DOST Hybrid Electric Train

Last updated

Hybrid Electric Train
DOST Hybrid Electric Train at the PNR Alabang Station.jpg
In service20182019 (Trial runs and free passenger rides)
NovemberDecember 2021 (Loop Trial Runs and Free Passenger Rides) [1]
ManufacturerCar body:
Fil-Asia Automotive and Industries
Bodies:
Sung-Shin Rolling Stock Technology Ltd
Designer DOST–MIRDC
Built at Metro Manila, Philippines
Constructed20142015
Entered serviceMay 6, 2019;4 years ago (2019-05-06) (first commercial service)
Number built5 non-articulated cars in 1 trainset
(1 pilot car, 1 power car, 3 passenger cars)
FormationTc-T-T-T-Mc
CapacityDesign load:
175 passengers per car
Crush load:
220 passengers per car
OperatorsDOST → Philippine National Railways
DepotsCaloocan depot → Calamba station
Lines served PNR Metro Commuter Line
Specifications
Car body constructionStructure: Mild steel
Frame interior: Galvanneal steel
Carbody shell: Fiberglass reinforced plastic
Train length60,000 mm (196 ft 10 in)
Car length12,000 mm (39 ft 4 in)
Width2,850 mm (9 ft 4 in)
Height4,432 mm (14 ft 6.5 in)
Doors2 double-sliding doors on each car
Maximum speed80 km/h (50 mph) (computed)
Weight25.5 t (56,000 lb)
Steep gradient 1.2%
Power output1,250 hp (930 kW)
TransmissionHybrid diesel-electric
Power supply 440V diesel genset and 12V x 260 lead-acid batteries
Bogies Sung-Shin outside-oriented H-frame bogies, 2 per car
Minimum turning radius 50 m (160 ft)
Braking system(s) Regenerative
Safety system(s) Automatic train stop
Coupling system In-between cars:
Semi-permanent couplers
Trainset ends:
Automatic couplers
Track gauge 1,067 mm (3 ft 6 in)
Notes/references
Specs are based from the paper by DOST-MIRDC. [2] [3]

The Hybrid Electric Train (HET) is a hybrid electric train built by the Department of Science and Technology's Metals Industry Research and Development Center.

Contents

It is the first train crafted and designed locally by Filipino engineers with parts imported from abroad. It was officially turned over to the Philippine National Railways on June 20, 2019.

Background

The development of the Hybrid Electric Train (HET) is a project of the Metals Industry Research and Development Center (MIRDC) of the Philippine Department of Science and Technology in partnership with the Philippine National Railways (PNR). [4]

The Hybrid Electric Train project began in 2012, and the designing of the train commenced in the following year. [5] The bidding process took place in 2013, with the manufacturing taking place from 2014 to 2015. [6] The project was introduced to the public in June 2016. [7]

The train was developed by ten Filipino engineers and technicians from MIRDC led by head engineer Pablo Acuin. [8]

Specifications

The Hybrid Electric Train is a hybrid electric vehicle powered by electricity and diesel. [9] It has 260 lead acid batteries which is used to run the train and operate its automatic doors, air-conditioning and CCTV systems. [5] It can be converted to utilize lithium battery. [9] It also makes use of regenerative braking technology. [5]

The trainset has five non-articulated cars measuring 12 m (39 ft 4 in) long, 2.85 m (9 ft 4 in) wide, and 4.432 m (14 ft 6.5 in) high with one double-sliding doors on each side of each car, [2] which can carry 220 passengers each at 50 kilometers per hour (31 mph). [10] [11] Four of its cars serve as passenger coaches with one having a driver's cabin, while the other car not mentioned solely serves as a generator car that also includes a driver's cabin.

The train also has an automatic stop safety feature that would activate in an event of a strong earthquake. [8]

The MIRDC contracted local bus and truck manufacturer Fil-Asia Automotive and Industries Corp. to build the train. Fil-Asia in turn outsourced the motor, chassis, engine, motor, axle, and wheels from outside of the Philippines to be able to manufacture it. [5]

The trainset formation is Tc-T-T-T-Mc in which one of the two cabs are the power cars. The Tc car is described as a pilot car, the T cars are described as passenger cars, and the Mc car is described as a power car. [2]

Operational history

Trial runs of the Hybrid Electric Train was conducted in July 2018. [10] The first commercial operations of the Hybrid Electric Train began on May 6, 2019, where it served the Alabang-Calamba Line thrice a day. [12] [13] The train was officially turned over to the Philippine National Railways on June 20, 2019. [14] After a brief hiatus in service, the train returned to service on November 11, 2021 for free rides between Biñan and Calamba stations. The free rides ended on December 3, 2021, [1] and the hybrid electric train has not made any known public appearances afterwards, making seldom test runs since then.

Future

According to DOST Secretary Fortunato de la Peña, the DOST will find private sector firms that will manufacture the rolling stock of the HET before Rodrigo Duterte ends his term as President in 2022. [15]

See also

Related Research Articles

<span class="mw-page-title-main">Philippine National Railways</span> Railway company in the Philippines

The Philippine National Railways (PNR) is a state-owned railway company in the Philippines which operates one commuter rail service between Metro Manila and Laguna, and local services between Sipocot, Naga and Legazpi in the Bicol Region. It is an attached agency of the Department of Transportation.

<span class="mw-page-title-main">Department of Science and Technology (Philippines)</span> Executive department of the Philippine government

The Department of Science and Technology, is the executive department of the Philippine government responsible for the coordination of science and technology-related projects in the Philippines and to formulate policies and projects in the fields of science and technology in support of national development.

<span class="mw-page-title-main">203 series</span> Japanese train type

The 203 series (203系) is an electric multiple unit (EMU) train type operated in Japan between 1982 and 2011 by Japanese National Railways (JNR) and later by East Japan Railway Company, and currently operated by KAI Commuter and Philippine National Railways.

<span class="mw-page-title-main">Sucat station</span> Railway station in Muntinlupa, Philippines

Sucat station is a railway station located on the South Main Line in Muntinlupa, Metro Manila, Philippines. It was originally established by the Manila Railway Company in 1908 as part of the construction of the original Southern Lines to the province of Tayabas, since renamed Quezon. It is also the southernmost area on the PNR Metro Commuter Line to be upgraded to double track as a result of a proposed electrification scheme in 1978.

<span class="mw-page-title-main">Calamba station</span>

Calamba station is a railway station located on the South Main Line in Laguna, Philippines. It is one of two railway stations in the city and it is a major station on the line, serving as the junction between the South Main Line and the old Calamba–Batangas branch line which used to connect to Batangas City. It is also envisioned to be the terminus of the Commuter Express when rehabilitation work is complete. The station was first opened on January 24, 1909.

<span class="mw-page-title-main">PNR Metro Commuter Line</span> Commuter rail line in the Philippines

The PNR Metro Commuter Line was a commuter rail line operated by the Philippine National Railways. It was first inaugurated as the Metro Manila Commuter Service in 1970, and originally served the North Main Line and the South Main Lines, as well as the defunct Carmona and Guadalupe branch lines. Since then, it adopted several names such as Metrotrak and Metrotren, before adopting its present name in the late 2000s. The line was also nicknamed the Orange Line due to its designation in the 1970s.

<span class="mw-page-title-main">Philippine space program</span>

The space program of the Philippines is currently maintained by the Philippine Space Agency (PhilSA) together with various agencies under the Department of Science and Technology (DOST). The space program includes space research and development, and is funded through the National SPACE Development Program (NSDP) by the DOST and received an initial budget of ₱1 billion in 2020.

The Metro Manila Subway, formerly known as the Mega Manila Subway (MMS), is an under-construction underground rapid transit line in Metro Manila, Philippines. The 36-kilometer (22 mi) line, which will run north–south between Valenzuela, Quezon City, Pasig, Taguig, Parañaque and Pasay, consists of 15 stations between the East Valenzuela and Bicutan stations. It will become the country's second direct airport rail link after the North–South Commuter Railway, with a branch line to Ninoy Aquino International Airport.

The Philippine government has commenced a project to develop a locally designed and manufactured Automated Guideway Transit System (AGTS) through its Department of Science and Technology (DOST). Two prototype lines has been set up by the DOST, one within the University of the Philippines Diliman campus and another in Bicutan in Taguig.

<span class="mw-page-title-main">DOST Hybrid Electric Road Train</span> Filipino experimental transit unit

The Hybrid Electric Road Train (HERT) is a hybrid trackless train developed by the Department of Science and Technology of the Philippines for public transport. The headquarter office is located at New Clark City under the town of Capas, Tarlac, Philippines.

<span class="mw-page-title-main">North–South Commuter Railway</span> Future commuter railway line in the Philippines

The North–South Commuter Railway (NSCR), also known as the Clark–Calamba Railway, is a 147-kilometer (91-mile) urban rail transit system under construction in the island of Luzon in the Philippines. Running from New Clark City in Capas to Calamba, Laguna with 36 stations and four services, the railway is designed to improve connectivity within the Greater Manila Area, and it will be integrated with the railway network in the region.

Pansol station is a railway station located on the South Main Line in Calamba, Laguna, Philippines. The station once had a rail yard with four tracks. The single main line track had a long passing loop that contained another, shorter passing loop. It also contained a refuge which led to a ballast pit. The station is 60 km from Tutuban.

<span class="mw-page-title-main">PNR South Main Line</span> Philippine rail line

The PNR South Main Line is one of the two trunk lines that form the Philippine National Railways' network in the island of Luzon, Philippines. It was opened in stages between 1916 and 1938 by the Manila Railroad. Services peaked in the 1940s until the late 1960s, when the system started to decline. Since 1988, it was the only functioning inter-city rail after its counterpart to the north, the North Main Line, was closed. The intercity section of the line in Laguna, Quezon and the Bicol Region was then closed and reopened repeatedly between 2004 and 2014 due to a combination of declining ridership and was closed since then. Currently, only a little more than half of line is operational PNR Metro Commuter Line between Tutuban station and Laguna, Inter-Provincial Commuter from San Pedro to Lucena and the Bicol Commuter regional rail service between Sipocot, Naga Camarines Sur and Legazpi Albay.

College Station is a railway station located on the South Main Line in Los Baños, Laguna, Philippines.

<span class="mw-page-title-main">INKA CC300</span> Diesel hydraulic locomotive built by PT INKA

The INKA CC300, also known in the Philippines as the PNR 9000 Class, is a multipurpose Diesel-hydraulic locomotive owned by Directorate General of Railways and built by Indonesian state-owned rolling stock manufacturer PT INKA. Launched in 2013, it is the first mainline locomotive wholly produced by Indonesia and the first locomotive exported by Indonesia to another country, when the Philippine National Railways (PNR) received its first set of INKA CC300 locomotives in December 2020.

<span class="mw-page-title-main">PNR South Long Haul</span> Philippine rail line

The PNR South Long Haul Project, also known as PNR Bicol is a proposed inter-city rail line in southern Luzon, Philippines. It is part of the larger Luzon Rail System, a network of long-distance standard-gauge lines being built by the Philippine National Railways throughout Luzon. It is one of the two lines that will reconstruct the historic PNR South Main Line, along with the electrified North–South Commuter Railway South section to Calamba, Laguna.

<span class="mw-page-title-main">Rail transportation in the Greater Manila Area</span>

Rail transportation in the Greater Manila Area is a major part of the transportation system in Metro Manila and its surrounding areas. It consists of the Manila Light Rail Transit System, Manila Metro Rail Transit System, and the PNR Metro Commuter Line. The network makes up the majority of active railways in the country and bear the brunt of providing the metropolis with rail as a faster alternative mode of transport other than buses and jeepneys. However, these systems are currently insufficient for the rapidly expanding metropolis; to address this, new lines and line extensions are under construction, which will extend the system far out into neighboring regions.

<span class="mw-page-title-main">PNR EM10000 class</span> Philippine train type

The PNR EM10000 class is an electric multiple unit commuter trainset that will be operated by the Philippine National Railways on the North–South Commuter Railway. Prior to the reveal of its numbering scheme in October 2021, the train was known as the PNR Sustina Commuter. Set to enter service by 2023, it will be PNR's first trainset to be run on standard gauge and powered by electric traction. The trains are also designed to be interoperable with the Metro Manila Subway.

<span class="mw-page-title-main">PNR 8300 class</span> Class of coaches operated by the Philippine National Railways

The PNR 8300 class, also referred to as INKA coaches, is a class of locomotive-hauled passenger coaches operated by the Philippine National Railways since 2021.

References

  1. 1 2 "Live in Laguna? You can ride PNR's hybrid train for free". Coconuts Manila. November 19, 2021. Retrieved November 19, 2021.
  2. 1 2 3 Puerto, Jonathan; Acuin, Pablo; Tamayo, Rodnel (2018). "Design and Development of a Five-Coach Hybrid Electric Train". Philippine Metals. 5. Archived from the original on June 9, 2020. Retrieved April 24, 2019.
  3. Department of Science and Technology (2015). DOST Annual Report 2015 (Report). Archived from the original (PDF) on June 10, 2020. Retrieved June 10, 2020.
  4. "PH-Made HET is DOST's proof that some dreams do come true". Calamba, Laguna: Metals Industry Research and Development Center. Retrieved December 29, 2021.
  5. 1 2 3 4 Cruz, Cherryl Ann (February 21, 2019). "Meet the First Filipino-Built Train: The Hybrid Electric Train (HET)". Carmudi. Retrieved April 24, 2019.
  6. Rey, Aika (January 22, 2019). "PNR to run first Philippine-made train". Rappler. Retrieved April 24, 2019.
  7. "DOST Usec. Guevarra join the Hybrid Electric Train Project Team in its crush load testing". Metals Industry Research and Development Center. Archived from the original on July 27, 2018. Retrieved April 24, 2019.
  8. 1 2 Pa-a, Saul (April 24, 2019). "1st Filipino hybrid train runs from Calamba to Manila". Philippine News Agency. Retrieved April 24, 2019.
  9. 1 2 Velasco, Ed (January 21, 2019). "PH-made trains to roll soon". Manila Times. Retrieved April 24, 2019.
  10. 1 2 Arayata, Ma. Cristina (July 19, 2018). "DOST urges public to try the PH-made hybrid electric train". Philippine News Agency. Retrieved April 24, 2019.
  11. "Details of the Hybrid Electric Train (HET) and Automated Guideway Transit (AGT)". Freedom of Information Philippines. Metals Industry Research and Development Center. Retrieved May 8, 2019.
  12. "Pinoy-made hybrid electric train to start operations May 6". ABS-CBN News. April 24, 2019. Retrieved April 24, 2019.
  13. "DOST's Hybrid Electric Train Inauguration". techmagus. April 29, 2019. Retrieved April 29, 2019.
  14. "DOST-MIRDC turns over the Hybrid Electric Train (HET) to the PNR". The Official Website of Metals Industry Research and Development Center. Retrieved December 29, 2021.
  15. Hybrid electric train, itinurn-over na sa PNR [Hybrid electric train, to be turned over to the PNR](Television production) (in Filipino). People's Television Network. June 20, 2019.