Healey Mills Marshalling Yard was a railway marshalling yard located in the village of Healey, south west of Ossett in West Yorkshire, England. The yard was opened in 1963 and replaced several smaller yards in the area. It was part of the British Transport Commission's Modernisation plan, and so was equipped with a hump to enable the efficient shunting and re-ordering of goods wagons. The yard lost its main reason for existence through the 1970s and 1980s when more trains on the British Rail system became block trains where their wagons required less, or more commonly, no shunting.
Facilities at the site were progressively run down until it closed completely in 2012.
Construction on the yard started in 1959 and was completed four years later. Permission was sought from the National Coal Board to build the yard as it was built upon a profitable coal seam. The last coal was worked out in 1961 and stabilisation works were undertaken to enable the yard to be constructed. [1] It was officially opened to traffic on 23 July 1963 by Lord Robens, who was chairman of the National Coal Board at the time. [2] The yard had been conceived in the mid-1950s as part of the British Transport Commission's Modernisation Plan, which sought to rejuvenate the railways. Healey Mills was one of many hump yards being built, for whose traffic was planned in the 1950s, but by the time they were commissioned, lorries and fast motorways were eating into their ability to operate cost-effectively. [3] Well into the 1970s, the traffic at Healey Mills was in excess of the 4,000 wagons per week that it was designed for; in one study week in 1966, over 16,500 wagons were sorted in the yard. [4] Its location on an east/west axis meant that it was ideally positioned for the coal trains destined for either Lancashire, or the east coast ports of Hull, Immingham and Goole. [5]
The new yard cost £3.75 million in 1963 (equivalent to £55 million in 2013), covered over 140 acres (57 ha) and stretched for 1.5 miles (2.4 km) alongside the railway and the River Calder. [6] During construction, the site was flooded by the River Calder. In case of a re-occurrence of flooding, the control tower was built at 40 feet (12 m) above rail level. [6] The yard was placed in the Healey Mills area near Ossett, and was located between the running lines of the existing Calder Valley railway. This involved the engineers having to widen the running lines in a bow formation and diverting the course of the River Calder. [7] Four new bridges were built across the Calder and the relocation of the Osset Sewage Works was necessary before the main construction could start. [8]
The hump was installed at the west end of the yard so that traffic from the Yorkshire pits could be marshalled via a reversal over it, and then staged for delivery to either the east coast ports or Lancashire. [9] It contained 120 sidings (covering 57 miles (92 km) of track), fourteen reception sidings over a semi-automated hump that led to 50 sorting sidings, and then a secondary yard with 25 sidings. The yard also had thirteen departure roads as well as fifteen staging sidings for block (trainload freight) trains. [10]
Healey Mills, which was situated between Mirfield and Wakefield Kirkgate replaced several smaller yards in the Dewsbury/Wakefield area (namely Brighouse, Crofton Laden, Horbury Junction Sidings, Low Moor, Mirfield, Mytholmroyd, New Withams, Turners Lane and Wakefield Exchange). [11] Three other yards, Copley Hill, Crofton Empty and Hillhouse, worked in a smaller capacity than before as some of their traffic was transferred to Healey Mills. [12] When British Rail launched Speedlink (their air-braked wagonload network) in 1975, Healey Mills was one of twelve yards across the network where traffic could be swapped and interchanged. However, Speedlink was withdrawn from Healey Mills just ten years later in 1985. [13]
Whilst a disused chord at Horbury to the east was used to stable the Royal Train on several occasions, in 1977, the Queen slept in the yard when the Royal Train was berthed overnight in the sidings. [14]
In March 1982, a slow speed incident caused the derailment of some wagons on a freight train, one of which was a nuclear flask wagon. Questions were put to the Secretary of State for Transport, but as the derailment was at very low speed and no injuries occurred, there was no official post-accident investigation. [15] The hump was closed in 1984 when average loads over it were 100 wagons per day, well below the 4,000 it was designed for. Much of the coal traffic that went through, or passed by the yard, was marshalled into merry-go-round (MGR) trains and so did not need shunting or marshalling. Coupled with this, the closure of Yorkshire coal mines in the 1980s meant that the traffic through the yard had dwindled. [16]
By 1985, the yard could not be accessed directly from the west; the hump and reception sidings were closed and lifted. Traffic arriving from the Calder Valley or Standedge lines, would need to reverse in the departure sidings on the east end side of the yard. The sidings on the southern side of the yard were still important for re-staffing of locomotives, though by this time, the throughput at Healey Mills was as low as 18 trains per week due to a drastic cutback in coal operations. [17]
Wagonload traffic still called, and was marshalled at Healey Mills, throughout the 1960s, 70s, and 80s, with it finally ceasing in 1985. [13] However, it saw a small resurgence when the pre-privatised freight companies launched a wagonload service in the early 1990s. It lost its marshalling responsibilities again in May 1998, when Doncaster Belmont yard superseded Healey Mills as the gathering point and hub for Yorkshire. Doncaster Belmont's position on the East Coast Main Line meant that it was geographically and strategically better placed to handle the wagonload traffic (now branded as Enterprise under EWS ownership). [18]
The signing on point for traincrew was closed in February 2012 when it was transferred to some portacabins near to Wakefield Kirkgate railway station. The depot buildings were demolished in 2016 and most of the track has been removed. [19]
In February 2017, redundant carriages and track were used in a crash exercise using railway staff and the emergency services. [20]
The site at Healey Mills was under consideration as a Rolling Stock Depot (RSD) for HS2 trains in the Yorkshire area; the proposed depot has been outlined at Gateway 45 in Leeds. [21]
A depot was not built at the yard to accommodate steam trains, but in June 1966, one was built for diesel locomotives. [22] It was the first built by the Eastern Region of British Rail that was not associated with, or had replaced, an existing steam shed, although it was coded 56B under Wakefield Shed. [23] Steam trains had previously been supplied by Wakefield Shed (56A), which then closed in 1967. [24] The last steam trains on British Rail were operating from Rose Grove depot in Lancashire in August 1968. This brought a daily steam locomotive hauled train from Rose Grove to Healey Mills. [25] Diesel shunters operating in the yard before the diesel depot was built, had to run to Hammerton Street depot in Bradford for servicing. [26]
Allocation of locomotives at Healey Mills numbered around 70 throughout the 1970s, but had risen slightly to 77 by 1982. [27] This was composed of classes 03, 08, 37, 40, 47 and class 56, though the class 56 locomotives were only allocated to the depot for two years. [28] Under TOPS, the depot code was HM. [29]
Due to the loss of traffic and the closure of the hump yard, the depot was downgraded from a traction maintenance depot (TMD) into a traction servicing depot. It lost its allocation of mainline locomotives, which were shared between Gateshead, Immingham, March, Stratford, Tinsley and Thornaby, and its shunters were sent to Leeds Holbeck. [19]
In 1993, Trainload Petroleum reopened the depot at Healey Mills, though this was short-lived, and was only used for fuelling and minor maintenance of locomotives. [30]
Severn Tunnel Junction railway station is a minor station on the western side of the Severn Tunnel in the village of Rogiet, Monmouthshire, Wales. It is 123.5 miles (198.8 km) from London Paddington and lies at the junction of the South Wales Main Line from London and the Gloucester to Newport Line.
A rail yard, railway yard, railroad yard (US) or simply yard, is a series of tracks in a rail network for storing, sorting, or loading and unloading rail vehicles and locomotives. Yards have many tracks in parallel for keeping rolling stock or unused locomotives stored off the main line, so that they do not obstruct the flow of traffic. Cars or wagons are moved around by specially designed yard switcher locomotives (US) or shunter locomotives (UK), a type of locomotive. Cars or wagons in a yard may be sorted by numerous categories, including railway company, loaded or unloaded, destination, car type, or whether they need repairs. Yards are normally built where there is a need to store rail vehicles while they are not being loaded or unloaded, or are waiting to be assembled into trains. Large yards may have a tower to control operations.
Tinsley was a railway marshalling yard near Tinsley in Sheffield, England, used to separate railway wagons from incoming trains and add them to new trains. It was sited immediately west of the M1 motorway, about one mile north of the Catcliffe junction. It was opened in 1965, as a part of a major plan to rationalise all aspects of the rail services in the Sheffield area; it closed in stages from 1985, with the run-down of rail freight in Britain. It was also the site of Tinsley Traction Maintenance Depot (TMD), which was closed in 1998; at its peak, 200 locomotives were allocated to this depot.
Toton Traction Maintenance Depot or Toton Sidings is a large traction maintenance depot located in Toton, Nottinghamshire. The TOPS depot code for the depot is TO. Before TOPS, the shed code was 16A.
Healey is a small village and industrial district on the east bank of the River Calder in the southwestern outskirts of Ossett, near Wakefield in West Yorkshire, England. It developed during the industrial revolution when three cloth and fulling mills were built.
The Sheffield District Rail Rationalisation Plan was a series of linked railway civil engineering projects, station and line closures and train route changes that took place in and around Sheffield, South Yorkshire. The majority of these changes took place in the 1960s and early 1970s, however the plan, by now much modified in the face of rapidly dwindling freight traffic, was not fully realised until the 1980s.
Wath marshalling yard, also known as Wath concentration yard, was a large railway marshalling yard specifically designed for the concentration of coal traffic. It was set at the heart of the South Yorkshire Coalfield, at Wath-upon-Dearne, approximately halfway between Barnsley and Doncaster, in the United Kingdom. It opened in 1907 and closed in 1988.
Horbury and Ossett railway station formerly served the town of Horbury in West Yorkshire, England. It was located on the Manchester and Leeds Railway, which ran along the Calder valley establishing a key link between Liverpool and Manchester to the west, and Leeds, York and Hull to the east. The station was opened with the inauguration of the line in 1840, on the west of the Horbury Bridge Road, to the south-west of the town. Later a new, more substantial structure was built just to the east.
Feltham marshalling yard, also known as Feltham hump yard, was a large railway marshalling yard designed for the concentration of freight traffic to and from South West London, and for transfer to other marshalling yards in London. It was built on the Waterloo–Reading line. It opened in 1918 and was closed by British Railways on 6 January 1969.
Bescot Yard is a railway yard in Bescot, a suburb of Walsall in the West Midlands, operated by DB Cargo UK. The yard is the major freight yard of the region, handling all of the rail freight movements and most of the railfreight traffic around the West Midlands.
Speedlink was a wagonload freight service that used air-braked wagons and was operated by British Rail from 1977 to 1991.
Tees Marshalling Yard is a railway marshalling yard, used to separate railway wagons, located near Middlesbrough in North Yorkshire, Northern England.
Knottingley TMD is a traction maintenance depot located in Knottingley, West Yorkshire, England. The depot is situated on the Pontefract Line and is near Knottingley station. It opened in 1967 to maintain the locomotives and hopper wagons for a planned 75 Merry-go-round trains a day, expected to use the Wakefield and Goole line.
Dresden-Friedrichstadt station is a freight yard that is, along with the two passenger stations of Dresden Hauptbahnhof and Dresden-Neustadt, a central component of the railway node of Dresden in the German state of Saxony. The station precinct, which is located in the Dresden district of Friedrichstadt, also includes a locomotive depot and a regional passenger station.
The Condor was an overnight fast freight train service operated by British Railways between London and Glasgow from 1959 until 1965 with all freight carried in containers. The name was derived from 'CONtainers DOoR-to-Door'.
Basford Hall Yard is a railway marshalling yard near the town of Crewe, Cheshire, England. The yard, which is 0.93 miles (1.5 km) south of Crewe railway station, was opened in 1901 by the London and North Western Railway (LNWR). Initially used to marshal trains, the site now acts as a hub mainly for Freightliner intermodal trains, but also houses departmental sidings as used by Freightliner Heavy Haul, and other operators. For a period in the 1930s, Basford Hall was the busiest marshalling yard in Europe, handling between 28,000 and 47,000 wagons every week.
Dringhouses Yard was a railway freight marshalling yard on the East Coast Main Line (ECML), south of York railway station in England. The yard was built during the First World War to help with the increase in traffic caused by the support to the British war effort. The yard was modernised in the 1960s, being fitted with a hump (knuckle), to ease shunting operations. It was closed to all traffic in 1987 after the loss of local railfreight traffic around York.
Milford Sidings are a set of railway sidings in South Milford, North Yorkshire, England. The railways through the site were initially opened in 1834 and 1840, when transfer and marshalling yards opened too, which handled mostly coal. However, the current sidings were developed in the 1980s to function as layover sidings for coal trains to and from the Aire Valley power stations. The sidings have access to several railway lines radiating in almost all directions.
Washwood Heath Yard was a marshalling yard, and later sidings, to the east of Birmingham, in the West Midlands, England. The site was first host to sidings in the late 1870s, which were upgraded to a hump marshalling yard by 1900 which survived until the early 1980s. Thereafter, the site was flat shunted, but moreover used as a layover yard, rather than used for the transfer or interchange of wagons between trains. It was run-down and closed in late 2008 due to the loss of most of the automotive traffic that it was latterly used for. The lines were removed by 2020.
Perth New Yard is a former railway marshalling yard in the city of Perth, Scotland. The yard was built in the early 1960s to gather traffic from around the Perth area and goods wagons from the lines radiating from Perth. It was latterly used as an engineering and wagon storage depot until it was finally closed in 2008. Though abandoned, the site is registered with Canmore, the Historic Environment Scotland.