Sydney Gateway

Last updated

Sydney Gateway

Sydney Gateway Twin Arch Bridges December 2023 1.jpg
Twin Arch Bridge over the Alexandra Canal in December 2023. At the time of the photo, the westbound bridge at the back is still under construction.
Sydney Gateway
Australia New South Wales relief location map.png
Red pog.svg
Sydney Gateway
Coordinates
General information
TypeRoad junction  (Under construction)
Location St George District
OpenedNovember 2023–December 2024 (planned)
Maintained by Transport for NSW
Major junctions
North end
South end

The Sydney Gateway is a partially-open major road interchange between the WestConnex and the airport terminals of Sydney Airport, and includes a new pair of arch bridges over the Alexandra Canal and an eastbound flyover connecting Qantas Drive to the domestic terminal buildings. Upon completion, the Sydney Gateway will connect the Sydney Motorway network with the Sydney Airport and Port Botany precincts via the St Peters Interchange. [1] [2] The completed project is expected to provide significantly improved road links between the Airport, City and Port Botany, whilst reducing congestion. [3]

Contents

Construction began in early 2021 and sections of the interchange were progressively opened since November 2023. [4] [5] [6] [7] The interchange is expected to fully open in December 2024. [8] It was originally planned to fully open in late 2023 in conjunction with the connecting M4–M8 Link, the latter of which ultimately opened earlier in January 2023. [9]

The Sydney Gateway was constructed in conjunction with the duplication of the nearby Port Botany freight rail line, which is being managed by the Australian Rail Track Corporation. [10]

Design

The Sydney Gateway starts at the St Peters Interchange, the junction of the M8 Motorway and M4–M8 Link, all of which were built as part of WestConnex. Viaducts will be built over Canal Road, the Port Botany freight rail line and Tempe Lands. Further southwest, the Sydney Gateway splits into two, leading to Airport Drive and Qantas Drive towards the west and east respectively. [11]

A section of Airport Drive will be closed permanently and traffic will be redirected to use Sydney Gateway to access between the international and domestic terminals via Sydney Gateway. [3] A pair of arch bridges has been constructed over the Alexandra Canal for the realigned traffic, and has been referred to as Twin Arch Bridge by the state government. [5]

A single traffic light is also located along the Sydney Gateway for access to and from Link Road, just east of the Twin Arch Bridge. [12] This is the only controlled intersection along the Sydney Gateway, with the rest of the Sydney Gateway being free-flowing traffic.

A 800-metre (2,600 ft) long one-way elevated flyover in the eastbound/southbound direction has also been built linking Qantas Drive towards the Sir Reginald Ansett Drive and the domestic terminals precinct. The flyover bypasses two signalised intersections with Seventh Street and O'Riordan Street, and enables travel from Sydney's motorway network to the domestic terminals without stopping at a single traffic light. [3] The flyover has been named Deborah Lawrie Flyover after Australia's first female commercial pilot Deborah Lawrie. [4] [13]

As of April 2024, other than the connection to St Peters Interchange, the rest of the Sydney Gateway have already been open.

Tolls

Sydney Gateway is toll-free. [9] However, WestConnex tolls still apply to traffic coming or going via St Peters Interchange, as traffic must use the WestConnex tunnels and cannot exit the St Peters Interchange onto Euston Road or Gardeners Road.

History

Planning

In November 2017, the project was in the design and planning phase that includes developing connections to the St Peters interchange, to Sydney Airport Terminals 1, 2 and 3, grade separation of Robey Street and O’Riordan Street in Mascot, the duplication of a 3-kilometre (1.9 mi) section of the Port Botany Rail Line, within a complex stakeholder environment, with significant utility assets impacted and a heavily congested area. [2] A 2017 proposal by Lendlease was not accepted. [14] The rail line duplication was originally Stage 2 of the Sydney Gateway and is separately managed by the Australian Rail Track Corporation. [10] Stages 1 and 3 then formed the remainder of the project managed by the state government. [15] [16]

The proposed alignment passes over Sydney Airport land, which is leased from the Commonwealth government. As such, the project must undergo both state and Commonwealth (federal) planning processes. In addition to an Environmental Impact Statement (EIS) as required by state planning process, a Major Development Plan (MDP) is also required before major development at a leased airport can occur. Planning approvals from both the federal and state planning ministers are also required. [17] A combined EIS and MDP was released for exhibition on 20 November 2019. [18] The project was approved by the state planning minister on 27 August 2020. [19] The project was approved by the federal planning minister on 23 September 2020. [20] [21]

Construction

Expressions of interest to construct the Sydney Gateway commenced in July 2019. [9] In October 2019, three shortlists were announced: [22]

In November 2020, the John Holland Seymour Whyte joint venture (JHSWJV) was awarded the design and construction contract. [20] Construction began in early 2021 and the motorway is expected to open in December 2024. [8] It was originally planned to open in late 2023, together with the M4–M8 Link.

In August 2021, the project's Construction Environment Management Plan (CEMP) was approved by the state Department of Planning, Industry and Environment, allowing construction work to be started on state land. [23]

Opening

In mid-2023, it was announced that the Sydney Gateway would be open in stages. The first stage would be the eastbound direction including the eastbound arch bridge and the traffic light connection to Link Road. The second stage would be the flyover from Qantas Drive to the domestic terminal buildings (later named Deborah Lawrie Flyover). The third stage would be the westbound direction including a widened Qantas Drive and the westbound arch bridge. The last and fourth stage would be the connection to WestConnex and St Peters Interchange, and new pedestrian and cycling paths. [24]

Ironically, the second stage opened first on 12 November 2023, while the first stage opened a week later on 19 November. [4] [5] On 11 February 2024, the westbound traffic was diverted via Sydney Gateway and temporarily via the eastbound arch bridge. [6] On 21 April 2024, the westbound arch bridge opened and westbound traffic was moved onto the new bridge. [7] The last stage (connection to St Peters Interchange) will open later in the year.

Future

The South East Sydney Transport Strategy, released by Transport for NSW in August 2020, proposed a potential extension of Sydney Gateway to Port Botany by 2056, with grade separation at General Holmes Drive, as well as ramps connecting to Canal Road. [16]

See also

Related Research Articles

<span class="mw-page-title-main">Sydney Airport</span> International airport serving Sydney, New South Wales, Australia

Sydney Kingsford Smith Airport — colloquially Mascot Airport, Kingsford Smith Airport, or Sydney Airport — is an international airport in Sydney, New South Wales, Australia, located 8 km (5 mi) south of the Sydney central business district, in the suburb of Mascot. The airport is owned by Sydney Airport Holdings. It is the primary airport serving Sydney and is a primary hub for Qantas, as well as a secondary hub for Virgin Australia and Jetstar, and a focus city for Air New Zealand. Situated next to Botany Bay, the airport has three runways. Sydney Kingsford Int'l Airport covers 907 hectares of land.

King's Highway 409, commonly referred to as Highway 409 and historically as the Belfield Expressway, is a 400-series highway in the Canadian province of Ontario that extends from Highway 401 in Toronto to Pearson International Airport, west of Highway 427, in Mississauga. It is a short freeway used mainly as a spur route for traffic travelling to the airport or Highway 427 northbound from Highway 401 westbound, as these route movements are not accommodated at the complex interchange between Highways 401 and 427.

<span class="mw-page-title-main">Tampines Expressway</span> Road in Singapore

The Tampines Expressway (TPE) is a highway in the north-eastern fringe of Singapore, joining the Pan Island Expressway (PIE) near Singapore Changi Airport in the east with the Central Expressway (CTE) and Seletar Expressway (SLE) in the north of the island.

<span class="mw-page-title-main">St Peters, New South Wales</span> Suburb of Sydney, New South Wales, Australia

St Peters is a suburb in the Inner West of Sydney, in the state of New South Wales, Australia. It is 7 kilometres south of the Sydney central business district, in the local government area of Inner West Council, with a small section in the southeast in the City of Sydney.

<span class="mw-page-title-main">City West Link</span> Road in Sydney, Australia

City West Link is a 5.0-kilometre (3.1 mi) link road connecting Parramatta Road and the Western Distributor through the Inner West suburbs of Sydney, New South Wales, Australia. It was bypassed by the WestConnex project upon its completion in November 2023. This name covers a few consecutive roads and is widely known to most drivers, but the entire allocation is also known – and signposted – by the names of its constituent parts: Wattle Street, Dobroyd Parade, City West Link proper and The Cresent.

<span class="mw-page-title-main">Pacific Motorway (Sydney–Newcastle)</span> Motorway in New South Wales, Australia

M1 Pacific Motorway is a 127-kilometre motorway linking Sydney to Newcastle via the Central Coast and Hunter regions of New South Wales. Formerly known but still commonly referred to by both the public and the government as the F3 Freeway, Sydney–Newcastle Freeway, and Sydney–Newcastle Expressway, it is part of the AusLink road corridor between Sydney and Brisbane.

The Gateway Motorway is a major tolled motorway in Brisbane, Queensland, Australia which includes the Sir Leo Hielscher Bridges. The motorway is operated by toll road operator Transurban.

Tonkin Highway is an 81-kilometre-long (50 mi) north–south highway and partial freeway in Perth, Western Australia, linking Perth Airport and Kewdale with the city's north-eastern and south-eastern suburbs. As of April 2020, the northern terminus is at the interchange with Brand Highway and Great Northern Highway in Muchea, and the southern terminus is at Thomas Road in Oakford. It forms the entire length of State Route 4, and connects to several major roads. Besides Brand Highway and Great Northern Highway, it also connects to Reid Highway, Great Eastern Highway, Leach Highway, Roe Highway, and Albany Highway.

<span class="mw-page-title-main">U.S. Route 90 Business (New Orleans, Louisiana)</span> Highway in New Orleans, Louisiana

U.S. Highway 90 Business is a business route of U.S. Highway 90 located in and near New Orleans, Louisiana. It runs 14.25 miles (22.93 km) in a general east–west direction from US 90 in Avondale to a junction with Interstate 10 (I-10) and US 90 in the New Orleans Central Business District.

<span class="mw-page-title-main">M2 Hills Motorway</span> Motorway in Sydney, Australia

M2 Hills Motorway is a 19.3-kilometre (12.0 mi) tolled urban motorway in Sydney, New South Wales that is part of the Sydney Orbital Network and the National Highway west of Pennant Hills Road. Owned by toll road operator Transurban, it forms majority of Sydney's M2 route, with the Lane Cove Tunnel constituting the rest of the M2 route.

<span class="mw-page-title-main">M4 Motorway (Sydney)</span> Motorway in Sydney

The M4 Motorway is a 55-kilometre (34 mi) series of partially-tolled dual carriageway motorways in Sydney, New South Wales designated as route M4. The M4 designation is part of the wider A4 and M4 route designation, the M4 runs parallel and/or below ground to Great Western Highway, Parramatta Road and City West Link, which are part of route A44.

<span class="mw-page-title-main">M5 Motorway (Sydney)</span> Motorway in Sydney, Australia

The M5 Motorway is a 28.8-kilometre (17.9 mi) series of tolled motorways located in Sydney, New South Wales designated as route M5. It is part of the Sydney Orbital Network.

<span class="mw-page-title-main">Transport in Sydney</span> Overview of transport in Sydney, Australia

Transport in Sydney is provided by an extensive network of public transport operating modes including metro, train, bus, ferry and light rail, as well as an expansive network of roadways, cycleways and airports. According to the 2006 census, in terms of travel to work or study Sydney has the highest rate of public transport usage among the Australian capital cities of 26.3% with more than 80% of weekday trips to/from Central Sydney being made by public transport. According to the New South Wales State Plan, the state has Australia's largest public transport system. The public transport network is regulated by Transport for NSW.

<span class="mw-page-title-main">Southern Cross Drive</span> Road in Sydney, Australia

Southern Cross Drive is a 4.8 km (3 mi) dual carriage untolled motorway in Sydney, New South Wales, Australia. Part of the M1 and Sydney Orbital Network, the road, a freeway that opened in 1969, links South Dowling Street at Kensington in the north to General Holmes Drive at Sydney Airport in the south.

<span class="mw-page-title-main">General Holmes Drive</span> Road in Sydney, Australia

General Holmes Drive is a 5-kilometre (3.1 mi) major divided road located in Sydney, New South Wales, Australia. The road forms part of the M1, the A1, the Sydney Orbital Network, and the Australian Highway 1 network. Initially built in 1919 as a two-lane road and duplicated in 1951, the road partially circumnavigates Sydney Airport with its north-eastern terminus in Mascot, heading west and then south and then south-west, with its south-western terminus with The Grand Parade in Brighton-Le-Sands.

WestConnex is a 33-kilometre (21 mi) predominantly underground motorway scheme in Sydney, New South Wales, Australia. A joint project of the New South Wales and Federal governments, the motorway scheme created around 26 kilometres (16 mi) of new tunnels between Homebush and Kingsgrove, passing underneath Inner West suburbs including Haberfield and St Peters. The first of the tunnels, the M4 East, opened to traffic in July 2019. The second of the tunnels, the M8 Motorway, opened to traffic a year later in July 2020. The third of the tunnels which extend the M4 and M8 opened to traffic in January 2023. The final component of the scheme, the Rozelle Interchange, opened to traffic in November 2023.

NorthConnex is a 9-kilometre (5.6 mi) twin-tube motorway tunnel in northern Sydney, New South Wales, Australia, signposted as the M11 Tunnel. It acts as a tunnel bypass of the congested Pennant Hills Road, extending or connecting the M1 Pacific Motorway to the M2 Hills Motorway. Owned by NorthWestern Roads (NWR) Group, it is one of the longest road tunnels in Australia, along with the WestConnex Tunnel. It is also the deepest road tunnel in Australia, with more than half of the tunnel 60 metres (200 ft) deep or more, and the deepest point is underneath the Sydney Metro Northwest, about 90 metres (300 ft) below ground.

The M6 Motorway is an under-construction motorway in Sydney, New South Wales consisting of twin, 4-kilometre long tunnels linking the M8 Motorway at Arncliffe to President Avenue at Kogarah. This section started major construction in November 2021 and is expected to open in late 2025. The possibility of future extensions to the south will be accommodated by providing stub tunnels in the project.

<span class="mw-page-title-main">M8 Motorway (Sydney)</span> Motorway in Sydney, Australia

The M8 Motorway is a 15.2-kilometre (9.4 mi) tolled dual carriageway motorway in Sydney that is designated the M8 route marker. It consists predominantly of tunnels and includes tunnel connections to the future Western Harbour Tunnel and the M6 Motorway.

<span class="mw-page-title-main">Rozelle Interchange</span> Motorway interchange in New South Wales, Australia

The Rozelle Interchange is an underground motorway interchange in Sydney, New South Wales, Australia. It was built as part of WestConnex and opened to traffic on 26 November 2023. The interchange includes a toll-free bypass of Victoria Road between the Iron Cove Bridge and the Anzac Bridge known as the Iron Cove Link.

References

  1. O'Sullivan, Matt (5 February 2018). "Sydney Airport road block to state government's $1.8 billion link to WestConnex".
  2. 1 2 "Sydney Gateway Project". MBB Group Pty Ltd. 2016. Archived from the original on 17 November 2017. Retrieved 17 November 2017.
  3. 1 2 3 "Sydney Gateway Concept Design Project Overview" (PDF). Roads and Maritime Services Government of New South Wales. Autumn 2019. Retrieved 15 July 2019.
  4. 1 2 3 "Flyover to the Domestic Terminals" (PDF). Transport for NSW. Retrieved 13 November 2023.
  5. 1 2 3 "International Terminal Connection" (PDF). Transport for NSW. Retrieved 13 November 2023.
  6. 1 2 "New Airport Drive" (PDF). Transport for NSW. Retrieved 17 February 2024.
  7. 1 2 "Second Twin Arch Bridge" (PDF). Transport for NSW. Retrieved 30 April 2024.
  8. 1 2 "Timeline blowout for Sydney's multibillion-dollar Gateway road project". Sydney Morning Herald. 2 November 2020. Retrieved 3 November 2020.
  9. 1 2 3 "A step forward for Sydney Gateway". Transport for NSW. 14 July 2019. Retrieved 15 July 2019.
  10. 1 2 "Botany Rail Duplication Project". Australian Rail Track Corporation. Retrieved 28 May 2020.
  11. "Sydney Gateway – Australia's Front Door". Roads and Maritime Services . Government of New South Wales . Retrieved 17 November 2017.
  12. "Interactive Map". Sydney Gateway. Retrieved 1 October 2021.
  13. "Australia's first female pilot at major commercial airline Deborah Lawrie opens Sydney Airport bridge named in her honour". ABC News. 6 November 2023. Retrieved 13 November 2023.
  14. O'Sullivan, Matt (4 September 2017). "Double toll looms as Lendlease bids to build motorway to Sydney Airport". The Sydney Morning Herald . Retrieved 17 November 2017.
  15. "Sydney Gateway". Australia & New Zealand Infrastructure Pipeline. Retrieved 11 September 2020.
  16. 1 2 "South East Sydney Transport Strategy" (PDF). Future Transport 2056. Transport for NSW. August 2020. Retrieved 11 September 2020.
  17. "Sydney Gateway road project - Planning process" (PDF). Transport for NSW - Roads and Maritime. Spring 2018. Retrieved 27 May 2020.
  18. "Sydney Gateway". Transport for NSW - Roads and Maritime. Archived from the original on 18 February 2020. Retrieved 18 February 2020.
  19. "Sydney Gateway Road Project". Department of Planning, Industry and Environment - Major Projects. Retrieved 11 September 2020.
  20. 1 2 "New Gateway to Sydney on its way". Transport for NSW. 2 November 2020. Retrieved 3 November 2020.
  21. "Sydney Gateway". Sydney Airport. Retrieved 30 August 2021.
  22. "Shortlist announced for Sydney Gateway" (PDF). Australia & New Zealand Infrastructure Pipeline. Transport for NSW. 31 October 2019. Retrieved 28 May 2020.
  23. Sydney Gateway - August 2021, Transport for NSW. Retrieved 30 August 2021
  24. "Sydney Gateway - Upcoming traffic changes" (PDF). Transport for NSW. Retrieved 13 November 2023.