USS Santa Ana (ID-2869) (later USAT John L. Clem) in New York Harbor, bringing home troops from World War I, July 1919 | |
History | |
---|---|
United States | |
Name |
|
Namesake | US Army Major General John Lincoln Clem |
Owner |
|
Port of registry | United States |
Builder | William Cramp & Sons, Philadelphia |
Yard number | 442 |
Laid down | 1 February 1917 |
Launched | 13 October 1917 |
Completed | 1 January 1918 |
In service |
|
Identification |
|
Fate | Sold for scrap, 1948 |
General characteristics | |
Tonnage | |
Displacement | 8890 |
Length |
|
Beam | 51 ft 2 in (15.6 m) |
Draft | 22 ft 9 in (6.9 m) |
Depth | 33.8 ft (10.3 m) |
Installed power | 633 Nhp |
Propulsion | 4 boilers, 1 quadruple expansion engine |
Speed | 12 knots |
Complement | 204 |
Armament | Unknown |
John L. Clem was built as the cargo and passenger liner Santa Ana for W. R. Grace and Company for service in Grace Line's South American service but was requisitioned before completion by the United States Shipping Board (USSB) in 1918 due to World War I. The ship was chartered back to Grace after completion until turned over to the United States Navy to be briefly commissioned as the troop transport USS Santa Ana (ID-2869) from 11 February 1919 to 21 July 1919.
Between the wars she served from 1919 as a commercial liner Santa Ana 1919–1928 on service between New York and Valparaiso, Chile. As Guatemala (1928-1932) the ship served on Grace's subsidiary intercoastal service between San Francisco and New York. That service remained through the name change to Santa Cecilia (1932-1936) until laid up in 1934. The ship was sold to Merchants & Miners Transportation Company in 1936, underwent a rebuild and served in that line's coastwise service between Boston and Philadelphia as Irwin (1936-1941).
In March 1941 Irwin was acquired by the U.S. Army and assigned the name John L. Clem in honor of Major General John Lincoln Clem. The ship served as a United States Army Transport (USAT) from 1941 until conversion into a hospital ship between September 1943 and June 1944 serving as USAHS John L. Clem.
The ship had been assigned a prospective US Navy ID, AP-36, but never served with the Navy after 1919.
Santa Ana, keel laid 1 February 1917, was built in 1917 at Philadelphia by William Cramp & Sons, as a passenger and cargo liner intended for the Grace Line launched 13 October 1917 and completed with delivery 1 January 1918 for the United States Shipping Board (USSB) after requisition during World War I. [1] [2] [3]
The ship was designed to carry 100 first class passengers and 5,400 tons of cargo and was exclusively oil burning. [4] Four boilers provided steam for a quadruple expansion engine. [3]
Passenger accommodations, as they existed after conversion back to commercial service in 1919 and return to South American service, were two deluxe cabins with full bath aft of the bridge and another two below on the promenade deck. Thirty-eight cabins with two beds and one pull-down berth could accommodate three people each. All were outside cabins with windows. The social hall was directly below the bridge and extended the width of the ship. A dining room large enough to serve all passengers at one seating was forward in the main deck house with views on three sides. Aft was a bar and open air cafe. [3]
Deck officers had single cabins on the bridge deck with engineering officers having quarters starboard in the main deck house near access to the engine room. Chinese stewards were housed in a poop deck cabin and crew, mostly West Indians, berthed in the forecastle. [3]
This configuration may have lasted through the remodel in 1928 for the intercoastal San Francisco—New York service but not probably the conversion of 1936 into the coastwise Boston—Philadelphia service as Irwin.
The ship, as registered when returned to commercial service with Grace Line, was 4,869 GRT, 2,892 NRT, 360.2 ft (109.8 m) registered length, 51.6 ft (15.7 m) breadth, 33.8 ft (10.3 m) depth with official number 215880 and signal letters LJMQ. [5] Navy characteristics were a length overall of 373 ft 9 in (113.9 m) and a draft of 22 ft 9 in (6.9 m). [6]
Gross register tonnage is a calculation of a ship's internal volume, not weight, with the "tonnage" being number of units of 100 cubic feet (2.83 m3). Thus the figure can change considerably with modifications. The ship built as Santa Ana underwent a number of such changes with several definitely reflecting change in GRT as seen in the ship's registration.
The ship, then named Irwin owned by Merchant & Miners Transportation Company of Baltimore, was rebuilt in 1936 by Maryland Drydock Company, Baltimore, Maryland. [7] The change was then to 4,900 GRT, 2,900 NRT, signal letters WADT and home port of Baltimore. [8]
There were further modifications made by the Army during conversion to a troop ship and then hospital ship so that varying figures for tonnage and displacement may be found. After an initial voyage as a troop ship modifications were made at Robins Drydock & Repair Co., New York, in a conversion between April and June 1941. In 1943, on selection as a hospital ship, conversion to that function was made at Mobile, Alabama. Another conversion was done after a decision in September 1945 to return the vessel to troop ship configuration. [7] The shifts in the ship's ownership and function, and perhaps measurement methods, account for the varied figures for basic characteristics that may be found in sources. For example, the original application for registry, before the Navy's use of the ship, dated 20 December 1917 has 4,942 GRT. [3] In the ship's final days, after rebuild and conversions, for Army the number is shown as 5,211 GRT. [7] [9]
The USSB chartered Santa Ana to the Grace Company for commercial operation and after fitting out the ship made a maiden voyage on 2 February 1918 with runs between New York and Valparaiso until turned over to the Navy in 1919. [3] [4]
The Navy placed the ship in commission 11 February 1919 at Hoboken, New Jersey, Lt. Comdr. Charles H. Lawrence, USNRF, in command. As a unit of the Cruiser and Transport Force, she made four round-trip voyages between 27 February 1919 and 7 July 1919 to bring World War I veterans from France. [6] On 21 July 1919 the ship was decommissioned and returned to the USSB which returned operation to Grace Line's South American service. [3] [6] [10] [note 1]
Santa Ana served Grace Line's route to Peru and Chile in the line's weekly service out of New York in which one of the line's ships departed every other Saturday. [3] The other ships built to serve the west coast of South America were the Cramp-built Santa Luisa and Santa Teresa with New York Shipbuilding's ships Santa Elisa and Santa Leonora. All five were returned by the USSB but Grace had determined only four were needed and refused Santa Leonora. [11] The brochure "Sailings March–December 1927" indicates the typical routing on this route for the four ships:
New York, Cristobal, Balboa, Talara, Salaverry, Callao, Mollendo, Arica, Iquique, Tocopilla, Antofagasta, Chanaral, Valparaiso south bound with Chanaral and Tocopilla not visited on the return north. [12]
Grace was introducing two new 16 kn (18 mph; 30 km/h) motor vessels, Santa Barbara (8,156 GRT) and Santa Maria (8,153 GRT), both 466 ft (142.0 m) registered length, completed in 1928 by Furness Shipbuilding Company in Haverton-on-Tees, England, and carrying 150 passengers to the route. [11] [13] [note 2] As a result, with only four ships needed for the New York—Valparaiso route, Santa Ana was transferred to the Grace subsidiary, Panama Mail Steamship Company, that operated between New York and San Francisco in intercoastal service and renamed Guatemala 16 June 1928 and remodeled for the intercoastal trade. [3]
Guatemala, now with home port of San Francisco, entered the popular intercoastal trade, along with ships of the Pacific Mail Steamship Company Grace had acquired. The line promoted a voyage on tropical seas lasting nearly a month with excursions in "Spanish Americas" at the Panama Canal and the countries of Colombia, Nicaragua, El Salvador, Guatemala and Mexico en route. [3] [14] [15]
The "Sailings July 1930-March 1931" brochure titled "Panama Mail Cruises to Havana and New York via Spanish America from San Francisco and Los Angeles" shows the typical routing for Guatemala and four other ships on the route: [14]
Eastbound from San Francisco, Los Angeles, Mazatlan, Champerico, San José de Guatemala, Acajutla, La Libertad, La Union, Corinto, Puntarenas, Balboa, Cristobal, Cartagena, Puerto Colombia, Havana and New York. Westbound from New York to Los Angeles and San Francisco, but not calling at Havana and on alternate voyages calling at Acajutla and La Union. [14]
The Pacific Mail name was being phased out in favor of the Grace identity and so were ship names with the "Santa" prefix favored. On 22 December 1931 the ship was renamed ''Santa Cecilia. [3] [11]
The intracoastal routing remained under the new name. [12] In May 1934 the smaller Grace ships, including Santa Cecilia, were laid up. [3]
On 20 May 1936 the idle and laid up Santa Cecilia was sold to Merchants & Miners Transportation Company of Baltimore, Maryland, operating ships in coastwise trade along the Atlantic Coast. Santa Cecilia was converted for this trade by Maryland Drydock Company, Baltimore and was renamed Irwin. The ship, with home port of Baltimore and new signal WADT, was then placed on a Boston—Philadelphia route and remained on it until being acquired for wartime service in 1941. [3] [16] [17]
The Navy had assigned a prospective hull number of AP-36 to the ship but it was never used and the ship was never a naval vessel in World War II. [18]
In March 1941 the U.S. Army purchased the Irwin which made one voyage between New York and San Juan, Puerto Rico before conversion into a troop ship between April and June by Robins Drydock & Repair Company at New York. The ship was renamed John L. Clem. From June 1941 until June 1942 the ship operated between the New York, Charleston, Panama, New Orleans, and Trinidad. The ship was assigned to "interisland service" operating between New Orleans and Port of Spain, Santa Lucia, Guantanamo, San Juan, Cristobal, and Key West until September 1943. [7]
After designation as a hospital ship to operate under the Hague Convention of 1907 on 24 February 1944 the ship was converted between September 1943 and June 1944 at Alabama Drydock & Shipbuilding Co., Mobile, Alabama. [3] [7] in June 1944, USAHS John L. Clem loaded supplies at the Charleston Port of Embarkation, the home port for hospital ships in European and Mediterranean theaters. On 15 June the ship sailed to the Mediterranean and with a stop at Gibraltar reached Oran on 3 July. [3] [7] [19] Clem was then operated within the theater moving wounded between hospitals ashore. [7]
The ship was one of Army hospital ships arriving off the beaches during the invasion of southern France, Operation Dragoon, beginning the day after the landings on 15 August 1944. Others were Acadia, Algonquin, Chateau Thierry, Emily Weder, Shamrock, snd Thistle. Being the smallest Army hospital ship in patient capacity, 286, Clem had only one surgical team aboard while Acadia had three teams and the others two each. [19] [20]
Before departing the Mediterranean in March of 1945 the ship had transported patients of all nationalities between 59 ports including Algiers, Oran, Naples, Palermo, Livorno (Leghorn), Toulon, and Marseilles covering some 35,000 miles. The ship arrived in Charleston 11 March 1945. [3] After repairs the ship returned to the Mediterranean moving patients between Italy and North Africa, then between the Continent and England. Only John L. Clem and USAHS Ernest Hinds, the Army's two smallest hospital ships, operated in Europe after VE Day. USAHS John L. Clem departed for Charleston in June 1945 and later sailed for New York. [3] John L. Clem began preparations and modifications, particularly improvements in ventilation, for service in the Pacific. However, Japan surrendered and the plans were cancelled. [7]
After the Japanese surrender John L. Clem was decommissioned as a hospital ship and converted to a troop transport. The War Shipping Administration (WSA) requested the ship be used to transport Jamaican workers between Kingston, Jamaica and Port Everglades, Florida. After a final trip to Nassau, Bahamas the ship was turned over to WSA at Hampton Roads as surplus to Army requirements in January 1946.
The ship was surveyed by the U.S. Public Health Service for possible use, though it is unclear that the ship was ever activated for that agency. [3] [7] On 5 December 1946 she was laid up in the Maritime Commission's National Defense Reserve Fleet at Brunswick, Georgia, under her previous name of Irwin. The ship was sold to Patapsco Scrap Corporation, Baltimore, Maryland for scrapping 30 December 1947 and withdrawn from the reserve fleet for that purpose 21 January 1948. [21]
The first USS Amphion was a former German passenger liner SS Köln for Norddeutscher Lloyd from 1899–1917. Köln had been interned in Boston on the outbreak of war in Europe and confiscated in April 1917 when the United States entered the war. The ship was under the control of the United States Shipping Board (USSB) that allocated commercial type ships to military or civilian use during the war. Köln was renamed Amphion and operated by USSB for the Army as United States Army Chartered Transport (U.S.A.C.T.) Amphion as an animal transport taking mules, horses and general cargo to forces in Europe. At the end of the war the USSB allocated the ship to the Navy, which used the ship from April to September 1919 as a troop transport for returning the United States Expeditionary Force from Europe.
USS Comfort (AH-3) was a hospital ship for the United States Navy in World War I. She was the sister ship of USS Mercy (AH-4) but the two ships were not of a ship class. Comfort was known as SS Havana in passenger service for the Ward Line, and as USAT Havana in United States Army service before her Navy service. Her name was restored to Havana in 1927, and she was renamed SS Yucatán in 1935, and SS Agwileon in 1941. In World War II, she was known as USAT Agwileon and USAHS Shamrock in service for the United States Army.
USS Siboney (ID-2999) was a ship transport for the United States Navy during World War I. She was the sister ship of USS Orizaba (ID-1536) but neither was part of a ship class. Launched as SS Oriente, she was soon renamed after Siboney, Cuba, a landing site of United States forces during the Spanish–American War. After her navy service ended, she was SS Siboney for the New York & Cuba Mail Steamship Co.. The ship was operated under charter by American Export Lines beginning in late 1940. During World War II she served the U.S. Army as transport USAT Siboney and as hospital ship USAHS Charles A. Stafford.
USS Leedstown (AP-73), built as the Grace Line passenger and cargo ocean liner SS Santa Lucia, served as a United States Navy amphibious assault ship in World War II. The ship had first been turned over to the War Shipping Administration (WSA) and operated by Grace Line as the WSA agent from February to August 1942 in the Pacific. In August the ship, at New York, was turned over to the Navy under sub-bareboat charter from WSA. She was sunk 9 November 1942 off the Algerian coast by a German submarine after German bombers caused damage the day before.
St. Mihiel was a troopship built for the United States Shipping Board by the American International Shipbuilding Corporation at Hog Island, Pennsylvania. The ship was operated from 1922 until mid-1940 as USAT St. Mihiel by the Army Transport Service. In July 1941 the ship was transferred to the Navy which commissioned her USS St. Mihiel with the hull number AP-32. In November 1943, she was transferred back to the Army and converted into the hospital ship, USAHS St. Mihiel.
USAT Thomas H. Barry, formerly SS Oriente, was a Ward Line ocean liner that became a United States Army troopship in the Second World War. She was intended for transfer to the United States Navy and assigned the hull number AP-45, but was not transferred and remained with the Army.
Empire Bittern was a steamship, built as a livestock-carrying cargo ship in 1902 at Belfast, Ireland as Iowa for the White Diamond Steamship Company Ltd of Liverpool. The ship was sold to the Hamburg Amerika Linie and renamed Bohemia in 1913.
USS Majaba (AG-43/IX-102) was the Design 1049 cargo ship Meriden built in 1919 by the Albina Engine & Machine Works, Portland, Oregon. All the ships were requisitioned by the United States Shipping Board (USSB) for World War I service. The ship was bought by the E. K. Wood Lumber Co., of San Francisco, California in 1923 and renamed El Capitan. The ship was chartered by the U.S. Navy through the War Shipping Administration (WSA) in April 1942 and commissioned as Majaba.
USS Tuluran (AG-46) was under construction for the British at the Toledo Shipbuilding Company as the cargo ship War Bayonet in 1917 when requisitioned by the United States Shipping Board (USSB) for World War I service. The ship was launched and completed as Lake Superior. The Navy acquired the ship from the USSB with assignment to the Naval Overseas Transport Service (NOTS) with the identification number ID-2995. The ship was returned to the USSB which sold the vessel in 1926. The ship was renamed C. D. Johnston III and that vessel operated out of Oregon until again sold and based in San Francisco. Another sale resulted in the vessel being renamed Anna Shafer which was acquired by the War Shipping Administration (WSA) in 1942 and allocated to the Navy for World War II service.
W. L. Steed was a steam tanker built in 1917–1918 by Bethlehem Shipbuilding Corporation of Quincy for Pan American Petroleum and Transport Company, with intention of transporting oil and petroleum products between Mexican and Gulf ports and the Northeast of the United States. The ship was briefly requisitioned by the US Government during World War I but returned to commercial service in early 1919. The ship was named after William L. Steed, superintendent of the Mexican Petroleum Company of California.
USS West Lianga (ID-2758) was a cargo ship for the United States Navy during World War I. She was later known as SS Helen Whittier and SS Kalani in civilian service under American registry, as SS Empire Cheetah under British registry, and as SS Hobbema under Dutch registry.
The Skinner & Eddy Corporation, commonly known as Skinner & Eddy, was a Seattle, Washington-based shipbuilding corporation that existed from 1916 to 1923. The yard is notable for completing more ships for the United States war effort during World War I than any other American shipyard, and also for breaking world production speed records for individual ship construction.
SS Santa Rosa was a passenger and cargo ocean liner built for the Grace Line for operation by its subsidiary Panama Mail Steamship Company of San Francisco. She was the first to be launched and operating of four sister ships, the others in order of launch being Santa Paula, Santa Lucia and Santa Elena. All four ships, dubbed "The Four Sisters" and "The Big Four" were noted as the finest serving the West Coast and were of advanced technology. All served in World War II as War Shipping Administration (WSA) troop ships. Both Santa Lucia and Santa Elena were lost in air and torpedo attacks off North Africa.
SS Santa Paula was a passenger and cargo ocean liner built for the Grace Line. She was the second of four sister ships ordered in 1930 from the Federal Shipbuilding and Drydock Company of Kearny, NJ. Her regular service route included inter-coastal service between the east coast and the west coast of the US via the Caribbean and the Panama Canal. She later sailed on cruises from New York to the Caribbean and South America. She was the second of three vessels to bear the name Santa Paula for Grace Line service.
USS Lake Tulare (ID-2652) was a cargo ship of the United States Navy that served during World War I and its immediate aftermath.
Corvus was a steam cargo ship built in 1919 by Columbia River Shipbuilding Company of Portland for the United States Shipping Board as part of the wartime shipbuilding program of the Emergency Fleet Corporation (EFC) to restore the nation's Merchant Marine. The freighter was operated on international and domestic routes through 1944. Early in 1945 she was transferred to Soviet Union as part of lend-lease program and renamed Uzbekistan. After several months of operation, the freighter was rammed by another vessel on 31 May 1945 and was beached to avoid sinking. She was subsequently raised and towed to Portland where she was scrapped in 1946.
SS Jacona was an Emergency Fleet Corporation Design 1014 cargo ship launched in 1919 for the United States Shipping Board (USSB). In the glut of shipping after World War I, the ship was laid up until selected to be converted into the first specifically designed powership.
USS Santa Olivia (SP-3125) was a cargo ship and later troop transport that served with the United States Navy during and after World War I. The ship later went into merchant service as a freighter, and during World War II took part in a number of transatlantic convoys.
USS Radnor (ID-3023) was a cargo ship and later troop transport that served with the United States Navy in 1918–19, during and shortly after World War I. The ship later went into merchant service, and in 1948 under Chinese ownership reportedly became the first all-Chinese ship to visit South America. Radnor was originally ordered as SS War Indian by a private company, but with U.S. entry into World War I in April 1917, she was requisitioned by the U.S. Navy for use as a cargo ship. Commissioned as USS Radnor (ID-3023) in May 1918, the ship spent the remainder of the war transporting cargoes for the Navy. After the war, USS Radnor was converted into a troop transport and used to repatriate U.S. troops home from France.
The SS Harry Luckenbach, built as a cargo ship ordered by the Luckenbach Steamship Company and built at Sun Shipbuilding and Drydock Co. in Chester, Pennsylvania in 1919. The as yet unnamed ship was requisitioned by the United States Shipping Board (USSB) before completion and converted to a troop transport. The USSB allocated the ship, which had been fitted out with temporary troop accommodation in its cargo spaces, to the Navy which commissioned the ship on 7 July 1919 as USS Sol Navis with the Identification number 4031A. The ship was decommissioned October 1919 after two trips to France.