Overview | |
---|---|
Location | Gibraltar |
Operation | |
Constructed | limestone |
Owner | Government of Gibraltar |
Fordham's Accommodation are underground parallel chambers within the Rock of Gibraltar built during the Second World War. These are part of the extensive tunnels of Gibraltar. The chambers were named after Colonel H M Fordham OBE, MC, who was Chief Engineer in Gibraltar. The chambers were based on Liddell's Union Tunnel. [1]
The tunnel is named after Colonel H M Fordham OBE, MC, who was the Chief Engineer in Gibraltar from 1940 to 1941. The chambers were constructed by enlarging the original Liddell's Union Tunnel which extends southward to the Calpe Hospital chambers which were used by both civilian and military patients. [1] Although at this point only essential civilians were allowed in Gibraltar with the rest having been evacuated.
The purpose of the World War II tunnelling project in Gibraltar was to provide sufficient accommodation to enable a garrison of 16,000 to live underground and resist a siege for a period of up to a year. Therefore, the accommodation had to include a water supply, electric light and power, sanitary arrangements, hospital and laundry in addition to the normal accommodation of personnel. [2] The overall accommodation capacity in this section of tunnels was 6,000. [1]
Chambers allowed the construction of buildings which were either standard army huts (typically Nissen huts, Iris huts or Romney huts) or buildings made of concrete block walls and normal roof trusses. The buildings protected people from annoying drips and the occasional fall of small rocks. Frosted glass windows helped the occupants feel a sense of normality despite being deep underground. [1]
In all chambers two feet of clear air space all round the building was allowed. This space was essential so that water seeping through the rock could drain away through the drainage channels provided; it also permitted air circulation around the buildings, and facilitated periodic inspection of the rock face. [1]
Every chamber having a span of more than 12 feet (3.7 m) was arched, the rise being one fifth of the span. In the early days. spans up to 35 feet (11 m) had been cut with flat roofs, but these gave endless trouble from rock falls, particularly when further excavations were being carried out in the vicinity. One of the largest chambers, 380 feet (120 m) long by 50 feet (15 m) span, was given an 11 feet (3.4 m) rise of arch and was very successful. [1]
In planning economically, the aim was to reduce the access tunnelling to the minimum. Chambers leading directly off the main tunnel, were generally used, with a passing bay provided to avoid congestion or, even better, with a service tunnel. [1] These tunnels were excavated using diamond drills and gelignite. The drill holes were placed over two metres apart armed with a pound of gelignite per metre depth of drilled hole. The blasts were able to reach a free face over 2 metres (6 ft 7 in) and sometimes up to 4.5 metres (15 ft) away. This was a fast way of tunnelling but in retrospect it may have used too much explosive as the remaining rock around tunnels of this era are unstable and rock falls have killed people. [3]
The chambers were generally 28 feet (8.5 m) to 40 feet (12 m) span, and 150 feet (46 m) to 200 feet (61 m) long, and in every case were connected at their ends by a small section tunnel called a 'back drive'. These joining tunnels prevented the chambers from becoming damp and unusable as these connections were essential to allow for the circulation of air assisting in keeping the chambers well ventilated. [1]
Chambers were also cut parallel to the main tunnel. A pillar of rock 20 feet (6.1 m) to 30 feet (9.1 m) wide was allowed between each chamber and, where one system was being developed above another, a clear rock space of 100 feet (30 m) between the two systems was considered the minimum safe thickness. Small communication tunnels, however, up to 12 feet (3.7 m) span, were crossed with only 18 feet (5.5 m) between the roof of the lower tunnel and the floor of the higher. The tunnel design had to be prepared carefully and tunnels were included even though the plan for their use was unclear. This was because it was difficult to add extensions, because the subsequent blasting would have damaged the completed chambers and their fittings. [1]
Underground hard-rock mining refers to various underground mining techniques used to excavate "hard" minerals, usually those containing metals, such as ore containing gold, silver, iron, copper, zinc, nickel, tin, and lead. It also involves the same techniques used to excavate ores of gems, such as diamonds and rubies. Soft-rock mining refers to the excavation of softer minerals, such as salt, coal, and oil sands.
A tunnel is an underground passageway, dug through the surrounding soil/earth/rock and enclosed except for entrance and exit, commonly at each end. A pipeline is not a tunnel, though some recent tunnels have used immersed tube construction techniques rather than traditional tunnel boring methods.
A Nissen hut is a prefabricated steel structure for military use, especially as barracks, made from a half-cylindrical skin of corrugated iron. Designed during the First World War by the American-born, Canadian-British engineer and inventor Major Peter Norman Nissen, it was used also extensively during the Second World War and adapted to the similar Quonset hut in the United States.
A tunnel boring machine (TBM), also known as a "mole", is a machine used to excavate tunnels with a circular cross section through a variety of soil and rock strata. They may also be used for microtunneling. They can be designed to bore through anything from hard rock to sand. Tunnel diameters can range from one metre (3.3 ft) to 17.6 metres (58 ft) to date. Tunnels of less than a metre or so in diameter are typically done using trenchless construction methods or horizontal directional drilling rather than TBMs. TBMs can also be designed to excavate non-circular tunnels, including u-shaped or horseshoe and square or rectangular tunnels.
A dugout or dug-out, also known as a pit-house or earth lodge, is a shelter for humans or domesticated animals and livestock based on a hole or depression dug into the ground. Dugouts can be fully recessed into the earth, with a flat roof covered by ground, or dug into a hillside. They can also be semi-recessed, with a constructed wood or sod roof standing out. These structures are one of the most ancient types of human housing known to archaeologists, and the same methods have evolved into modern "earth shelter" technology.
Croesor quarry is a large underground slate mine in North Wales which was served by Croesor Tramway. Small scale quarrying began in the 1846, and by 1861, there were two companies in operation. They amalgamated in 1865, a year after the quarry was connected to the newly opened Croesor Tramway. Much money was invested in development work, but volumes of useful slate produced were small, amounting to just 226 tons in 1868. Access to the underground workings was by a single adit, and the surface mill was powered by two water wheels. A change of ownership in 1875 did little to improve the profitability of the quarry, and it closed in 1878 or 1882.
The military history of Gibraltar during World War II exemplifies Gibraltar's position as a British fortress since the early 18th century and as a vital factor in British military strategy, both as a foothold on the continent of Europe, and as a bastion of British sea power. During World War II, Gibraltar served a vital role in both the Atlantic Theatre and the Mediterranean Theatre, controlling virtually all naval traffic into and out of the Mediterranean Sea from the Atlantic Ocean.
Maraetai Power Station is a hydroelectric power station on the Waikato River, in the North Island of New Zealand. It is the fifth of the eight hydroelectric power stations on the Waikato River, and at 360 MW, is the largest hydroelectric station on the Waikato.
Nun's Well is an ancient underground water reservoir in the British Overseas Territory of Gibraltar. It is located at Europa Point, and is thought to be of the Moorish period. It represents some of the earliest evidence of an artificial water supply in Gibraltar. The name of the cistern is thought to be derived from the nuns associated with the Shrine of Our Lady of Europe. In the eighteenth century, Nun's Well supplied the military with water. In the early nineteenth century, it provided water for the brewery that was built next door. In 1988, the Royal Engineers constructed what is now the main building, which has a castle-like appearance. Nun's Well became the focus of controversy during the 2010-2011 restoration of the site.
Lord Airey's Shelter is a subterranean military shelter in the British Overseas Territory of Gibraltar. It is located near the southern end of the Upper Rock Nature Reserve, adjacent to Lord Airey's Battery. It was named after the Governor of Gibraltar, General Sir Richard Airey. The tunnel system for the shelter was chosen as the site for the highly classified, Second World War military operation known as Operation Tracer.
Signal Hill Battery or Signal Battery was an artillery battery in the British Overseas Territory of Gibraltar. The battery was mounted high on the rock. Little remains today as the Gibraltar Cable Car top station was built on the site of the old battery.
AROW Street is a tunnel in Gibraltar that was excavated in 1942. The tunnel, like Gibraltar's Great North Road, was large enough to take Army ammunition trucks.
The Gibraltar peninsula, located at the far southern end of Iberia, has great strategic importance as a result of its position by the Strait of Gibraltar where the Mediterranean Sea meets the Atlantic Ocean. It has repeatedly been contested between European and North African powers and has endured fourteen sieges since it was first settled in the 11th century. The peninsula's occupants – Moors, Spanish, and British – have built successive layers of fortifications and defences including walls, bastions, casemates, gun batteries, magazines, tunnels and galleries. At their peak in 1865, the fortifications housed around 681 guns mounted in 110 batteries and positions, guarding all land and sea approaches to Gibraltar. The fortifications continued to be in military use until as late as the 1970s and by the time tunnelling ceased in the late 1960s, over 34 miles (55 km) of galleries had been dug in an area of only 2.6 square miles (6.7 km2).
The Great North Road is a large road tunnel in the British Overseas Territory of Gibraltar. It was constructed by the British military during World War II inside the Rock of Gibraltar and remains property of the Ministry of Defence to this day. The road allowed lorries to travel from the north to the south of Gibraltar entirely within the Rock. The tunnel still contains the remains of World War II buildings such as Nissen huts, kitchens, offices as well as a generating station and period anti-submarine nets.
The tunnels of Gibraltar were constructed over the course of nearly 200 years, principally by the British Army. Within a land area of only 2.6 square miles (6.7 km2), Gibraltar has around 34 miles (55 km) of tunnels, nearly twice the length of its entire road network. The first tunnels, excavated in the late 18th century, served as communication passages between artillery positions and housed guns within embrasures cut into the North Face of the Rock. More tunnels were constructed in the 19th century to allow easier access to remote areas of Gibraltar and accommodate stores and reservoirs to deliver the water supply of Gibraltar.
The Iris hut is a prefabricated steel structure used by the British military predominantly during the early part of the Second World War. They served as barracks, workshops, and storage facilities in World War II Great Britain.
Tofana di Rozes is a mountain of the Dolomites in the Province of Belluno, Veneto, Italy. Located west of the resort of Cortina d'Ampezzo, the mountain's giant three-edged pyramid shape and its vertical south face, above the Falzarego Pass, makes it the most popular peak in the Tofane group, and one of the most popular in the Dolomites.
Parc Quarry was a compact underground slate quarry in the Croesor Valley, Gwynedd, North Wales. It was connected to the Croesor Tramway, which ran through the valley. The quarry concentrated on producing specialist slate products, rather than roofing slates, and was managed for much of the time by the innovator Moses Kellow. It operated for about 50 years, from 1870 to 1920.
Tunnels are dug in types of materials varying from soft clay to hard rock. The method of tunnel construction depends on such factors as the ground conditions, the ground water conditions, the length and diameter of the tunnel drive, the depth of the tunnel, the logistics of supporting the tunnel excavation, the final use and shape of the tunnel and appropriate risk management. Tunnel construction is a subset of underground construction.
The Twynham hut was developed by the British War Office in 1959 as a replacement for the Nissen hut which was first used in 1916. It was constructed of individual 8-foot (2.4 m) bays which made the roof stronger than that of its predecessor. Huts are known to have been constructed in lengths between 16 feet (4.9 m) and 128 feet (39 m). Although four times the cost of Nissen huts the Twynham hut was considered more comfortable and aesthetically pleasing; it also had twice the design life and could be fitted with air conditioning. The huts remained in use until at least 1982.
{{cite book}}
: |first=
has generic name (help)