USS Guitarro (SSN-665)

Last updated

USS Guitarro (SSN-665).jpg
USS Guitarro (SSN-665) off San Francisco, California
History
Flag of the United States.svgUnited States
NameUSS Guitarro
NamesakeThe guitarro, a ray of the guitarfish family
Ordered18 December 1964
Builder Mare Island Naval Shipyard, Vallejo, California
Laid down9 December 1965
Launched27 July 1968
Sponsored byMrs. John M. Taylor
Commissioned9 September 1972
Decommissioned29 May 1992
Stricken29 May 1992
Nickname(s)"Mare Island Mud Puppy"
FateScrapping via Ship and Submarine Recycling Program completed 18 October 1994
General characteristics
Class and type Sturgeon-class submarine
Displacement
  • 3,860 long tons (3,922 t) light
  • 4,268 long tons (4,336 t) full
  • 408 long tons (415 t) dead
Length292 ft 3 in (89.08 m)
Beam31 ft 8 in (9.65 m)
Draft28 ft 8 in (8.74 m)
Installed power15,000 shaft horsepower (11.2 megawatts)
PropulsionOne S5W nuclear reactor, two steam turbines, one screw
Speed
  • 15 knots (28 km/h; 17 mph) surfaced
  • 25 knots (46 km/h; 29 mph) submerged
Test depth1,300 feet (400 meters)
Complement108
Armament4 × 21-inch (533 mm) torpedo tubes

USS Guitarro (SSN-665), a Sturgeon-class submarine, was the second ship of the United States Navy to be named for the guitarro, a ray of the guitarfish family.

Contents

Construction and commissioning

Keel-laying and launching

The contract to build Guitarro was awarded to Mare Island Naval Shipyard at Vallejo, California, on 18 December 1964 and her keel was laid down there on 9 December 1965. She was launched on 27 July 1968, sponsored by Mrs. John M. Taylor, wife of Vice Admiral John Taylor.

On 15 March 1969 during a meeting with the shipyard managers, Cmdr. William G. Lange urged them to create centralized control and designate responsibility for all construction. The shipyard representatives dismissed his idea, saying "the shipyard had been building ships for a long time without the need for such a procedure and no one had been killed or equipments damaged yet."

Sinking

Guitarro on the bottom of the Napa River after her accidental sinking at Mare Island Naval Shipyard at Vallejo, California, on 15 May 1969. USS Guitarro (SSN-665) after sinking.jpg
Guitarro on the bottom of the Napa River after her accidental sinking at Mare Island Naval Shipyard at Vallejo, California, on 15 May 1969.

On 15 May 1969, Guitarro was moored in the Napa River at Mare Island Naval Shipyard while construction was still underway. At about 16:00, a civilian nuclear construction group began to calibrate the aft ballast tanks, which required them to fill the tanks with approximately 5 short tons (4.5 t) of water. Within 30 minutes, a different, non-nuclear civilian construction group began an assignment to bring Guitarro within a half-degree of trim; this entailed adding water to the forward ballast tanks to overcome a reported two-degree up-bow attitude. Until shortly before 20:00, both groups continued to add water, unaware of each other's activities. [1]

Twice between 16:30 and 20:00, a security watch advised the non-nuclear group that Guitarro was riding so low forward that the 1.5-foot-high (0.46 m) wakes of boats operating in the Napa River were sloshing into the sonar dome manhole, but the group ignored the warnings. At 19:45, the non-nuclear group stopped adding water to the ballast tanks and began to halt work for their meal break, leaving at 20:00. At 19:50, the nuclear group completed their calibrations and began to empty the tanks aft. [1]

At 20:30, both the nuclear group, still aboard, and the non-nuclear group, returning from their break, noticed Guitarro taking a sudden down angle which put the forward hatches underwater. Massive flooding took place through several large open hatches. Efforts between 20:30 and 20:45 to close watertight doors and hatches were largely unsuccessful because lines and cables ran through the doors and hatches, preventing them from closing. At 20:55, Guitarro sank, leaving only her sail above water, earning her the nickname "Mare Island Mud Puppy". [1]

Causes

In an attempt to correct what they thought was an out of trim condition, the non-nuclear construction team in the forward part of the boat purposefully defeated safety measures preventing accidentally filling ballast tanks while the sub was under construction. During construction, steel plates are welded over the ballast tanks flood ports to prevent water from getting into the tanks and putting the submarine in an unsafe condition. The construction crew put a fire hose down the tank's vent pipe and forced it past the check valve. [2]

The Congressional report concluded that the sinking was caused in large part by "the action, or inaction, of certain construction workers who either failed to recognize an actual or potential threat to the ship's safety or assumed that it was not their responsibility." The report stated that the "lack of centralized control and responsibility for all construction" was the overriding cause. [2]

One of the factors contributing to the ship's sinking was the open manhole used to access the bow structure sonar dome containing the boat's sonar sphere. The manhole has a bolted cover which had been removed for maintenance purposes. The opening was protected by a cofferdam approximately 3 feet (0.91 m) high. The cofferdam was intended to prevent water from accidentally entering the dome and contacting the exposed electronic gear. [1]

To facilitate repair work, the cofferdam and the bolted manhole cover were removed in early March 1969 and neither the cofferdam nor the cover was ever replaced. When the construction crews added and then removed water from the ballast tanks, affecting the boat's trim, the manhole was exposed to waves caused by the wake of other vessels, causing the boat to sink at the bow, eventually filling the entire submarine. [1]

Refloating

Guitarro was refloated three days later, on 18 May 1969. Damages to her were estimated at $15.2 to $21.85 million (equivalent to $97 to $139 million in 2023). [3]

Lessons learned

Among other recommendations affecting communication, management, and supervision of ship construction, the report authors recommended that cables and lines running through watertight hatches and doors be equipped with quick disconnect fittings. [2]

Commissioning

Guitarro had been scheduled to be commissioned in January 1970, but repairs necessitated by her sinking dictated a 32-month delay. She finally was commissioned on 9 September 1972.

Service history

USS Guitarro (SSN-665) hosting the first tour of a US nuclear submarine by high-ranking Russian officials 1990 Oct Russian Tour of USS Guitarro (SSN-665).jpg
USS Guitarro (SSN-665) hosting the first tour of a US nuclear submarine by high-ranking Russian officials

In the mid-to-late 1970s, Guitarro was stationed at Point Loma in San Diego, California, commanded by Alvin H. Pauole, followed by Scott Van Hoften.

Guitarro played a major role in developing tactics for prototype combat systems deployed to the Pacific submarine fleet, in particular the new Submarine Towed Array Sensor System (STASS) along with its BQR-20 series digital sonar displays. In the mid-1970s, Guitarro also installed the first digital submarine combat system (BQQ-5 sonar and Mk-117 fire control system) and participated in the development of submarine-launched Harpoon and Tomahawk cruise missiles. [4]

She was active at the time in the pre-operational testing of the new Tomahawk cruise missile, launching several of the missiles on a test range off the coast of Southern California.

Decommissioning and disposal

Guitarro was decommissioned on 29 May 1992 and stricken from the Naval Vessel Register the same day. Her scrapping via the Nuclear-Powered Ship and Submarine Recycling Program at Puget Sound Naval Shipyard in Bremerton, Washington, was completed on 18 October 1994.

Related Research Articles

<i>Sturgeon</i>-class submarine Class of fast attack nuclear submarine by US Navy

The Sturgeon class was a class of nuclear-powered fast attack submarines (SSN) in service with the United States Navy from the 1960s until 2004. They were the "workhorses" of the Navy's attack submarine fleet throughout much of the Cold War. The boats were phased out in the 1990s and early 21st century, as their successors, the Los Angeles, followed by the Seawolf and Virginia-class boats, entered service.

The Ship-Submarine Recycling Program (SRP) is the process that the United States Navy uses to dispose of decommissioned nuclear vessels. SRP takes place only at the Puget Sound Naval Shipyard (PSNS) in Bremerton, Washington, but the preparations can begin elsewhere.

<i>Gato</i>-class submarine US Navy fleet submarine class

The Gato class of submarines were built for the United States Navy and launched in 1941–1943. Named after the lead ship of the class, USS Gato, they were the first mass-production U.S. submarine class of World War II.

USS <i>Thresher</i> (SSN-593) United States Navy submarine (1961–63)

USS Thresher (SSN-593) was the lead boat of her class of nuclear-powered attack submarines in the United States Navy. She was the U.S. Navy's second submarine to be named after the thresher shark.

USS <i>Seawolf</i> (SSN-575) US Navy nuclear attack submarine

USS Seawolf (SSN-575) was the third ship of the United States Navy to be named for the seawolf, the second nuclear submarine, and the only US submarine built with a liquid metal cooled (sodium), beryllium-moderated nuclear reactor, the S2G. Her overall design was a variant of Nautilus, but with numerous detail changes, such as a conning tower, stepped sail, and the BQR-4 passive sonar mounted in the top portion of the bow instead of further below. This sonar arrangement resulted in an unusual bow shape above the water for a U.S. submarine. Originally laid down in 1953, her distinctive reactor was later replaced with a standard pressurized water reactor, the replacement process lasting from 12 December 1958 to 30 September 1960.

USS <i>Nautilus</i> (SSN-571) First nuclear-powered submarine of the US Navy, in service from 1954 to 1980

USS Nautilus (SSN-571) was the world's first operational nuclear-powered submarine and on 3 August 1958 became the first submarine to complete a submerged transit of the North Pole. Her initial commanding officer was Eugene "Dennis" Wilkinson, a widely respected naval officer who set the stage for many of the protocols of today's Nuclear Navy of the US, and who had a storied career during military service and afterwards.

USS <i>Pogy</i> (SSN-647) Submarine of the United States

USS Pogy (SSN-647), a Sturgeon-class submarine, was the second ship of the United States Navy to be named for the pogy, or menhaden.

USS <i>Halibut</i> (SSGN-587) US Navy submarine

USS Halibut (SSGN-587), a unique nuclear-powered guided missile submarine-turned-special operations platform, later redesignated as an attack submarine SSN-587, was the second ship of the United States Navy to be named after the halibut.

USS <i>Greenling</i> (SSN-614) Submarine of the United States

USS Greenling (SSN-614) was a Permit-class submarine. She was the second ship of the United States Navy to be named for the greenling, an elongated, fine-scaled fish found from Kamchatka to California. Her keel was laid down on 15 August 1961 by General Dynamics Electric Boat of Groton, Connecticut.

USS <i>Scorpion</i> (SSN-589) Skipjack-class nuclear-powered submarine

USS Scorpion (SSN-589) was a Skipjack-class nuclear-powered submarine that served in the United States Navy, and the sixth vessel, and second submarine, of the U.S. Navy to carry that name.

<i>Skipjack</i>-class submarine Early cold-war US nuclear attack submarine

The Skipjack class was a class of United States Navy nuclear submarines (SSNs) that entered service from 1959 to 1961. This class was named after its lead boat, USS Skipjack. The new class introduced the teardrop hull and the S5W reactor to U.S. nuclear submarines. The Skipjacks were the fastest U.S. nuclear submarines until the Los Angeles-class submarines, the first of which entered service in 1974.

USS <i>Parche</i> (SSN-683) Submarine of the United States

USS Parche (SSN-683), a Sturgeon-class submarine, was the second ship of the United States Navy to be named for the parche, a small, coral reef butterfly fish. Parche was launched on 13 January 1973, sponsored by Natalie Beshany, the wife of Vice Admiral Philip A. Beshany, and commissioned on 17 August 1974.

<span class="mw-page-title-main">Nuclear submarine</span> Submarine powered by a nuclear reactor

A nuclear submarine is a submarine powered by a nuclear reactor, but not necessarily nuclear-armed. Nuclear submarines have considerable performance advantages over "conventional" submarines. Nuclear propulsion, being completely independent of air, frees the submarine from the need to surface frequently, as is necessary for conventional submarines. The large amount of power generated by a nuclear reactor allows nuclear submarines to operate at high speed for long periods, and the long interval between refuelings grants a virtually unlimited range, making the only limits on voyage times being factors such as the need to restock food or other consumables.

USS <i>San Francisco</i> (SSN-711) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS San Francisco (SSN-711) is a Los Angeles-class nuclear submarine, the third ship or boat of the United States Navy to be named for San Francisco, California.

USS <i>Gurnard</i> (SSN-662) Submarine of the United States

USS Gurnard (SSN-662), a Sturgeon-class submarine, was the second ship of the United States Navy to be named for the gurnard, a food fish of the genus Trigla and part of the sea robin family.

USS <i>Ray</i> (SSN-653) Submarine of the United States

USS Ray (SSN-653), a Sturgeon-class attack submarine, was the second ship of the United States Navy to be named for the rays.

USS <i>Billfish</i> (SSN-676) American naval submarine

USS Billfish (SSN-676), a Sturgeon-class attack submarine, was the second ship of the United States Navy to be named for the billfish, a name used for any fish, such as gar or spearfish, with bill-shaped jaws.

USS <i>Atlanta</i> (SSN-712) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Atlanta (SSN-712), a Los Angeles-class submarine, was the fifth ship of the United States Navy to be named for Atlanta, Georgia. The contract to build her was awarded to Newport News Shipbuilding and Dry Dock Company in Newport News, Virginia, on 1 August 1975 and her keel was laid down on 17 August 1978. She was launched on 16 August 1980 sponsored by Mrs. Sam Nunn, and commissioned on 6 March 1982, with Commander Robin J. White in command.

References

Notes

  1. 1 2 3 4 5 Guitarro II (SSN-665) 1972–1994
  2. 1 2 3 Sinking of USS Guitarro (SSN-665)
  3. Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth . Retrieved 30 November 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
  4. "Why the U.S. Navy Needs to Get Back to Prototyping".

Bibliography