Bagalur Cross metro station

Last updated

Bagalur Cross
Namma Metro Logo.png Namma Metro station
Bagalur Cross metro station (Oct '24).jpg
Bagalur Cross metro station (Oct '24) - 1.jpg
Bagalur Cross metro station (Oct '24) - 2.jpg
Under construction of this metro station as of October 2024 under Phase 2B of Blue Line of Namma Metro
General information
LocationNH 44, Vinayak Nagar, Kattigenahalli, Bengaluru, Karnataka 560063
Coordinates 13°07′14″N77°36′38″E / 13.12061°N 77.61056°E / 13.12061; 77.61056
Owned by Bangalore Metro Rail Corporation Ltd (BMRCL)
Operated by Namma Metro
Line(s) Blue Line
Platforms Island platform (TBC)
Platform-1 → Krishnarajapura / Central Silk Board
Platform-2 → KIAL Terminals
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure type Elevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningJune 2026;10 months' time (June 2026)(TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Logo.png Namma Metro Following station
Yelahanka Blue Line
(Future Service and skipping Bettahalasuru & Chikkajala)
Doddajala
Location
Bagalur Cross metro station

Bagalur Cross is an upcoming elevated metro station on the North-South corridor of the Blue Line [1] of Namma Metro in Bangalore, India. This metro station will consist of the main Bagalur area with many educational institutions like Chrysalis High (Yelahanka), Ryan International School, Nitte Meenakshi Institute of Technology followed by prime locations like Zodiac Clothing Company Ltd., Palanahalli Lake Park, Manipal Academy of Higher Education (Bagalur Campus) and BSF Institute of Technology. This metro station is slated to be operational around June 2026. [2] [3] [4] [5]

Contents

History

On November 17 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Bagalur Cross metro station, part of the 11.678 km Reach 2B – Package 2 (Hebbala - Bagalur Cross) of the 37.692 km Blue Line of Namma Metro. On September 14 2021, Nagarjuna Construction Company Ltd. (NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [6] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms. [7]

Station layout

Station Layout - To Be Confirmed

Bagalur Cross track layout
BSicon HSTg.svg
BSicon HSTf.svg
BSicon PSTR(L).svg
BSicon PSTR(R).svg
P#
BSicon PSTR(L).svg
BSicon PSTR(R).svg
P#
BSicon PSTR(L).svg
BSicon PSTR(R).svg
to Yelahanka **
BSicon HSTg.svg
BSicon HSTf.svg
Station with two tracks and one Island platform
* Skipping Chikkajala & Bettahalasuru
** Under Construction
GStreet levelExit/Entrance
L1MezzanineFare control, station agent, Ticket/token, shops
L2Platform #
Northbound
Towards → KIAL Terminals
Next Station: Doddajala (Skipping Bettahalasuru & Chikkajala)
Island platform | Doors will open on the right Wheelchair symbol.svg
Platform #
Southbound
Towards ← Krishnarajapura / Central Silk Board
Next Station: Yelahanka

Connections

Entry/Exit

See also

References

  1. "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Retrieved 14 December 2023.
  6. "NCC Wins Bangalore Metro Airport Line's Construction Work". The Metro Rail Guy. 14 September 2021. Retrieved 24 October 2024.
  7. Service, Express News (16 September 2021). "Nagarjuna Construction Company wins bid to build Namma Metro's Airport Line". The New Indian Express. Retrieved 24 October 2024.