In service | 2008–present |
Manufacturer | AnsaldoBreda |
Constructed | 2005–2011 |
Entered service | 2008–2011 |
Refurbished | Kinki Sharyo 2023–present |
Number built | 50 |
Number in service | 45[ needs update ] |
Fleet numbers | 701-750 |
Capacity | 76 (seated) 141 (standing) |
Operators | ![]() |
Depots | Division 11 (Long Beach) Division 24 (Monrovia) |
Lines served | ![]() |
Specifications | |
Car body construction | Stainless steel |
Car length | 90 ft 0 in (27.43 m) |
Width | 8 ft 8.8 in (2,661 mm) |
Height | 12 ft 3.0 in (3,734 mm) |
Floor height | 39 in (990 mm) |
Entry | Level |
Doors | 8 (4 per side) |
Articulated sections | 2 (one articulation) |
Maximum speed | 75 mph (120 km/h) |
Traction system | Unknown IGBT–VVVF (original) AmePower (refurbished) |
Traction motors | 4 × 194 hp (145 kW) |
Power output | 780 hp (580 kW) |
Electric system(s) | Overhead line, 750 V DC |
Current collection | Faiveley pantograph |
UIC classification | Bo′+2′+Bo′ |
AAR wheel arrangement | B-2-B |
Safety system(s) | ATP |
Coupling system | Tomlinson/Dellner [1] |
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge |
The AnsaldoBreda P2550 is an articulated high-floor electric light rail vehicle manufactured by AnsaldoBreda for the Los Angeles County Metropolitan Transportation Authority's Metro Rail system. [2] 50 vehicles were built between 2005 and 2011, with the first entering service in 2008.
In 2001, the Los Angeles County Metropolitan Transportation Authority (LACMTA) began seeking bids for a new order of light rail vehicles for the Gold Line. [3] Four companies submitted proposals; Bombardier, Kinki Sharyo, Siemens, and AnsaldoBreda. Siemens's proposal did not meet LACMTA requirements, and Bombardier declined to bid due to the terms of the contract. [3]
AnsaldoBreda's bid was lower than that of Kinki-Sharyo, and as a result, on April 24, 2003, LACMTA awarded a contract to AnsaldoBreda for the production of 50 new light rail vehicles at a cost of $158 million, with options for a further 100 vehicles. [3] [4] All trains were to be delivered by 2007. [5]
Bodyshells for the cars were built in Pistoia, Italy, with final assembly in Pittsburg, California. [6] The first vehicles were delivered to Metro in 2005 [7] and were first tested on the Blue Line before becoming exclusive to the Gold Line. Trains first entered service in May 2008, significantly behind the contracted schedule. [8] By 2009, delivery of trains was around three years behind schedule, and Metro alleged that trains were at least 5,000 lb (2,300 kg) overweight. [9] [10] [11] AnsaldoBreda offered to supply Metro with 50 additional trains at a cost of $300 million, with an additional 2 trains as compensation for delivery delays. [10]
Metro decided not to exercise their options to purchase additional P2550 vehicles from AnsaldoBreda, [10] [12] and ordered 235 Kinki-Sharyo P3010 vehicles in 2012. [13] Following the difficulties of the P2550 procurement process, LACMTA revised its quality control procedures for new rolling stock, and began using best value procurement for future contracts. [14]
Kinki Sharyo is refurbishing the fleet at their Palmdale, California facility, beginning in 2023 with Car 721. Components to be upgraded include doors, safety systems, trucks, and climate control systems. [15] [16]
From the beginning of Spring 2023, the P2550 became available to the original A Line (Los Angeles—Long Beach) outside of the former L Line as a result of the completed rail construction and later opening of the Regional Connector.