-Friedrichstadt station is a freight yard that is, along with the two passenger stations of Dresden Hauptbahnhof and Dresden-Neustadt, a central component of the railway node of Dresden in the German state of Saxony. The station precinct, which is located in the Dresden district of Friedrichstadt, also includes a locomotive depot and a regional passenger station.
Healey Mills Marshalling Yard was a railway marshalling yard located in the village of Healey, south west of Ossett in West Yorkshire, England. The yard was opened in 1963 and replaced several smaller yards in the area. It was part of the British Transport Commission's Modernisation plan, and so was equipped with a hump to enable the efficient shunting and re-ordering of goods wagons. The yard lost its main reason for existence through the 1970s and 1980s when more trains on the British Rail system became block trains where their wagons required less, or more commonly, no shunting.
Stourton Freightliner Terminal, is a railfreight intermodal transport hub located in Stourton, Leeds, England. It is operated by the Freightliner Group, and has services arriving and departing for ports in Felixstowe, Southampton and Tilbury in the south of England. Stourton serves as a dedicated collection and delivery point for containers across Yorkshire, with a minor sub-service to Teesport in Middlesbrough by rail.
Basford Hall Yard is a railway marshalling yard near the town of Crewe, Cheshire, England. The yard, which is 0.93 miles (1.5 km) south of Crewe railway station, was opened in 1901 by the London and North Western Railway (LNWR). Initially used to marshal trains, the site now acts as a hub mainly for Freightliner intermodal trains, but also houses departmental sidings as used by Freightliner Heavy Haul, and other operators. For a period in the 1930s, Basford Hall was the busiest marshalling yard in Europe, handling between 28,000 and 47,000 wagons every week.
Dringhouses Yard was a railway freight marshalling yard on the East Coast Main Line (ECML), south of York railway station in England. The yard was built during the First World War to help with the increase in traffic caused by the support to the British war effort. The yard was modernised in the 1960s, being fitted with a hump (knuckle), to ease shunting operations. It was closed to all traffic in 1987 after the loss of local railfreight traffic around York.
Washwood Heath Yard was a marshalling yard, and later sidings, to the east of Birmingham, in the West Midlands, England. The site was first host to sidings in the late 1870s, which were upgraded to a hump marshalling yard by 1900 which survived until the early 1980s. Thereafter, the site was flat shunted, but moreover used as a layover yard, rather than used for the transfer or interchange of wagons between trains. It was run-down and closed in late 2008 due to the loss of most of the automotive traffic that it was latterly used for. The lines were removed by 2020.
Perth New Yard is a former railway marshalling yard in the city of Perth, Scotland. The yard was built in the early 1960s to gather traffic from around the Perth area and goods wagons from the lines radiating from Perth. It was latterly used as an engineering and wagon storage depot until it was finally closed in 2008. Though abandoned, the site is registered with Canmore, the Historic Environment Scotland.