LRTA 1100 class

Last updated

LRTA 1100 class
LRT-1 Monumento 2G (Refurbished) 1100 LRV 2021-12-18.jpg
A 1100 class train at Monumento, December 2021
LRTA 1100 Class (1109A) - Interior (April 2024).jpg
Interior of the train captured in April 2024
Stock type Light rail vehicle
In service1999present
Manufacturer Hyundai Precision & Industries
Adtranz (later Bombardier Transportation, Alstom)
Assembly Changwon, South Korea
Constructed19971998
Entered service1999;25 years ago (1999)
Refurbished20192020
Number built28 vehicles (7 sets)
Number in service16 vehicles (4 sets)
Formation4 cars per trainset
(McMMMc)
Fleet numbers11011128
Capacity1,358 passengers (320 seats)
Operators LRTA (19992015)
LRMC (2015present)
DepotsBaclaran
Lines served ManilaLine1Logo.svg Line 1
Specifications
Car body construction Stainless steel
Train length105.7 m (346 ft 9+2764 in)
Car length26.35 m (86 ft 5+1332 in) (Mc)
26.5 m (86 ft 11+516 in) (M)
Width2.59 m (8 ft 5+3132 in)
Height3.95 m (12 ft 11+3364 in)
Floor height0.92 m (3 ft 732 in)
Platform height 0.69 m (2 ft 3+1164 in)
Doors4 sets of 1.5 m (59 in) double-leaf pocket doors per side
Articulated sections2
Wheel diameter660–600 mm (26–24 in) (new–worn)
Wheelbase 2.31 m (7 ft 6+1516 in)
Maximum speed60 km/h (37 mph)
Weight37.4 t (82,000 lb) (Mc)
36.5 t (80,000 lb) (M)
Axle load 10.7 t (24,000 lb)
Traction system Adtranz [lower-alpha 1] /Voith [lower-alpha 2] IGBT VVVF
Traction motors 4 × 3-phase AC induction motor
  • As built: 125 kW (168 hp)
  • Refurbished: 170 kW (230 hp)
Power outputAs built:
  • 500 kW (670 hp) (single LRV)
  • 2 MW (2,700 hp) (4-car train)
Refurbished:
  • 680 kW (910 hp) (single LRV)
  • 2.72 MW (3,650 hp) (4-car train)
Acceleration 1.1 m/s2 (3.61 ft/s2)
Deceleration 1.3 m/s2 (4.27 ft/s2) (service)
2.08 m/s2 (6.82 ft/s2) (emergency)
Auxiliaries2 × Static inverter
HVAC Roof-mounted duct-type air conditioning
Electric system(s) 750 V DC overhead catenary
Current collector(s) Single-arm pantograph
UIC classification Bo′+2′+Bo′
Bogies FLEXX Metro 1000 [1]
Minimum turning radius 25 m (82 ft 0 in)
Braking system(s) Knorr-Bremse regenerative [2] and electro-pneumatic
Safety system(s) ATP
Coupling system Semi-permanent
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Notes/references
Sourced from [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] unless otherwise noted.

The LRTA 1100 class is the second-generation class of high-floor light rail vehicles of the LRT Line 1.

Contents

The trains were purchased in 1996 as part of a capacity expansion project funded by official development assistance (ODA) loans from Japan. Entering service in 1999, [6] [13] many vehicles were taken out of service due to lack of spare parts. The trains subsequently underwent re-engineering and refurbishment by Voith from 2019 to 2020.

Operational history

Background and purchase

By 1990, the LRT Line 1 in Metro Manila reached its capacity, necessitating the need for capacity expansion. The project, launched in 1994 and undertaken at a cost of ₱4.1 billion, [14] was one of the flagship projects of the administration of President Fidel V. Ramos. [15] Initially, 32 cars with identical specifications to the 1000 class trains were planned to be ordered for the 32 two-car trains operating at the time so that each train would consist of three cars. However, with the increasing transport demand, four-car trains were considered instead. [16]

In February 1996, four bidders were submitted to build the new trainsets. These are a consortium of Marubeni Corporation, Adtranz, and ABB; GEC Alsthom (now Alstom); a consortium of Mitsui and Siemens; and a consortium of Mitsubishi Corporation and Construcciones y Auxiliar de Ferrocarriles. [17] Mitsubishi and CAF would go on to build the fourth-generation train sets as part of the Cavite Extension Project. In August of that year, the Marubeni-Adtranz-ABB consortium was awarded the contract and was signed the following September. [18] [19] On October 18, Hyundai Precision signed a contract to produce 28 cars (7 sets) for the LRT Line 1. These cars were produced between 1997 and 1998 as its first manufactured light rail vehicle. [6]

Commissioning and later decline

The handover ceremony and test-run of the 1100 series LRV was done with former President Joseph Estrada and former Vice-President Gloria Macapagal Arroyo in 1999.[ citation needed ] These trains raised the line's capacity by half [20] from a carrying capacity of 18,000 passengers per hour per direction to 27,000 passengers per hour per direction. [21]

After 2001, many vehicles left the service owing to problems in operations and maintenance. [22] Although spare parts had been substantially given in 2004, 14 cars remained out-of-service due to the lack thereof as of 2013, including two cars involved in a collision. [23] [24] [25] Most of the spare parts for the trains, including brake parts, were only procurable from Adtranz. [11] There were attempts to procure spare parts, but these attempts failed. This was affected by the acquisition of Adtranz by Bombardier Transportation in 2001 (later acquired by Alstom in 2021). Furthermore, parts in the 1200 class and the 1100 class only share 20% commonality. [26]

In addition, these trainsets were, until 2020, used as "skip trains" or trains meant to target a particular station due to extremely high volume of passengers, especially during rush hours.

A 1100 class trainset was used for the first test run of the LRT Line 1 Cavite Extension Phase 1 on December 19, 2023. According to the Light Rail Manila Corporation (LRMC), the 1100 class is the widest in terms of car body, making it the most strategic option to check for initial compatibility of station platforms, walkways, cableways, and others. [27]

Refurbishment

Refurbishment of the second-generation trains was initiated by LRMC in February 2018, which aimed to restore the inactive fleet into serviceable conditions and increase the capacity of Line 1. LRMC and Voith signed an agreement to refurbish the said fleet which includes the control devices, traction systems, and automatic diagnostic displays of main circuits. [28] The refurbishment was carried out between 2019 and 2020 and six out of seven sets returned to operation with an extended vehicle life. [29] The remaining unrepaired set is in the Santolan Depot of LRT-2, due to the ongoing expansion of the Line 1 depot.

Design

The 1100 class are the first 6-axle (3-bogie) light rail vehicles with two articulated cars in the entire rolling stock of the LRT Line 1, as its predecessor, the 1000 class, was built to the 8-axle (4-bogie) design with three sections.

Car body

Adana metro, huzurevi.jpg
T4 Istanbul Metrosu.jpg
The 1100 class trains resemble those of Adana Metro (top) and the LRV34 trains of Istanbul Tram Line T4 (above). Both trains were manufactured by Hyundai Precision's successor, Hyundai Rotem.

The train car body is made of stainless steel, sporting a silver body with yellow and blue cheatlines. Each LRV has four sliding pocket-type doors per side. The 1100 class trains are 90 millimeters (3.5 inches) wider than the 1000 class. [3]

Similar to the 1000 class, the 1100 class have cheatlines of blue and yellow that run through its sides. The trains also served as a prototype for future LRVs made by Hyundai Precision, which bears resemblance to the trains used in the Adana Metro and the Hyundai Rotem LRV34 trains of the Line T4 of the Istanbul Tram.

Each light rail vehicle has two roof-mounted air-conditioning units. In total, there are eight air-conditioning units in a four-car train set. [3]

Interior

The trains have longitudinal seating. A wheelchair provision is present near the articulated portion of the intermediate cars.

Electrical

The 1100 class trains are the first Line 1 trains to have a propulsion system controlled by variable-voltage/variable frequency drive (VVVF) inverters with insulated-gate bipolar transistors (IGBT). The two inverters drive the four 3-phase alternating current, enclosed-type induction motors. [29] Adtranz supplied the original electrical components, while Voith installed the new components. The traction equipment in a refurbished train consists of two Voith EmCon I1000-9AU traction inverters with 350 kilovolt-amperes continuous power in each, two auxiliary static inverters, and a VPort IO control unit. [29]

Prior to refurbishment, the trains produced a distinct high-pitched acceleration sound unique to the Adtranz VVVF controller used, a trait present in the train's derivative models. After refurbishment, the traction acceleration sound is now identical to the one used in the MRTC 3100 class trains, as its traction controller is manufactured by Voith as well.

Mechanical

Each LRV has three outside-frame bogies consisting of two motorized bogies at the ends of the LRV and one trailer bogie under the articulation. [29] Unlike other trains, which have a bogie wheelbase of 1.9 meters (6 ft 3 in), the long, 2.31-meter (7 ft 7 in) wheelbases of the 1100 class trains has caused restricted access to some tracks at the Baclaran Depot. [30] The primary suspension is a chevron rubber spring, while the secondary suspension is an air suspension, similar to the 1200 class. [7] Semi-permanent couplers are present in the ends of each light rail vehicle except the driving cab section of the MC car.

Train formation

The configuration of a four-car trainset is McMMMc. Mc denotes a driving car while M denotes an intermediate car.

Cars of 1100 class
Car typeMcM
A-carB-carA-carB-car
Quantity22
Control cab Yes check.svgDark Red x.svgDark Red x.svgDark Red x.svg
VVVF inverter Yes check.svgYes check.svgYes check.svgYes check.svg
Auxiliary inverter Yes check.svgYes check.svgYes check.svgYes check.svg
Pantograph Yes check.svgDark Red x.svgYes check.svgDark Red x.svg
Car lengthm26.3526.5
ft in86 ft 5+1332 in86 ft 11+516 in
Capacity [7] Seated7882
Standing252267
Total330349

Incidents

See also

Notes

  1. As built
  2. Refurbished

Related Research Articles

<span class="mw-page-title-main">Hyundai Rotem</span> South Korean machinery company

Hyundai Rotem Co. is a South Korean company that manufactures rolling stock, defense products and plant equipment. It is a part of the Hyundai Motor Group. Its name was changed from Rotem to Hyundai Rotem in December 2007 to reflect the parent company. It is also called Hyundai Railroad Technology Systems.

<span class="mw-page-title-main">Manila Light Rail Transit System</span> Rail system serving Metro Manila

The Manila Light Rail Transit System, commonly known as the LRT, is an urban rail transit system that primarily serves Metro Manila, Philippines. Although categorized as a light rail system because it originally used light rail vehicles, it presently has characteristics of a rapid transit system, such as high passenger throughput, exclusive right-of-way, and later use of full metro rolling stock. The LRT is jointly-operated by the Light Rail Transit Authority (LRTA), a government corporation attached to the Department of Transportation (DOTr), and the Light Rail Manila Corporation (LRMC). Along with the Manila Metro Rail Transit System and the Metro Commuter Line of the Philippine National Railways, the system makes up Metro Manila's rail infrastructure.

<span class="mw-page-title-main">Construcciones y Auxiliar de Ferrocarriles</span> Spanish railway and bus manufacturing company

Construcciones y Auxiliar de Ferrocarriles is a Spanish publicly listed company which manufactures railway vehicles and equipment and buses through its Solaris Bus & Coach subsidiary. It is based in Beasain, Basque Autonomous Community, Spain. Equipment manufactured by Grupo CAF includes light rail vehicles, rapid transit trains, railroad cars and locomotives, as well as variable gauge axles that can be fitted on any existing truck or bogie.

<span class="mw-page-title-main">Kinki Sharyo</span> Japanese rolling stock manufacturer

Kinki Sharyo Co., Ltd. is a Japanese manufacturer of railroad vehicles based in Osaka. It is an affiliate company of Kintetsu Corporation. In business since 1920 as Tanaka Rolling Stock Works, and renamed The Kinki Sharyo Co., Ltd in 1945, they produce rolling stock for numerous transportation agencies, ranging from Shinkansen high-speed trains to light rail vehicles. Kinki Sharyo is listed on the Tokyo Stock Exchange as TYO: 7122.

<span class="mw-page-title-main">Baclaran station</span> Train station in Pasay, Philippines

Baclaran station is an elevated Light Rail Transit (LRT) station located on the LRT Line 1 (LRT-1) system in Pasay. Situated on the last stretches of Taft Avenue right at the border with Baclaran, Parañaque, it is the current southern terminus of the line. The terminal is named after the famous shopping district of the same name, which is located on the borders of the cities of Pasay and Parañaque.

<span class="mw-page-title-main">Light Rail Transit Authority</span> Philippine public transport operator

The Light Rail Transit Authority (LRTA) is a public transport operator that is responsible for the construction, operation, maintenance and/or lease of Manila Light Rail Transit System in the Philippines. It is organized as a government-owned and controlled corporation under the Department of Transportation (DOTr) as an attached agency.

<span class="mw-page-title-main">LRT Line 1 (Metro Manila)</span> Light rail line in Manila

The Light Rail Transit Line 1, commonly referred to as LRT Line 1 or LRT-1, is a light rapid transit system line in Metro Manila, Philippines, operated by Light Rail Manila Corporation (LRMC) and owned by the Light Rail Transit Authority (LRTA) as part of the Manila Light Rail Transit System. Originally referred to as Metrorail and the Yellow Line, LRT Line 1 was reclassified to be the Green Line in 2012. It travels in a general north–south direction from Baclaran to Monumento, and then east–west from Monumento to Fernando Poe Jr. Currently, the line consists of 20 stations and runs on 19.7 kilometers of fully elevated route. Although it has the characteristics of light rail, such as with the type of rolling stock used, it is more akin to a rapid transit system owing to its total grade separation and high passenger throughput.

<span class="mw-page-title-main">LRT Line 2 (Metro Manila)</span> Manila Metro line

The Light Rail Transit Line 2, also known as LRT Line 2,LRT-2, or Megatren, is a rapid transit line in Metro Manila in the Philippines owned and operated by the Light Rail Transit Authority (LRTA). The line generally runs in an east–west direction between Recto in Manila and Antipolo. The line is officially referred to as the Purple Line.

<span class="mw-page-title-main">Redemptorist station</span>

Redemptorist station, also known as Redemptorist–Aseana station, is an under-construction Light Rail Transit (LRT) station located on the LRT Line 1 (LRT-1) system in Parañaque. It is part of the Line 1 South Extension Project. The station would be the northernmost of the extension. It would be the twenty-second station from the northern terminus at Common Station. It would be built in Aseana City in Barangay Baclaran and would be named after the nearby Redemptorist Road.

The CAF Urbos is a family of trams, streetcars, and light rail vehicles built by CAF. The Spanish manufacturer CAF previously made locomotives, passenger cars, regional, and underground trains. In 1993, CAF started building trams for Metrovalencia, with the delivery of 16 trams until 1999. This was a variant of a Siemens design and some components were delivered by Siemens, including bogies and traction motors. This design was also sold to Lisbon Trams in 1995; CAF then decided to design and build the Urbos in-house.

The Light Rail Transit Line 6 is a proposed rapid transit system in Cavite, Philippines. There have been two proposals for the line, with the first one shelved immediately in 2018. Another proposal emerged in 2017 and is currently under review by the National Economic and Development Authority (NEDA).

<span class="mw-page-title-main">MRTC 3000 class</span> Light rail vehicle built by ČKD Tatra, a Czech tram manufacturer

The MRTC 3000 class or ČKD Tatra RT8D5M LRV is a first-generation class of high-floor uni-directional light rail vehicles built by Czech tram manufacturer ČKD Tatra. The LRVs are owned by Metro Rail Transit Corporation (MRTC), operated by the Department of Transportation (DOTr) thru DOTr MRT-3, and is currently used on the Manila MRT Line 3.

<span class="mw-page-title-main">LRTA 1000 class</span> Oldest rolling stock operating at LRT-1

The LRTA 1000 class is the first-generation class of high-floor light rail vehicles (LRV) of the LRT Line 1.

<span class="mw-page-title-main">LRTA 1200 class</span> 3rd-generation rolling stock operating at LRT-1

The LRTA 1200 class is the third-generation class of high-floor light rail vehicles (LRV) of the LRT Line 1.

<span class="mw-page-title-main">LRTA 2000 class</span> LRTA Rolling Stock operating at Manila Line 2

The LRTA 2000 class is a class of electric multiple units in operation on the LRT Line 2, manufactured by Rotem and Toshiba.

<span class="mw-page-title-main">Light Rail Manila Corporation</span> Philippine rail service company

Light Rail Manila Corporation (LRMC) is a rail service company based in Pasay, Metro Manila, Philippines. It is a consortium of companies engaged in the operation and maintenance of the Manila Light Rail Transit System Line 1 since September 2015. The consortium is composed of Metro Pacific Investments Corporation and Sumitomo Corporation's Metro Pacific Light Rail Corp. (MPLRC); AC Infrastructure Holdings Corp. ; and Macquarie Infrastructure Holdings (Philippines) Pte. Ltd.

<span class="mw-page-title-main">Ninoy Aquino station</span> Train station in Manila

Ninoy Aquino station, also known as Ninoy Aquino Avenue station, is an under-construction Light Rail Transit (LRT) station located on the LRT Line 1 (LRT-1) system in Santo Niño, Parañaque. It is part of the LRT-1 South Extension Project. The station is built above Ninoy Aquino Avenue, which is named after former Senator Ninoy Aquino, and located on the east bank of the Parañaque River.

<span class="mw-page-title-main">LRTA 13000 class</span> 4th-generation rolling stock operating at LRT-1

The LRTA 13000 class is a class of fourth-generation high-floor light rail vehicles (LRV) of the Light Rail Transit Authority servicing the LRT Line 1.

<span class="mw-page-title-main">Rail transportation in the Greater Manila Area</span>

Rail transportation in the Greater Manila Area is a major part of the transportation system in Metro Manila and its surrounding areas. The railway network, collectively known as the Greater Capital Region Railway System, consists of the Manila Light Rail Transit System (LRT), Manila Metro Rail Transit System (MRT), and Philippine National Railways lines within the region.

<span class="mw-page-title-main">MRTC 3100 class</span> An MRTC Rolling Stock operating at Manila Line 3

The MRTC 3100 class or CRRC Dalian 8MLB LRV is the class of second-generation uni-directional light rail vehicles built in China by CNR Dalian, now CRRC Dalian. Since its delivery, most of the trains are still being tested and undergoing final assessments, before being used on regular services on Line 3 of the Manila Metro Rail Transit System.

References

  1. Bombardier Transportation 2020, p. 3.
  2. "Manila shutoken no kōkyō kōtsū seibi ni kansuru kenshū-yō sofuto seisaku jigyō riyō tebiki-sho" マニラ首都圏の公共交通整備に関する研修用ソフト制作事業 利用手引書 [User guidebook for the production of training software for public transport maintenance in Metro Manila]. Nippon Foundation. 2011. Retrieved May 27, 2020.
  3. 1 2 3 DOTC & LRTA 2012, p. 10.
  4. 1 2 JICA 2013a, p. 5-2.
  5. JICA 2013a, p. 5-4.
  6. 1 2 3 Roteco 1999, p. 1217.
  7. 1 2 3 JICA 2013b, p. A-26.
  8. JICA 2013b, p. B-3.
  9. JICA 2013a, p. 12-87.
  10. JICA 2013a, p. 5-5.
  11. 1 2 LRTA 2006, p. 15-17.
  12. LRTA 2006b, p. 12.
  13. "Managing Safety in LRT-1" (PDF). LRTA. May 27, 2020. Retrieved December 2, 2019.
  14. "LRT to get facelift with new modernization program, says administrator". The Philippine Star. April 9, 2000. Retrieved June 26, 2024.
  15. JICA 2004, p. 2.
  16. JICA 2004, p. 3-4.
  17. "4 foreign firms eye P2.8-B LRT deal". Manila Standard. February 25, 1996. p. 13.
  18. Marcelo, Ellen S. (August 29, 1996). "P2.77-B LRT I contract awarded : Marubeni - ABB group wins". Manila Bulletin.
  19. Villegas, Paul N. (September 24, 1996). "LRTA, Marubeni Corp. sign P1.94-B pact to expand LRT 1". Business World.
  20. DOTC & LRTA 2012, p. 15.
  21. "The Line 1 Capacity Expansion Project (Phase I)". Light Rail Transit Authority. Archived from the original on May 17, 2006. Retrieved January 11, 2022.
  22. DOTC & LRTA 2012, p. 14.
  23. JICA 2013a, p. 3-14.
  24. JICA 2004, p. 9.
  25. JICA 2013a, p. 5-3.
  26. JICA 2010, p. 11.
  27. Sarao, Zacarian (December 20, 2023). "LRT-1 successfully tests Cavite extension phase 1". INQUIRER.net. Retrieved December 31, 2023.
  28. "LRMC, Voith sign agreement for P450M repair of more trains for LRT–1". Light Rail Manila Corporation. February 8, 2018. Retrieved June 20, 2024.
  29. 1 2 3 4 "Modernization of light rail trains". Voith . Archived from the original on November 3, 2021. Retrieved November 3, 2021.
  30. JICA 2013b, p. A-25.
  31. Bacungan, VJ (November 28, 2017). "WATCH: LRT-1 train runs with open door". CNN Philippines. Archived from the original on October 30, 2021. Retrieved July 11, 2021.
  32. Yu, Lance Spencer (August 24, 2023). "LRT1 rides limited to Gil Puyat-Fernando Poe Jr. route from August 25 to 27". Rappler. Archived from the original on August 26, 2023. Retrieved June 11, 2024.

Sources