Shown:USS Pee Dee River (LSM(R)-517) | |
History | |
---|---|
United States | |
Name | USS LSM(R)-507 |
Namesake | Greenbrier River |
Builder | Brown Shipbuilding Company |
Laid down | 31 March 1945 |
Launched | 28 April 1945 |
Commissioned | 22 June 1945 |
Decommissioned | 5 February 1947 |
Renamed | Greenbrier River, 1 October 1955 |
Stricken | 1 October 1958 |
General characteristics | |
Class and type | LSM(R)-501-class landing ship medium |
Displacement | 1,175 long tons (1,194 t) full |
Length | 203 ft 6 in (62.03 m) |
Beam | 34 ft (10 m) |
Draft | 7 ft 9 in (2.36 m) |
Propulsion | General Motors Cleveland diesel, 2,800 hp (2,088 kW), 2 screws; direct drive |
Speed | 13 knots (24 km/h; 15 mph) |
Range | 5,000 nmi (9,300 km) at 7 kn (13 km/h; 8.1 mph) |
Complement | 6 officers, 137 enlisted |
Armament |
|
USS LSM(R)-507 was laid down on 31 March 1945 by the Brown Shipbuilding Company in Houston, Texas and launched on 28 April 1945. She was commissioned by the United States Navy on 22 June 1945.
Departing Houston on 27 June, LSM(R)-507 steamed via Galveston, Texas to Charleston, South Carolina, where she arrived on 7 July. From 28 to 30 July she sailed to Little Creek, Virginia, for training in Chesapeake Bay and along the Virginia coast. Assigned to LSMR Squadron 4, she departed Little Creek on 4 October for the Great Lakes. She touched at Halifax, Quebec and Montreal and arrived at Rochester, New York, on 16 October. During the next three weeks she sailed to Detroit and Chicago before returning to Rochester on 1 November and Little Creek on 17 November.
During the next two months LSM(R)-507 continued operations out of Little Creek. She departed on 29 January 1946, for operations off San Juan, Puerto Rico and later out of Guantanamo Bay in Cuba. She returned to Little Creek on 24 March.
Following duty out of Norfolk, Virginia and Baltimore, Maryland, LSM(R)-507 departed Little Creek for the West Coast of the United States on 18 October, arriving in San Diego, California on 20 November. Assigned to LSMR Squadron 3, she operated out of San Diego; she was decommissioned there on 5 February 1947 and entered the Pacific Reserve Fleet. While berthed at San Diego, she was named Greenbrier River on 1 October 1955, after the Greenbrier River (a tributary of the New River). Her name was struck from the Naval Vessel Register on 1 October 1958.
USS Wright (CVL-49/AVT-7) was a Saipan-class light aircraft carrier of the U.S. Navy, later converted to the command ship CC-2. It is the second ship named "Wright". The first Wright (AV-1) was named for Orville Wright; the second honored both Wright brothers: Orville and Wilbur.
USS Kleinsmith (APD-134), ex-DE-718, was a Crosley-class high speed transport for the United States Navy. She was named for Chief Watertender Charles Kleinsmith (1904–1942), who was posthumously awarded the Navy Cross for his heroism during the Battle of Midway.
USS Fox (DD-234/AG-85) was a Clemson-class destroyer in the United States Navy during World War II. She was the fourth ship named for Gustavus Vasa Fox, Assistant Secretary of the Navy during the Civil War.
USS Luzerne County (LST-902) was an LST-542-class tank landing ship built for the United States Navy during World War II. Named after Luzerne County, Pennsylvania, she was the only U.S. Naval vessel to bear the name.
USS St. Mary's River was originally authorized as LSM-528. Reclassified LSM(R)-528 on 21 April 1945, she was laid down on 19 May 1945 at the Brown Shipbuilding Co., Inc., Houston, Texas, launched on 16 June 1945, and commissioned on 2 September 1945.
USS St. Joseph's River was laid down on 19 May 1945 by the Brown Shipbuilding Co., Inc., in Houston, Texas; she was launched on 16 June 1945 and commissioned on 24 August 1945.
USS Pee Dee River, an LSM(R)-501-class landing ship medium (rocket) of the United States Navy, was originally designed as an LSM but redesignated on 9 February 1945 as LSM(R)–517. She was laid down by Brown Shipbuilding Corporation, in Houston, Texas, on 28 April 1945 and launched 2 June 1945. She was accepted and commissioned on 21 July 1945.
USS Targeteer was an LSM(R)-501-class landing ship medium (rocket) originally projected as LSM-508. The landing craft was reclassified as LSM(R)-508 in February 1945 and laid down on 31 March 1945 at Houston, TX, by the Brown Shipbuilding Corporation. Launched on 28 April 1945, LSM(R)-508 was commissioned at Houston on 25 June 1945.
USS Luzon (ARG-2) was an internal combustion engine repair ship that saw service in the United States Navy during World War II and the Korean War. She was the lead ship in a class of twelve and was named for the Island of Luzon, the chief island in the northern Philippines and site of the capital city of Manila. She is the second US Naval vessel to bear the name.
USS Creon (ARL-11) was one of 39 Achelous-class landing craft repair ships built for the United States Navy during World War II. Named for Creon, she was the only U.S. Naval vessel to bear the name.
USS Swift (AM-122) was an Auk-class minesweeper acquired by the United States Navy for the dangerous task of removing mines from minefields laid in the water to prevent ships from passing.
USS LSM(R)–519 was an LSM(R)-501-class landing ship medium (rocket), a type of amphibious assault ship in the United States Navy.
USS Hurst (DE-250) was an Edsall-class destroyer escort in service with the United States Navy from 1943 to 1946. The ship served in both the Atlantic and the Pacific and was decommissioned in May 1946 and placed in reserve for the next 27 years.
USS Malabar (AF-37) was an Adria-class stores ship in service with the United States Navy ffrom 1945 to 1955. She was scrapped in 1977.
USS LSM-161 was a LSM-1-class landing ship medium built for the United States Navy during World War II. Like many of her class, she was not originally named and was properly referred to by her hull designation for much of her service life.
USS Saint Croix River was a rocket-equipped Landing Ship of the United States Navy during World War II.
USS Beverly W. Reid (APD-119/LPR-119), was a United States Navy high-speed transport in commission from 1945 to 1947 and from 1967 to 1969.
USS St. Francis River was laid down on 19 May 1945 by the Brown Shipbuilding Company in Houston, Texas. She was launched on 16 June 1945, and commissioned on 14 August 1945 as USS LSM(R)-525. She was later renamed after rivers in Missouri, Arkansas, and Maine.
USS White River (LSMR-536) was a Landing Ship Medium (Rocket) (LSMR) in service with the US Navy between 1945 and 1946, 1950 and 1956, and 1965 and 1970. As a member of the LSM(R)-501-class Landing Ship Medium (Rocket), White River was designed to provide rocket fire support to US and allied amphibious operations, although in South Vietnam she was generally used to bombard enemy formations and installations. She saw combat in the Korean and Vietnam Wars, making a large contribution to the latter, in which she fired tens to hundreds of thousands of rockets in support of American, South Vietnamese, and South Korean operations against the Viet Cong during ten tours of duty in Vietnam, 1966 through 1969. In Navy publications such as All Hands and the Navy Times, as well as in the recollections of crew, forward observers and spotters, and ground forces receiving her support, White River was reported to have the firepower of six destroyers or a cruiser. She could fire 250 65-pound (29 kg) rockets in a minute, plus 5-inch shells and autocannon fire, and carry a magazine of 1,500-2,000 rockets.
USS LSM(R)-501 was the lead ship of the LSM(R)-501-class landing ship medium built in 1945 for service in World War II. She was later converted into a test range support ship and renamed USS Elk River (IX-501). Her namesake was a Minnesota town named Elk River.