HRBR Layout metro station

Last updated

HRBR Layout
Namma Metro Logo.png Namma Metro station
HRBR Layout metro station (Apr '24).jpg
Under Construction of this metro station as of April 2024 under Phase 2B of Blue Line of Namma Metro
General information
LocationNH 44, Babusabpalya, Kalyan Nagar, Bengaluru, Karnataka 560043
Coordinates 13°01′21″N77°38′51″E / 13.02254°N 77.64739°E / 13.02254; 77.64739
Owned by Bangalore Metro Rail Corporation Ltd (BMRCL)
Operated by Namma Metro
Line(s) Blue Line
Platforms Side platform (TBC)
Platform-1 → Krishnarajapura / Central Silk Board
Platform-2 → KIAL Terminals
Platform Numbers (TBC)
Tracks2 (TBC)
Connections Bus-logo.svg Babusapalya Bus Stop
Construction
Structure type Elevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningJune 2026;19 months' time (June 2026)(TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Logo.png Namma Metro Following station
Horamavu Blue Line
(Future Service)
Kalyan Nagar
Location
HRBR Layout metro station

HRBR Layout is an upcoming elevated metro station on the North-South corridor of the Blue Line [1] of Namma Metro in Bangalore, India. Around this metro station holds the main Babusapalya Park, followed by the main Hennur Police Station, Pai Internationals (Electronics Supermarket), Karnataka Power Transmission Corporation (HRBR Branch) and Royal Enfield Bike Showroom (HRBR Branch). This metro station is slated to become operational around June 2026. [2] [3] [4] [5]

Contents

History

On November 17 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the HRBR Layout metro station, part of the 11 km Reach 2B – Package 1 (Krishnarajapura - Kempapura) of the 37.692 km Blue Line of Namma Metro. On September 14 2021, Nagarjuna Construction Company Ltd. (NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [6] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms. [7]

Station layout

Station Layout - To Be Confirmed

HRBR Layout track layout (TBC)
BSicon vCONTgfa.svg
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
P#
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
P#
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
BSicon vCONTgfe.svg
Station with two tracks and two side platforms
GStreet levelExit/Entrance
L1MezzanineFare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Wheelchair symbol.svg
Platform #
Southbound
Towards → Krishnarajapura / Central Silk Board
Next Station: Horamavu
Platform #
Northbound
Towards ← KIAL Terminals
Next Station: Kalyan Nagar
Side platform | Doors will open on the left Wheelchair symbol.svg
L2

Connections

Entry/Exit

See also

Related Research Articles

<span class="mw-page-title-main">Nagawara metro station</span> Upcoming Namma Metro station under Pink & Blue Lines

Nagawara is an upcoming important underground northern terminal metro station on the North-South corridor of the Pink Line and upcoming elevated metro station on the Blue Line of Namma Metro in Bangalore, India. This metro station will be an interchange metro station between Pink Line and Blue Line.

<span class="mw-page-title-main">Agara metro station</span> Upcoming Namma Metro station under Blue Line

Agara is an upcoming elevated metro station on the North-South corridor of the Blue Line of Namma Metro in Bangalore, India. Around this metro station holds the main Agara, a major suburban area which was operated by the Madras Engineer Groups and was one of the biggest army cantonments during the British Times. This metro station is adjacent to its neighbouring localities like HSR Layout, Koramangala, Outer Ring Road and Varthur. This metro station is slated to become operational around June 2026.

<span class="mw-page-title-main">Kadubeesanahalli metro station</span> Upcoming Namma Metro station under Blue Line

Kadubeesanahalli is an upcoming elevated metro station on the North-South corridor of the Blue Line of Namma Metro in Bangalore, India. This metro station serves mainly Embassy TechnoVillage, which comprises IT companies such J.P. Morgan Chase, Cisco, Wells Fargo, New Horizon College of Engineering and Sakra World Hospital. This is a prime location for its neighbouring areas like Bellandur, Marathahalli, Ibbalur and HAL Aerospace Museum. This metro station is slated to become operational around June 2026.

<span class="mw-page-title-main">Kodibeesanahalli metro station</span> Upcoming Namma Metro station under Blue Line

Kodibeesanahalli is an upcoming elevated metro station on the North-South corridor of the Blue Line of Namma Metro in Bangalore, India. Around this metro station holds the IT Companies like Adobe, Nutanix Technologies Pvt. Ltd followed by Prestige Tech Park containing corporate and IT companies such as CoinSwitch, Amadeus Software Labs, Juniper Networks, Oracle Tech Hub and Byju's - The Learning App. This metro station is slated to become operational around June 2026.

<span class="mw-page-title-main">Marathahalli metro station</span> Upcoming Namma Metro station under Blue Line

Marathahalli is an important upcoming elevated metro station on the North-South corridor of the Blue Line of Namma Metro in Bangalore, India. This metro station serves mainly the Marathahalli suburban area and als WeWork, a coworking space company in South Bengaluru and the main Marathahalli Bridge that connects Kundalahalli area and HAL Aerospace Museum along with the Outer Ring Road which leads towards Hebbal in the north and Silk Board in the south. This metro station is slated to become operational around June 2026.

<span class="mw-page-title-main">ISRO metro station</span> Upcoming Namma Metro station under Blue Line

ISRO is an upcoming elevated metro station on the North-South corridor of the Blue Line of Namma Metro in Bangalore, India. This metro serves mainly the Doddanekundi area, which comprises the ISRO Assembly Integration & Testing Centre in South Bengaluru and the Outer Ring Road, which leads towards Krishnarajapuram in the north and Bellandur in the south. This metro station is slated to become operational around June 2026.

<span class="mw-page-title-main">Doddanekundi metro station</span> Upcoming Namma Metro station under Blue Line

Doddanekundi is an upcoming elevated metro station on the North-South corridor of the Blue Line of Namma Metro in Bangalore, India. This metro station serves IT companies such as Amazon Web Services, Lenovo India, and Qualcomm, in addition to Bagmane Constellation Business Park, Rainbow Children's Hospital and DJ Sports Complex in South Bengaluru. This metro station is slated to become operational around June 2026.

<span class="mw-page-title-main">DRDO Sports Complex metro station</span> Upcoming Namma Metro station under Blue Line

DRDO Sports Complex is an important upcoming elevated metro station on the North-South corridor of the Blue Line of Namma Metro in Bangalore, India. This metro station serves mainly Bagmane Tech Park, which is occupied by top IT companies such as NVIDIA and Samsung under Bagmane Goldstone and Dell EMC, ARM Embedded Technologies, Accenture and Boeing under Bagmane World Technology Centre in South Bengaluru. This metro station is slated to become operational around June 2026.

<span class="mw-page-title-main">Sarasvathi Nagara metro station</span> Upcoming Namma Metro station under Blue Line

Sarasvathi Nagar is an upcoming elevated metro station on the north–south corridor of the Blue Line of Namma Metro in Bangalore, India. This metro station serves mainly Lowry Memorial Educational Institutions, and also a few automotive companies such as Tata Motors, Hyundai, MG, Renault and Honda Motors. This is a prime location for its neighbouring areas like Krishnarajapuram, Mahadevapura and Whitefield. This metro station is slated to become operational around June 2026.

Kasturi Nagar is an upcoming elevated metro station on the North-South corridor of the Blue Line of Namma Metro in Bangalore, India. It is located in the main Kasturinagar area consisting of residential buildings, followed by the main Channasandra railway station, RTO Office (Kasturinagar), Steel Authority of India (SAIL) (Kasturinagar) and Banasawadi Police Station. This metro station is slated to become operational around June 2026.

<span class="mw-page-title-main">Horamavu metro station</span> Upcoming Namma Metro station under Blue Line

Horamavu is an upcoming elevated metro station on the North-South corridor of the Blue Line of Namma Metro in Bangalore, India. Around this metro stations holds the main Horamavu suburban area which is adjacent to Banaswadi, Kalkere and Ramamurthy Nagar, followed by some prime furniture locations like Royaloak Furnitures, Cauvery Furnitures, Damro Furnitures and the famous Horamavu Bridge leading towards Kalkere and Dodda Banaswadi areas. This metro station is slated to become operational around June 2026.

<span class="mw-page-title-main">Kalyan Nagar metro station</span> Upcoming Namma Metro station under Blue Line

Kalyan Nagar is an upcoming elevated metro station on the North-South corridor of the Blue Line of Namma Metro in Bangalore, India. Around this metro station holds the main Kalyan Nagar BMTC Bus Depot cum Bus Stop followed by many prime Jewellery retail stores like Lalitha Jewellery, Tanishq, Kalyan Jewellers, Jos Alukkas and neighbouring Kammanahalli, Hennur and Chelekkere suburban areas. This metro station is slated to become operational around June 2026.

<span class="mw-page-title-main">Kodigehalli metro station</span> Upcoming Namma Metro station under Blue Line

Kodigehalli is an upcoming important elevated metro station on the North-South corridor of the Blue Line of Namma Metro in Bangalore, India. This metro station will mainly serve the Brigade Corporate Offices, consisting of Magnum, Opus, Triumph and Caladium. It also serves prime locations including Aster CMI Hospital, Amruthahalli Lake Park, Godrej Woodsman Estate, RMZ Latitude and many restaurants for the general public. This metro station is slated to be operational around June 2026.

<span class="mw-page-title-main">Jakkur Cross metro station</span> Upcoming Namma Metro station under Blue Line

Jakkur Cross is an upcoming elevated metro station on the North-South corridor of the Blue Line of Namma Metro in Bangalore, India. This metro station will consist of the main Phoenix Mall of Asia, Jakkur suburban area, Jakkur Aerodrome followed by many neighbouring areas like Kodigehalli, Jakkur Lake and Gandhi Krishi Vigyana Kendra, a Deemed-to-be-University in North Bengaluru, India. This metro station is slated to be operational around June 2026.

<span class="mw-page-title-main">Yelahanka metro station</span> Upcoming Namma Metro station under Blue Line

Yelahanka is an upcoming important elevated metro station on the North-South corridor of the Blue Line of Namma Metro in Bangalore, India. This metro station will serve the main Yelahanka suburban area, which contains Yelahanka Junction, along with its Rail Wheel Factory, Yelahanka Lake and Yelahanka Air Force Station. It also includes many residential areas such as SOBHA Palm Court Apartments, Park View Apartments and SLV Nest Apartments.

<span class="mw-page-title-main">Bagalur Cross metro station</span> Upcoming Namma Metro station under Blue Line

Bagalur Cross is an upcoming elevated metro station on the North-South corridor of the Blue Line of Namma Metro in Bangalore, India. This metro station will consist of the main Bagalur area with many educational institutions like Chrysalis High (Yelahanka), Ryan International School, Nitte Meenakshi Institute of Technology followed by prime locations like Zodiac Clothing Company Ltd., Palanahalli Lake Park, Manipal Academy of Higher Education and BSF Institute of Technology. This metro station is slated to be operational around June 2026.

<span class="mw-page-title-main">Doddajala metro station</span> Upcoming Namma Metro station under Blue Line

Doddajala is an upcoming elevated metro station on the North-South corridor of the Blue Line of Namma Metro in Bangalore, India. This metro station will consist of the main ITC Limited office followed by the main Navayuga Devanahalli Tollway Pvt Ltd which will lead towards Kempegowda International Airport in the form of Trumpet Interchange and towards Devanahalli, Nandi Hills, Chikkaballapur, Penukonda and capital city of Telangana, Hyderabad.

<span class="mw-page-title-main">KIAL Terminals metro station</span> Upcoming Namma Metro station under Blue Line

KIAL Terminals is an upcoming underground eastern terminal metro station on the East-West corridor of the Blue Line of Namma Metro in Bangalore, India. This will be an important metro station which will serve the passengers who would be flying to different destinations across the globe.

HBR Layout is an upcoming elevated metro station on the north–south corridor of the Blue Line of Namma Metro in Bangalore, India. Around this metro station comprises the main Hennur Bio-Diversity Park followed by prime locations like VBR PU College, Sun Technology Integrators Pvt. Ltd., Bhima Jewellers, a couple of car company showrooms like Nissan, Mahindra, Hyundai and prime neighbouring areas like Hennur, Lingarajapuram and Outer Ring Road leading towards Hebbal in the north and Kalyan Nagar, Krishnarajapuram and Silk Board in the south. This metro station is stated to become operational around June 2026.

Hebbala is an upcoming elevated metro station on the north–south corridor of the Blue Line of Namma Metro in Bangalore, India. This is a prime location for its neighbouring areas like Hebbal and Kempapura. This metro station is slated to become operational around June 2026.

References

  1. "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Retrieved 14 December 2023.
  6. "NCC Wins Bangalore Metro Airport Line's Construction Work". The Metro Rail Guy. 14 September 2021. Retrieved 24 October 2024.
  7. Service, Express News (16 September 2021). "Nagarjuna Construction Company wins bid to build Namma Metro's Airport Line". The New Indian Express. Retrieved 24 October 2024.