Barrow-in-Furness power station

Last updated

Barrow-in-Furness power station
Barrow-in-Furness power station
CountryEngland, United Kingdom
Location Barrow-in-Furness, Lancashire
Coordinates 54°06′59″N03°13′19″W / 54.11639°N 3.22194°W / 54.11639; -3.22194
StatusDecommissioned and demolished
Construction began1896
Commission date 1899
Decommission date1960
OwnersBarrow-in-Furness Corporation
(1899–1948)
British Electricity Authority
(1948–1955)
Central Electricity Authority
(1955–1957)
Central Electricity Generating Board
(1958–1963)
OperatorAs owner
Thermal power station
Primary fuelCoal
Secondary fuelWater (Coniston hydro-electric)
Turbine technologySteam driven reciprocating engines and steam turbines
Cooling towers4
Power generation
Units operational(See text)
Nameplate capacity 23 MW (1958)
Annual net output 63.9 GWh (1954)

Barrow-in-Furness power station supplied electricity to the town of Barrow-in-Furness and the wider area of Lancashire, England from 1899 to about 1960. It was owned and operated by Barrow-in-Furness Corporation until the nationalisation of the UK electricity supply industry in 1948. The power station was redeveloped throughout its operational life. Barrow-in-Furness Corporation also operated Coniston hydro-electric power station.

Contents

History

In 1894 Barrow-in-Furness Corporation applied for a Provisional Order under the Electric Lighting Acts to generate and supply electricity to the town. This was granted by the Board of Trade and was confirmed by Parliament through the Electric Lighting Orders Confirmation (No. 1) Act 1894 (57 & 58 Vict. c. xlix). [1] The power station was built in Buccleugh Street (54°06'59"N 3°13'19"W) adjacent to the railway line, it first supplied electricity to the town in 1899. [1]

Coniston power station was developed as a small hydro-electric plant in 1932 with a single water turbine, a second turbine was added in 1937. The installation initially supplied power for Barrow County Council and latterly for the village of Coniston. [2]

The 120 MW Roosecote power station east of the town centre was first commissioned in September 1953. This was more efficient than the old Barrow power station which was gradually run-down and decommissioned in about 1960. [3]

Equipment specification

In 1923 the steam generating plant at Barrow comprised: [4]

These machines had a total generating capacity of 8,000 kW of alternating current and 1,025 kW direct current. [4]

A variety of electricity supplies were available to consumers:

Coal could be delivered to the station from a siding off the railway just south of Barrow-in-Furness railway station. [5]

New plant, 1950s

New plant was commissioned over the operational life of the station. In the late 1950s the plant at the station comprised: [6]

The boilers had a total evaporative capacity of 175,000 lb/h (22.0 kg/s), and supplied steam to:

The total installed generating capacity was 23 MW, with an output capacity of 14 MW. [6]

Condenser cooling water was cooled in three wooden cooling towers with a combined capacity of 0.45 million gallons per hour (0.57 m3/s) plus one concrete cooling tower with a capacity of 1.0 million gallons per hour (1.26 m3/s). [6]

The corporation also operated Coniston water turbine generating station at Coniston. This comprised 2 × 150 kW Gilkes-Metropolitan-Vickers water turbo-alternator sets. These generated current at 450 Volts. [6]

Operations

Operating data 1921–23

The operating data for the period 1921–23 is shown in the table: [4]

Barrow-in-Furness power station operating data 1921–23
Electricity UseUnitsYear
192119221923
Lighting and domestic useMWh1,8772,0031,632
Public lighting useMWh57.157.375.7
TractionMWh794733599
Power useMWh6,5534,0925,127
Total useMWh9,2826,8867,434
Load and connected load
Maximum loadkW4,5254,4003,970
Total connectionskW15,00315,83415,825
Load factorPer cent30.924.327.3
Financial
Revenue from sales of current£73,44770,613
Surplus of revenue over expenses£26,11234,496

Under the terms of the Electricity (Supply) Act 1926 (16 & 17 Geo. 5 c. 51) [7] the Central Electricity Board (CEB) was established in 1926. [8] The CEB identified high efficiency ‘selected’ power stations that would supply electricity most effectively; Barrow was designated a selected station. The CEB also constructed the national grid (1927–33) to connect power stations within a region. [8]

Operating data 1946

Barrow-in-Furness and Coniston power stations operating data for 1946 is given below. [9]

Barrow-in-Furness and Coniston power stations operating data, 1946
StationLoad factor per centMax output load MWElectricity supplied GWhThermal efficiency per cent
Barrow18.921.1935.05314.78
Coniston38.70.3211.072––

The British electricity supply industry was nationalised in 1948 under the provisions of the Electricity Act 1947 (10 & 11 Geo. 6 c. 54). [10] The Barrow-in-Furness electricity undertaking was abolished, ownership of Barrow-in-Furness and Coniston power stations were vested in the British Electricity Authority, and subsequently the Central Electricity Authority and the Central Electricity Generating Board (CEGB). [8] At the same time the electricity distribution and sales responsibilities of the Barrow-in-Furness electricity undertaking were transferred to the North Western Electricity Board (NORWEB). At the time of nationalisation the undertaking supplied 23,825 customers over an area of 208 square miles (539 square kilometres). [11]

Operating data 1954–63

Operating data for Barrow power station over the period 1954–59 is shown in the table: [6] [9]

Barrow-in-Furness power station operating data, 1954–59
YearRunning hoursMax output capacity  MWElectricity supplied GWhThermal efficiency per cent
195464822063.915.90
195541232042.915.09
195634872030.214.86
195732251419.714.86
195834461424.415.61
195936421423.014.80

Operating data for Coniston power station was as follows: [6] [12]

Coniston power station operating data, 1954–63
YearRunning hours or load factor (per cent)Max output capacity kWElectricity supplied MWh
19546190300750
195587303001136
19568761300872
195781833001039
19588315300987
1961(39.5 %)3001037
1962(36.4 %)300957
1963(20.55 %)300540

Closure

Barrow power station was decommissioned in about 1960. [3] The buildings were subsequently demolished and the area has been redeveloped as housing.

Coniston power station was decommissioned in the 1960s.

See also

Related Research Articles

<span class="mw-page-title-main">Doncaster Power Station</span>

Doncaster Power Station refers to two coal-fired electricity generating stations situated in the centre of Doncaster in South Yorkshire, England. Doncaster A provided electricity to the town from 1900 to 1958, and the B station from 1953 to 1983.

Carlisle power stations were two electricity generating stations that supplied electricity to Carlisle and the surrounding area from 1899 until 1980. The first power station (1899–1927) was in the centre of the city near Nelson Bridge, and the second larger station was at Willow Holme North-West of the city (1923–1980).

The Lancaster power stations provided electricity to the Lancashire town and city of Lancaster and the surrounding area from 1894 to 1976. The first power station was built and operated by Lancaster Corporation and started generating electricity in April 1894. The second power station was built during the First World War near the Lune Aqueduct to provide electric power for a munitions factory. When the factory closed after the war the power station was purchased by the corporation to provide electric power throughout its supply area.

Huddersfield power station supplied electricity to the town of Huddersfield and the wider area from 1893 to 1981. It was owned and operated by Huddersfield Corporation until the nationalisation of the electricity supply industry in 1948. The power station was redeveloped several times: including the incorporation of new plant in the 1910s, and in the 1930s to 1950s. The station was decommissioned in October 1981.

Lombard Road power station supplied electricity to the Battersea area of South-East London from 1901 to 1972. It was owned and operated by the Borough of Battersea until the nationalisation of the electricity supply industry in 1948. The power station was redeveloped several times: including the incorporation of new plant in the 1910s and the 1930s. The station was decommissioned in 1972.

The Thornhill power station generated and supplied electricity to the town of Dewsbury and the wider regional area from 1902 to 1982, and again from 1998. The first generating station on the site was owned and operated by the Yorkshire Electric Power Company. Following nationalisation of the British electricity supply industry in 1948 Thornhill power station was operated by a succession of state owned bodies. The power station was redeveloped with new plant in 1915, 1925, 1932–37 and 1950–54. The coal-fired steam station was decommissioned in 1982, and was subsequently demolished. A gas turbine power station on the site was commissioned in 1998.

Burton upon Trent power station supplied electricity to the town of Burton upon Trent and the wider area from 1894 to 1976. It was owned and operated by Burton upon Trent Corporation until the nationalisation of the British electricity supply industry in 1948. The power station was redeveloped several times: including the incorporation of new plant in the 1910s, in 1924–28 and 1941–43. The station was decommissioned in October 1976.

Gravesend power station was built by the Gravesend Corporation in 1902–03 to supply the local demand for electricity for lighting. It was built to the west of the municipal gas works, south east of the basin on the Thames and Medway canal. The power station operated until 1970 the buildings were reused but were demolished in 1995.

Hammersmith power station supplied electricity to the London Borough of Hammersmith from 1897 to 1965. It was owned and operated by the Hammersmith Vestry and then the Hammersmith Metropolitan Borough Council until the nationalisation of the British electricity supply industry in 1948. The power station was frequently redeveloped with new plant over its operational life to meet increased demands for electricity. It was decommissioned in 1965.

Wandsworth power station supplied electricity to the London district of Wandsworth and to Putney, Tooting Graveney, Streatham and Clapham from 1897 to 1964. It was owned and operated by the County of London Electric Lighting Company Limited until the nationalisation of the British electricity supply industry in 1948. The power station was redeveloped during its operational life until it was decommissioned in 1964.

Halifax power station supplied electricity to the town of Halifax and the wider area from 1894 to the 1960s. It was owned and operated by Halifax Corporation until the nationalisation of the electricity supply industry in 1948. The power station was redeveloped several times and at its peak had a generating capacity of 48 MW.

Reading power station, Berkshire, England supplied electricity to the town of Reading and the surrounding area from 1895 to the 1960s. It was initially owned and operated by the Reading Electric Supply Company Limited, then from 1933 by the Reading Corporation until the nationalisation of the British electricity supply industry in 1948. The power station was redeveloped several times with new equipment replacing retired plant. The station was decommissioned in the late 1960s.

Fleetwood power stations were two generating stations that supplied electricity to the town of Fleetwood, England and the surrounding area from 1900 to 1981. The first station was owned by the Fleetwood and District Electric Light and Power Syndicate and later by Fleetwood Urban District Council. The second station was owned and operated by the state following the nationalisation of the British electricity supply industry in 1948; this power station was decommissioned in October 1981.

Wallasey power station supplied electricity to the town of Wallasey and the surrounding area from 1897. It was owned and operated by Wallasey Corporation until the nationalisation of the British electricity supply industry in 1948. The power station was redeveloped several times: including the incorporation of new plant in the 1920s and 1950. The station was decommissioned in the late 1960s.

Colchester power station supplied electricity to the city of Colchester, Essex, England and the surrounding area from 1900 to 1960. It was owned and operated by Colchester Corporation prior to the nationalisation of the electricity supply industry in 1948. The power station was redeveloped several times incorporating new plant.

Grimsby power station supplied electricity to the town of Grimsby, England and the surrounded area from 1901 to the late 1960s. It was owned and operated by Grimsby Corporation prior to the nationalisation of the British electricity supply industry in 1948. The power station was redeveloped in the 1920s and 1930s to meet the increased demand for electricity.

Leeds power station, also known as Whitehall Road power station, supplied electricity to the city of Leeds and the surrounding area from 1893 to 1965. It was initially built, owned and operated by the Yorkshire House-to-House Electricity Company Limited. Leeds Corporation took over the electricity undertaking in 1898 and generated and distributed electricity until the nationalisation of the British electricity supply industry in 1948. The power station was redeveloped several times to meet increasing demand for electricity.

Greenhill power station supplied electricity to the town of Oldham, England and the surrounding area from 1921 to 1960. It replaced the older Rhodes Bank generating station and was superseded by Chadderton B power station. Greenhill power station was owned and operated by Oldham Corporation until the nationalisation of the British electricity supply industry in 1948. The power station was built over the period 1921–24 and was decommissioned in 1960.

St Helens power station supplied electricity to the Borough of St Helens and the surrounding area from 1896 to the late 1960s. The power station was developed by the St Helens Corporation which operated it up to the nationalisation of the British electricity supply industry in 1948. It was redeveloped several times to meet the increased demand for electricity.

Neepsend power station supplied electricity to the City of Sheffield and the surrounding area from 1910 to 1976. The power station was owned and operated by the Sheffield Corporation Electricity Department prior to the nationalisation of the British electricity supply industry in 1948. It was operated in conjunction with Blackburn Meadows and Kelham power stations and was closed in 1976.

References

  1. 1 2 Garcke, Emile (1898). Manual of Electrical Undertakings 1898-99 vol. 3. London: P. S. King and Son London. p. 98.
  2. "Coniston hydro generation". waymarking. Archived from the original on 28 October 2012. Retrieved 8 October 2020.
  3. 1 2 Barrow power station operating data is given in Garcke (1959) but it does not appear in CEGB Annual report and Accounts, 1961, 1962 & 1963
  4. 1 2 3 Electricity Commissioners (1925). Electricity Commissioners, Electricity Supply – 1920–23. London: HMSO. pp. 6–9 and 254–59.
  5. Ordnance Survey 25-inch map Lancashire XXI.12 (Barrow In Furness) revised: 1911, published: 1913
  6. 1 2 3 4 5 6 Garrett, Frederick (1959). Garcke's Manual of Electricity Supply vol. 56. London: Electrical Press. pp. A-30, A-46, A-112, A-141.
  7. "Electricity (Supply) Act 1926". legislation.gov.uk. Archived from the original on 7 October 2016. Retrieved 8 October 2020.
  8. 1 2 3 Electricity Council (1987). Electricity supply in the United Kingdom: a Chronology. London: Electricity Council. pp. 45, 60, 69, 73. ISBN   085188105X.
  9. 1 2 Electricity Commission (1947). Generation of Electricity in Great Britain 1946. London: HMSO.
  10. "Electricity Act 1947". legislation.gov.uk. Archived from the original on 12 June 2020. Retrieved 8 October 2020.
  11. "Industrial history of Cumbria - electricity". Cumbria-industries. Archived from the original on 3 November 2014. Retrieved 8 October 2020.
  12. CEGB Annual report and Accounts, 1961, 1962 & 1963