Higashidōri Nuclear Power Plant

Last updated • 4 min readFrom Wikipedia, The Free Encyclopedia
Higashidōri Nuclear Power Plant
Higashidori Nuclear Power Plant
CountryJapan
Coordinates 41°11′17″N141°23′25″E / 41.18806°N 141.39028°E / 41.18806; 141.39028
StatusOut of service for 12 years, 7 months
Construction beganNovember 7, 2000 (2000-11-07)
Commission date December 8, 2005 (2005-12-08)
Operator(s) Tōhoku Electric Power Company
Tokyo Electric Power Company
Power generation
Units operational1 × 1,100  MW
Units planned3 × 1,385 MW
Nameplate capacity
  • 1,100 MW
Capacity factor 0%
Annual net output 0 GW·h
External links
Website www.tohoku-epco.co.jp/genshi/higashi/

The Higashidōri Nuclear Power Plant (東通原子力発電所, Higashidōri genshiryoku hatsudensho, Higashidōri NPP) is located in the village of Higashidōri in northeastern Aomori Prefecture, on the Shimokita Peninsula, facing the Pacific Ocean. The plant has not generated electricity since Japan's 2011 nationwide nuclear shutdown in the aftermath of the Fukushima Daiichi nuclear disaster.

Contents

The plant is unique in Japan in that it is two adjoining sites, one run by one company, the Tōhoku Electric Power Company and the other run by the Tokyo Electric Power Company. The reactors are all of Toshiba design.

Construction of Tohoku Electric's Higashidori Unit 1 began in November 2000 and was completed in December 2005. The design was based on Tohoku Electric's Onagawa Nuclear Power Plant Unit 3, with improvements to the reactor vessel to allow for greater ease in inspection and maintenance. A separate building, apart from the containment structure, is dedicated specifically for the heat exchanger system based on seawater to provide primary coolant for the reactor.

Earthquake safety

On 24 October 2011 a research group under professor Mitsuhisa Watanabe of Toyo University published a report that raised questions about the seismic safety of the plant-site. A number of faults are present under the complex and in this study it is unclear whether these faults might be active, as some experts noted recently in the NISA safety-screening process. In the study, the researchers said that certain characteristics are typical for the existence of active faults under the plant site, when they analyzed the surveys conducted by the two utilities for constructing the reactors there. Tohoku Electric and TEPCO, denied that there were active faults, and said that the faults were shaped by the swelling of water-bearing strata. Professor emeritus from Hiroshima University, who took part in the analysis, criticized the utilities for this denial. The new report might have an effect on the decision whether to resume operations of the reactor, and could also affect the earthquake-proof safety screenings of other nuclear plants. [1]

On 20 December 2012 a panel of the Japanese Nuclear Regulatory Authority determined that two geologic faults under the nuclear plant were geological active: one fault called F-3 running vertically through the southern part of the plant's grounds close by the reactor 1 and another fault called F-9, that is running parallel with F-3.

Although Tohoku Electric Power claimed that the deformations inside the geological layers were the result of the swelling of clay minerals after they were exposed to water, Kunihiko Shimazaki, commissioner of the Nuclear Regulation Authority and head of the panel, said at the meeting that any argument that the faults were not active was totally unacceptable. [2] [3]

In the application for permission to construct the No. 1 reactor at the Higashidori plant in 1996, Tohoku Electric Power Co. reported that there would be no active faults under the plant's premises. In another report submitted to the government in 2008 in response to the 2006 revision to the government's seismic-resistance design screening guidelines, the company asserted "There are no active faults in the neighborhood within 5 kilometers (from the Higashidori plant)." According to Shimazaki, chairman of the team of experts, the old sketches (of layers studied by Tohoku Electric) lacked credibility. [4]

On 18 February 2012 the NRA-panel of experts presented their draft report on the fault complex at the premises of the nuclear reactor site. Their conclusions:

These conclusions could cause an extra examination of the seismic resistance of the reactor buildings and re-enforcing them.

On 14 February 2013 Tohoku Electric Power Co. made a request to the government to raise the electric power rates, while the company thought that the No. 1 reactor could be restarted around July 2015. At the presentation of the report, Tohoku Electric Power opposed these findings, and argued that water influx had caused the swelling of the geological layers, and it would start their own investigations the next day. The NRA-panel saw no grounds for this reasoning, they did not want to wait and planned to finalize the report with other experts. [5]

Reactors run by Tohoku Electric Company

The Unit 1 was commissioned on March 9, 2005, and then began commercial operation on December 12, 2005. The site area is 3,580,000 m2 (885 acres). [6]

UnitTypeFirst CriticalityElectric Power
Tōhoku Higashidori - 1 BWR March 9, 20051100 MW
Tōhoku Higashidori - 2 (planned) ABWR construction start scheduled for 2016[ needs update ]1385 MW

Reactors run by Tokyo Electric Company

Tepco began construction of its Higashidori-1 unit on January 25, 2011, after approval by METI. [7] The total area of the site is 4.5 square kilometres (1.7 sq mi). [8]

UnitTypeFirst CriticalityElectric Power
Tokyo Higashidori - 1 ABWR construction deferred, schedule to be defined [9] 1385 MW
Tokyo Higashidori - 2 (planned) ABWR schedule to be defined1385 MW

Events

Although the plant was in maintenance shutdown during the 2011 Tohoku earthquake and tsunami, the 7 April aftershock caused the loss of all external power and the plant had to switch to backup power to supply cooling to the spent fuel pool where the reactor's fuel rods were being stored. [10] [11] There were no accidents.

See also

Related Research Articles

<span class="mw-page-title-main">Monju Nuclear Power Plant</span> Closed nuclear power plant in Japan

Monju (もんじゅ) was a Japanese sodium-cooled fast reactor, located near the Tsuruga Nuclear Power Plant, Fukui Prefecture. Its name is a reference to Manjusri. Construction started in 1986 and the reactor achieved criticality for the first time in April 1994. The reactor has been inoperative for most of the time since it was originally built. It was last operated in 2010 and is now closed.

<span class="mw-page-title-main">Nuclear power in Japan</span> Overview of nuclear power in Japan

Prior to the 2011 Tōhoku earthquake and tsunami, Japan had generated 30% of its electrical power from nuclear reactors and planned to increase that share to 40%. Nuclear power energy was a national strategic priority in Japan. As of March 2020, of the 54 nuclear reactors in Japan, there were 42 operable reactors but only 9 reactors in 5 power plants were actually operating. A total of 24 reactors are scheduled for decommissioning or are in the process of being decommissioned. Others are in the process of being reactivated, or are undergoing modifications aimed to improve resiliency against natural disasters; Japan's 2030 energy goals posit that at least 33 will be reactivated by a later date.

<span class="mw-page-title-main">Onagawa Nuclear Power Plant</span> Nuclear power plant in Japan

The Onagawa Nuclear Power Plant genshiryoku hatsudensho, Onagawa NPP) is a nuclear power plant located on a 1,730,000 m2 site in Onagawa in the Oshika District and Ishinomaki city, Miyagi Prefecture, Japan. It is managed by the Tohoku Electric Power Company. It was the most quickly constructed nuclear power plant in the world.

<span class="mw-page-title-main">Tomari Nuclear Power Plant</span>

The Tomari Nuclear Power Plant is the only nuclear power plant in Hokkaidō, Japan. It is located in the town of Tomari in the Furuu District and is managed by the Hokkaido Electric Power Company. All of the reactors are Mitsubishi designs. The plant site totals 1,350,000 m2, with an additional 70,000 m2 of reclaimed land.

<span class="mw-page-title-main">Fukushima Daini Nuclear Power Plant</span> Nuclear power plant in Japan

The Fukushima Daini Nuclear Power Plant Genshiryoku Hatsudensho, Fukushima II NPP, 2F) is a nuclear power plant located on a 150 ha (370-acre) site in the town of Naraha and Tomioka in the Futaba District of Fukushima Prefecture, Japan. The Tokyo Electric Power Company (TEPCO) runs the plant.

<span class="mw-page-title-main">Tōkai Nuclear Power Plant</span> Defunct nuclear power plant in Tokai, Ibaraki Prefecture, Japan (1966-2011)

The Tōkai Nuclear Power Plant was Japan's first commercial nuclear power plant. The first unit was built in the early 1960s to the British Magnox design, and generated power from 1966 until it was decommissioned in 1998. A second unit, built at the site in the 1970s, was the first in Japan to produce over 1000 MW of electricity. The site is located in Tokai in the Naka District in Ibaraki Prefecture, Japan and is operated by the Japan Atomic Power Company. The total site area amounts to 0.76 km2 with 0.33 km2, or 43% of it, being green area that the company is working to preserve.

<span class="mw-page-title-main">Kashiwazaki-Kariwa Nuclear Power Plant</span> Nuclear power plant in Niigata Prefecture, Japan

The Kashiwazaki-Kariwa Nuclear Power Plant is a large, modern nuclear power plant on a 4.2-square-kilometer (1,000-acre) site. The campus spans the towns of Kashiwazaki and Kariwa in Niigata Prefecture, Japan, on the coast of the Sea of Japan, where it gets cooling water. The plant is owned and operated by Tokyo Electric Power Company (TEPCO), and it is the largest nuclear generating station in the world by net electrical power rating.

<span class="mw-page-title-main">Shika Nuclear Power Plant</span> Nuclear power plant in Japan

The Shika Nuclear Power Plant is a nuclear power plant located in the town of Shika, Ishikawa, Japan. It is owned and operated by the Hokuriku Electric Power Company. It is on a site that is 1.6 km2. The plant is currently not producing electricity in the wake of the 2011 Fukushima Daiichi nuclear disaster.

<span class="mw-page-title-main">Tsuruga Nuclear Power Plant</span> Nuclear power plant in Tsuruga, Fukui Prefecture, Japan

The Tsuruga Nuclear Power Plant is located in the city of Tsuruga, Fukui Prefecture, Japan. It is operated by the Japan Atomic Power Company (JAPC). The total site area is 5.12 square kilometres (1.98 sq mi) with 94% of it being green area that the company is working to preserve. The Tsuruga site is a dual site with the decommissioned prototype Fugen Nuclear Power Plant.

<span class="mw-page-title-main">Ōi Nuclear Power Plant</span> Nuclear power plant in Fukui Prefecture, Japan

The Ōi Nuclear Power Plant, also known as Oi or Ohi, is a nuclear power plant located in the town of Ōi, Fukui Prefecture, managed by the Kansai Electric Power Company. The site is 1.88 square kilometers. Ōi Units 3 and 4 were taken offline in September 2013. In December 2017 Kansai Electric Power announced that it will decommission reactors no. 1 and 2 because of their age and the difficulty of making safety upgrades within their small containment vessels. Unit 3 was restarted on 14 March 2018, and unit 4 was restarted on 9 May 2018.

<span class="mw-page-title-main">Takahama Nuclear Power Plant</span>

The Takahama Nuclear Power Plant is a nuclear power plant located in the town of Takahama, Ōi District, Fukui Prefecture. It is owned and operated by the Kansai Electric Power Company. It is on a site with an area of about 1 km2. The four pressurized water reactors give the plant a total gross electric capacity of 3,392 MW and average yearly production of 22,638 GWh.

<span class="mw-page-title-main">Shimane Nuclear Power Plant</span>

The Shimane Nuclear Power Plant is a nuclear power plant located in the town of Kashima-chou in the city of Matsue in the Shimane Prefecture. It is owned and operated by the Chūgoku Electric Power Company.

<span class="mw-page-title-main">Sendai Nuclear Power Plant</span> Nuclear power plant in Satsumasendai, Kagoshima Prefecture, Japan

The Sendai Nuclear Power Plant is a nuclear power plant located in the city of Satsumasendai in Kagoshima Prefecture. The two 846 MW net reactors are owned and operated by the Kyūshū Electric Power Company. The plant, like all other nuclear power plants in Japan, did not generate electricity after the nationwide shutdown in the wake of the Fukushima Daiichi nuclear disaster in 2011, but was restarted on August 11, 2015, and began providing power to nearby towns again. Sendai is the first of Japan's nuclear power plants to be restarted.

<span class="mw-page-title-main">Tohoku Electric Power</span> Japanese electric utility company

Tohoku Electric Power Co., Inc. is an electric utility, servicing 7.6 million individual and corporate customers in six prefectures in Tōhoku region plus Niigata Prefecture. It provides electricity at 100 V, 50 Hz, though some area use 60 Hz.

<span class="mw-page-title-main">Japanese Nuclear Safety Commission</span>

Japan's Nuclear Safety Commission was a commission established within the Cabinet of Japan as an independent agency to play the main role in nuclear safety administration. Commissioners are appointed by the Prime Minister of Japan on Diet approval. The commission has stronger authority than any other ordinary advisory committees, in that the commission can make recommendations to relevant agencies in the name of the prime minister if it is necessary.

<span class="mw-page-title-main">Masao Yoshida (nuclear engineer)</span> Japanese nuclear power plant manager (1955–2013)

Masao Yoshida was a nuclear engineer who served as plant manager of the Tokyo Electric Power Company Fukushima Daiichi Nuclear Power Plant during the Fukushima nuclear disaster.

<span class="mw-page-title-main">Fukushima Daiichi nuclear disaster (Unit 3 Reactor)</span> One of the reactors involved in the Fukushima nuclear accident

Unit 3 of the Fukushima Daiichi Nuclear Power Plant was one of the reactors in operation on 11 March 2011, when the plant was struck by the tsunami produced by the Tohoku earthquake. In the aftermath, the reactor experienced hydrogen gas explosions and suffered a partial meltdown, along with the other two reactors in operation at the time the tsunami struck, unit 1 and unit 2. Efforts to remove debris and coolant water contaminated with radiation are ongoing and expected to last several decades.

<span class="mw-page-title-main">Investigations into the Fukushima Daiichi nuclear disaster</span>

Investigations into the Fukushima Daiichi Nuclear Disaster (or Accident) began on 11 March 2011 when a series of equipment failures, core melt and down, and releases of radioactive materials occurred at the Fukushima Daiichi Nuclear Power Station from the 2011 off the Pacific coast of Tohoku Earthquake and tsunami on the same day.

<span class="mw-page-title-main">March 2021 Miyagi earthquake</span> Earthquakes in Japan

On March 20, 2021 at 18:09 JST. The magnitude 6.9 or 7.0 earthquake struck offshore east of Tōhoku, Japan at a depth of 54.0 kilometers (33.6 mi) to 60 kilometers (37 mi). It had a maximum JMA intensity of Shindo 5+ while on the Mercalli intensity scale, it earned a rating of VII. Power outages and some slight damage in Miyagi was reported.

References

  1. The Daily Mainichi News (25 October 2011) "Active faults exist under nuclear plant in Aomori: study" Archived 2012-07-10 at archive.today
  2. The Mainichi Shimbun (20 December 2012) "Faults at another Japanese nuclear plant site likely active: panel" Archived 2013-02-18 at archive.today
  3. NHK-world (21 December 2012) "Team finds faults at nuclear plant possibly active" [ permanent dead link ]
  4. The Mainichi Shimbun (21 December 2012) "NRA to examine method for fault impact forecast on nuke plants"
  5. The Mainichi Shimbun (18 February 2013) "Panel deems quake faults at Higashidori nuclear plant active" Archived 2013-04-13 at archive.today
  6. Tohoku Power (Japanese). Higashidori Unit 1 Begins Operation Archived 2017-08-18 at the Wayback Machine .
  7. "NucNet". Archived from the original on 2011-10-04. Retrieved 2011-02-04.
  8. Tepco (Japanese). Construction plan overview.
  9. "Tepco, Chubu Electric, Toshiba and Hitachi consider joint venture". Nuclear Engineering International. 22 August 2019. Retrieved 26 August 2019.
  10. "Japanese nuclear plants survive massive aftershock", New Scientist, 7 April 2011
  11. Fukushima Nuclear Accident Update Log, IAEA, 7 April 2011