Chennai–Mysuru high-speed rail corridor

Last updated

Chennai–Mysuru High Speed Rail Corridor
Overview
StatusDPR to be prepared
Owner Indian Railways
Locale
Termini
Stations9
Website www.nhsrcl.in
Service
Type High-speed rail
Operator(s) National High Speed Rail Corporation Limited
Rolling stock E5 Series Shinkansen
History
Planned opening2051;28 years' time (2051) [1]
Technical
Line length435 km (270 mi)
CharacterElevated, underground, grade-separated
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Electrification 25 kV AC, 50 Hz, overhead catenary
Operating speed320 km/h (200 mph)
Route map

Contents

BSicon numN285.svg
BSicon exKBHFa.svg
Chennai
BSicon exHST.svg
Poonamallee
BSicon exHST.svg
Arakkonam
BSicon exSTR+GRZq.svg
BSicon exHST.svg
Chittoor
BSicon exSTR+GRZq.svg
BSicon exBHF.svg
Bangarapet
BSicon exBHF.svg
Bengaluru
BSicon exHST.svg
Channapatna
BSicon exHST.svg
Mandya
BSicon exKHSTe.svg
Mysuru

The Chennai-Mysuru high speed rail corridor is India's third high-speed rail project after the Mumbai Ahmedabad High Speed Rail Corridor and Delhi Varanasi High Speed Rail Corridor. The 435 km HSR corridor will connect Chennai to Mysuru through 9 stations.

History

In 2013, Karnataka Chief Minister Siddaramaiah, suggested that the state wanted to run bullet trains from Mysuru to Chennai via Bengaluru, and was conducting talks with his counterparts in Japan about the topic. [2] He commented that the journey could be done in less than two hours, though no studies had yet been conducted prior to those words.

A feasibility study by China on the project was submitted to the Federal Government in June 2015. [3] While Germany also proposed to conduct its own feasibility study at the same time. [4] The then Railways Minister, Suresh Prabhu, suggested that the route would be one of the next high-speed railways to be implemented in India. [5]

Japan Railway Technical Service (JARTS) and Oriental Consultants submitted a feasibility study in early 2016 about constructing the high-speed railway line through a PPP with the government. [6] French state-owned company SNCF also expressed an interest in building a high-speed railway line too.

In early 2017, Indian Railways (IR) responded to a proposal by Elon Musk for a Hyperloop to connect the two cities in thirty minutes, saying that it would be unlikely due to government bureaucracy. [7]

During the June 2017 opening of Bengaluru's Green Line Metro, Japan’s Ambassador to India, Kenji Hiramatsu, suggested that the railway line should be built with support from Japanese development funds. [8]

Description

The high-speed railway line would mainly be built alongside the existing railway between the two cities. However, a 38-kilometre long (24 mi) viaduct between Bangarapet and Vaniyambadi, as well as a 44-kilometre long (27 mi) viaduct between Katpadi and Arakkonam, would need to be constructed due to hilly terrain. [9]

There would be two new railway stations built underground in Chennai and one at Bengaluru, would witness the high-speed trains, running at around 320 km/h (200 mph) [9]

Stations

The Chennai Mysuru high speed rail corridor is planned to have a total of nine stations. [10]

Project status

2018

2020

2021

2022

See also

Related Research Articles

<span class="mw-page-title-main">Namma Metro</span> Rapid transit system in Bengaluru, Karnataka, India

Namma Metro, also known as Bengaluru Metro, is a rapid transit system serving the city of Bengaluru, India. It is the second longest operational metro network in India after Delhi Metro. Upon its inauguration, it became the first underground metro system in South India. Namma Metro has a mix of underground, at grade, and elevated stations. Out of the operational 64 metro stations of Namma Metro as of March 2023, there are 55 elevated stations, 8 underground stations and 1 at-grade station. The system runs on standard-gauge tracks.

This article lists planned or proposed high-speed rail projects, arranged by country. Although many nations have done preliminary feasibility studies, many lines are eventually shelved or postponed due to high costs, and only a few nations of those proposing are actively building high-speed rail lines. Planned or proposed lines are therefore separated here from lines that are under construction, some nations having both. The definition of high-speed rail is public transport by rail at speeds over 200 km/h.

<span class="mw-page-title-main">Transport in Karnataka</span>

Karnataka, a state in South India has a well-developed transport system. Its capital city, Bengaluru is well-connected by air to domestic and international destinations and the Kempegowda International Airport (KIA) in the city is one of the busiest airports in India. It was also the headquarters of the airlines Air Deccan and Kingfisher Airlines. The road transport is also well developed in the state with many National and State highways providing means for fast transportation. The headquarters of the South-Western Railway division of Indian Railways is located at Hubballi and this division governs most of the railway network in the state. Konkan Railway which passes along the coastal region of the state is considered one of the toughest engineering projects being undertaken in India till date. Buses, cars and trains are the means of transport for moving across distant places in Karnataka. For transportation within the city or town limits; motorbikes, cars, autorickshaws and buses are used. With the advent of low-cost airlines, many people are choosing to travel via air as well.

<span class="mw-page-title-main">Bangalore City railway station</span> Railway station in Bangalore, India

Krantivira Sangolli Rayanna (Bengaluru Station), commonly known as KSR Bengaluru Station, Bengaluru City Railway Station or Bangalore City Railway Station or Majestic Railway station (station code: SBC) is the main railway station serving the city of Bengaluru, Karnataka, India. It is the busiest railway station in South Western Railway zone of Indian Railways, and is the only station classified under NSG1 category in the zone.

<span class="mw-page-title-main">Bangalore–Mysore Infrastructure Corridor</span> Road in India

The Nandi Infrastructure Corridor Enterprises Road, commonly known as NICE Road, is a scrapped 4 to 6 lane private tolled expressway in Karnataka, that was intended to connect the two important cities Bengaluru and Mysuru in the Indian state of Karnataka. It will not be implemented, as Bengaluru-Mysuru Expressway is going to replace it as the new Bengaluru-Mysuru Industrial Corridor (EC-34).

<span class="mw-page-title-main">Bengaluru Commuter Rail</span> Planned suburban rail network in Bengaluru, India

Bengaluru Suburban Railway is an under construction suburban rail network for the city of Bengaluru. A Suburban Rail system for the city was first proposed in 1983. Since then, several different route proposals were made but no Suburban Rail project took shape. It was finally approved in the 2019 Railway Budget. On 1 February 2020, finance minister, Nirmala Sitharaman mentioned in her budget that the project would be implemented at cost of Rs 18,600 crores. The central government would provide 20% of the equity and facilitate external assistance up to 60 percent of the project cost. It will be first of its kind and unique in India as it will have metro like facilities and rolling stock. It has slowest design speed among all the new suburban rail projects currently being implemented in India as Nagpur broad-gauge Metro and National Capital Region Transport Corporation are building rail tracks for design speed of 200 km/h with operating speed of 160 km/h.

<span class="mw-page-title-main">High-speed rail in India</span> Overview of current and planned HSR lines in India

Indian Railways does not currently have any operational high-speed rail lines, though a total of eight corridors have been approved, with the corridor between Mumbai and Ahmedabad under construction. As of 2023, the fastest train services in India are the Gatimaan Express and Rani Kamalapati (Habibganj)–Hazrat Nizamuddin Vande Bharat Express with peak operational speed of 160 km/h (99 mph) on the Tughlakabad – Agra Cantonment section of the route.

<span class="mw-page-title-main">Mumbai–Ahmedabad high-speed rail corridor</span> Under-construction high-speed rail line in India

Mumbai–Ahmedabad High Speed Rail Corridor (MAHSR), or Mumbai–Ahmedabad HSR, is an under-construction high-speed rail line, which will connect India's economic and financial hub and Maharashtra’s capital, Mumbai, with the largest city of the state of Gujarat, Ahmedabad. When completed, it will be India's first high-speed rail line.

<span class="mw-page-title-main">Delhi–Kolkata high-speed rail corridor</span> High speed rail corridor

The Delhi–Kolkata high-speed rail corridor is one of the route of the proposed high-speed rail in India. The line is part of the Diamond Quadrilateral Program, which seeks to unite the cities of New Delhi, Kolkata, Mumbai and Chennai via high speed rail. This travels along the Delhi–Howrah main line from Tundla to Howrah. The train expects to cut the journey time for the 1,500 km (930 mi) between the national capital of India, New Delhi, and the capital of the Indian state of West Bengal, the city of Kolkata, to just 5 hours 30 minutes.

The Mumbai–Nagpur High Speed Rail Corridor is a planned high-speed rail line connecting Maharashtra's two major cities, Mumbai and Nagpur. It will be the second line which links Mumbai.

<span class="mw-page-title-main">Kengeri railway station</span> Railway station in Karnataka , India

Kengeri railway station is a major railway station within city limits of Bangalore City on the Mysore–Bangalore railway line. It is one of the major developing railway station in the city of Bangalore in the Indian State of Karnataka. It is located about 10 km away from the Bangalore City. It is the fourth largest railway station in the Indian city of Bangalore after Ksr Bangalore City Railway Station, Yeshwantpur Jn.Railway Station, Bangalore Cantt.Railway Station.It is one of the major stations in Bangalore developing for reducing the rush at Yeshvantpur JN. and Bangalore City railway station.

<span class="mw-page-title-main">Mysore–Bangalore line</span> Railway line in India

Mysore–Bangalore line is a fully electrified double line from Mysore Junction to Bangalore City.

The Coimbatore–Chamrajnagar line is a proposed railway line from Coimbatore in Tamil Nadu to Chamrajnagar in Karnataka. It is a part of the Southern Railway zone of the Indian Railways. Upon construction, this line would connect Western Tamil Nadu with Karnataka. The line would give direct rail connectivity between Coimbatore and Mysore and would reduce the travel distance from Coimbatore to Mysore and Bangalore. It would also connect Tamil Nadu with the Southern districts of Karnataka.

<span class="mw-page-title-main">Transport in Mysore</span> Transport system in Mysore city

Mysore is one of the most important cities in Karnataka due to its tourism and proximity with the capital city of Bangalore. It is the second largest urban agglomeration in the state of Karnataka. It has a well established road and rail transport with other cities in the country.

Kerala Rail Development Corporation d/b/a Kerala-Rail is a public sector joint venture company under the ownership of the Government of Kerala for the railway infrastructure development in Kerala. The company was incorporated on 3 January 2017.

The Mumbai–Hyderabad High Speed Rail Corridor is a planned high-speed rail line connecting India's economic hub Mumbai with the city of Hyderabad. When completed, it will be one of key links in India's high-speed rail line network along with Mumbai-Ahmedabad line.

Delhi–Varanasi High Speed Rail Corridor is India's second High-speed rail project after the Mumbai-Ahmedabad High Speed Rail Corridor. The 958-kilometre (595 mi) HSR corridor will connect Varanasi to Delhi through 13 stations along with a 123 km long spur connecting Lucknow and Ayodhya.

The Hyderabad–Bangalore High Speed Rail Corridor is a proposed high-speed rail line connecting India's two southern metros, Hyderabad and Bangalore. When completed, it will be Southern India's second high-speed rail line along with Chennai–Mysuru high-speed rail corridor. It is also said to be an extension of Mumbai-Hyderabad line.

References

  1. "Railway Budget 2021: Indian Railways to focus on new bullet train networks in coming years?". The Times of India. 23 January 2021.
  2. "Karnataka to operate bullet trains from Bangalore to Mysore and Chennai". Railway Technology. 18 September 2013. Retrieved 17 August 2017.
  3. "Projects: Chennai-Bangaluru-Mysore". High Speed Rail Corporation of India. Retrieved 17 August 2017.
  4. "Study of High Speed Rail Project from Germany on Chennai-Bengaluru-Mysuru sector". Mysuru Today. 30 June 2017. Retrieved 17 August 2017.
  5. "Suresh Prabhu promises new bullet train routes". dna. 6 October 2015. Retrieved 17 August 2017.
  6. "(untitled)" . Construction Intelligence Center. Retrieved 17 August 2017.
  7. "Chennai to Bangalore in Just 30 minutes - Hyperloop's high-speed train headed to India". Detechter. 17 January 2017. Retrieved 17 August 2017.
  8. DH News Service (18 June 2017). "Japan pushes for B'luru-Chennai high-speed rail". Deccan Herald. Retrieved 17 August 2017.
  9. 1 2 "Bangalore to Chennai Bullet Train". Webeo Transportation. 21 April 2017. Retrieved 17 August 2017.
  10. Agarwal, Anshu (22 February 2021). "Aarvee-GSL Wins Chennai-Mysuru HSR's LiDAR & Alignment Design".
  11. "Chennai-Mysore via Bengaluru in 2 HRS 25 mins! Germany proposes bullet train; submits study to Indian Railways". 23 November 2018.
  12. "Wow! Indian Railways eyes 7 more bullet train corridors; all will be open to PPP investments". 21 September 2020.
  13. "Mysuru-Chennai high-speed rail: Govt. to acquire land". Star of Mysore. 30 July 2022.