Kodibeesanahalli metro station

Last updated

Kodibeesanahalli
Kodibeesanahalli metro station (Mar '25).jpg
Under Construction of this metro station as of March 2025 under Phase 2A of Blue Line of Namma Metro
General information
LocationKodibeesanahalli, Bengaluru, Karnataka 560103
Coordinates 12°56′42″N77°41′53″E / 12.94504°N 77.69810°E / 12.94504; 77.69810
System
Namma metro icon.svg Namma Metro station
Owned by Bangalore Metro Rail Corporation Ltd (BMRCL)
Operated by Namma Metro
Line Blue Line
Platforms Side platform (TBC)
Platform-1 → Central Silk Board
Platform-2 → Krishnarajapura / KIAL Terminals
Platform Numbers (TBC)
Tracks2 (TBC)
ConnectionsBSicon BAHN.svg Belandur Road Railway station
Construction
Structure type Elevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station codeKODI (TBC)
History
OpeningJune 2026;6 months' time (June 2026)(TBC)
Electrified(TBC)
Services
Preceding station Namma metro icon.svg Namma Metro Following station
Kadubeesanahalli Blue Line
(Future Service)
Marathahalli
Location
Kodibeesanahalli metro station

Kodibeesanahalli is an upcoming elevated metro station on the North-South corridor of the Blue Line [1] of Namma Metro in Bangalore, India. Around this metro station holds the IT Companies like JP Morgan Chase,Adobe, Nutanix Technologies Pvt. Ltd followed by Prestige Tech Park containing corporate and IT companies such as CoinSwitch, Amadeus Software Labs, Juniper Networks, Oracle Tech Hub and Byju's - The Learning App. This metro station is slated to become operational around June 2026. [2] [3] [4] [5]

Contents

History

In December 2019, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Kodibeesanahalli metro station, part of the 9.859 km Reach 2A – Package 1 section (Central Silk Board - Kodibeesanahalli) of the 18.236 km Blue Line of Namma Metro. On 13 October 2020, Shankaranarayana Constructions (SNC) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [6] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.

Station layout

Station Layout - To Be Confirmed

Kodibeesanahalli track layout (TBC)
BSicon vCONTgfa.svg
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
P#
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
P#
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
BSicon vCONTgfe.svg
Station with two tracks and two side platforms
** Under Construction
GStreet levelExit/Entrance
L1MezzanineFare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Wheelchair symbol.svg
Platform #
Northbound
Towards → Krishnarajapura**
Next Station: Marathahalli
Platform #
Southbound
Towards ← Central Silk Board
Next Station: Embassy TechVillage Kadubeesanahalli
Side platform | Doors will open on the left Wheelchair symbol.svg
L2Note: ** To be further extended to KIAL Terminals in future

Connections

Entry/Exit

See also

References

  1. "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Archived from the original on 12 January 2024. Retrieved 14 December 2023.
  2. "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Archived from the original on 7 June 2023. Retrieved 14 December 2023.
  3. "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Archived from the original on 8 September 2023. Retrieved 14 December 2023.
  4. "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Archived from the original on 14 December 2023. Retrieved 14 December 2023.
  6. "Afcons & Shankaranarayana Win Bangalore Metro Phase 2A ORR Work". The Metro Rail Guy. 13 October 2020. Archived from the original on 16 April 2024. Retrieved 24 October 2024.