Jakkur Cross metro station

Last updated

Jakkur Cross
Jakkur Cross metro station (Oct '24).jpg
Under construction of this metro station as of October 2024 under Phase 2B of Blue Line of Namma Metro
General information
LocationJakkuru Layout, Byatarayanapura, Bengaluru, Karnataka 560092
Coordinates 13°04′13″N77°35′36″E / 13.07038°N 77.59347°E / 13.07038; 77.59347
System
Namma metro icon.svg Namma Metro station
Owned by Bangalore Metro Rail Corporation Ltd (BMRCL)
Operated by Namma Metro
Line Blue Line
Platforms Island platform (TBC)
Platform-1 → Krishnarajapura / Central Silk Board
Platform-2 → KIAL Terminals
Platform Numbers (TBC)
Tracks2 (TBC)
ConnectionsBSicon BAHN.svg Kodigehalli railway station
Construction
Structure type Elevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station codeJKRC (TBC)
History
OpeningJune 2026;7 months' time (June 2026)(TBC)
Electrified(TBC)
Services
Preceding station Namma metro icon.svg Namma Metro Following station
Kodigehalli Blue Line
(Future Service and skipping Jakkur Plantation)
Yelahanka
Location
Jakkur Cross metro station

Jakkur Cross is an upcoming elevated metro station on the North-South corridor of the Blue Line [1] of Namma Metro in Bangalore, India. This metro station will consist of the main Phoenix Mall of Asia, Jakkur suburban area, Jakkur Aerodrome followed by many neighbouring areas like Kodigehalli, Jakkur Lake and Gandhi Krishi Vigyana Kendra, a Deemed-to-be-University in North Bengaluru, India. This metro station is slated to be operational around June 2026. [2] [3] [4] [5]

Contents

History

On November 17 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Jakkur Cross metro station, part of the 11.678 km Reach 2B – Package 2 (Hebbala - Bagalur Cross) of the 37.692 km Blue Line of Namma Metro. On September 14 2021, Nagarjuna Construction Company Ltd. (NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [6] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms. [7]

Station layout

Station Layout - To Be Confirmed

Jakkur Cross track layout
BSicon HSTg.svg
BSicon HSTf.svg
BSicon PSTR(L).svg
BSicon PSTR(R).svg
P#
BSicon PSTR(L).svg
BSicon PSTR(R).svg
P#
BSicon PSTR(L).svg
BSicon PSTR(R).svg
BSicon HSTg.svg
BSicon HSTf.svg
Station with two tracks and one Island platform
* Skipping Jakkur Plantation
** Under Construction
GStreet levelExit/Entrance
L1MezzanineFare control, station agent, Ticket/token, shops
L2Platform #
Southbound
Towards → Hebbal / Krishnarajapura / Central Silk Board
Next Station: Kodigehalli
Island platform | Doors will open on the right Wheelchair symbol.svg
Platform #
Northbound
Towards ← KIAL Terminals
Next Station: Yelahanka

Connections

Entry/Exit

See also

References

  1. "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Retrieved 14 December 2023.
  6. "NCC Wins Bangalore Metro Airport Line's Construction Work". The Metro Rail Guy. 14 September 2021. Retrieved 24 October 2024.
  7. Service, Express News (16 September 2021). "Nagarjuna Construction Company wins bid to build Namma Metro's Airport Line". The New Indian Express. Retrieved 24 October 2024.