The history of rail transport in Bolivia began in the 1870s after almost three decades of failed efforts to build railroads to integrate the country, mining was the driving force for the construction of railways. The need to transport saltpeter to the coast triggered the first railway lines in Bolivia. It was the silver mining, however, that drove the construction of a railway from the Pacific coast to the high plateau during the nineteenth century. Later, at the beginning of the twentieth century, tin mining gave a new impetus to railway building, forming what is now known as the Andean or Western network. The eastern network, on the other hand, developed between the years 1940 and 1960 and is financed in exchange for oil through agreements with Argentina and Brazil. Bolivia being a landlocked country, the railways played a fundamental role and the history of its railroads is the history of the country's efforts to reach first ports on the Pacific coast and then the Atlantic.

Contents

Five phases can be distinguished in the history of the railways of Bolivia:

Origin

The origins of Bolivia's railways go back to the 1840s, when the need to transport higher volumes of saltpeter began to be a problem for the future development of nitrate exploitation. Some examples of the first failed efforts in 1856 were the call for a tender to build the CobijaCalama railroad by President Córdova and the agreement between Peru and Bolivia to unite Tacna and La Paz with the "camino lane". In 1867, it was agreed to construct the Cobija–Aduana Nacional railway, a year later the construction of a Cobija–Potosí railroad was approved, and in 1869 authorization was given for the construction of the La Paz–Aigachi railway. However, none were successful. For a complete list of railway projects and the legislation that was approved to carry them out see. [1] On the other hand, the introduction of railways, also known as "railway of mines", to facilitate the transportation of ore in wagons to the interior and exterior of the mine first worked in Karwayqullu (Quijarro, Potosí) from 1853.

First phase (1870–1899)

View of the railway pier and saltpeter in Antofagasta, 1876 Vista del muelle ferroviario y salitreras en Antofagasta 1876.jpg
View of the railway pier and saltpeter in Antofagasta, 1876

The railroads arrived in Bolivia driven by economic interests associated with raw material exports, first of saltpeter and later of silver. The Anglo-Chilean Company of Salitres and Ferrocarril de Antofagasta built the first railroad lines in 1873 from the Salar del Carmen to Antofagasta. [n 1] In 1879 the Pacific War broke out, after which Chile occupied the region of Antofagasta, which became incorporated into Chile after the signing of the 1884 and the treaty of 1904.

In 1885, the Huanchaca Company of Bolivia and the Salitres and Ferrocarril de Antofagasta signed a contract to extend the line of the port to the establishments of the mining company. According to this agreement, the Company of Salitres supplied equipment and machinery and the Huanchaca Company would deliver 2.6 million pesos. Once at the border, a new company would be formed, totally independent, with preferential rates for the Huanchaca Company. In 1886 the railroad arrived in Calama, very close to the new frontier, which aroused great opposition in Bolivia, considering it more of military than commercial interest. Despite this, the government of Gregorio Pacheco (1884–1888) approved the extension of the railway line from Ascotán to Oruro by law of 19 of July 1887. However, when the railway arrived at the border in 1887, the companies did not reach an agreement. To resolve the situation, the Huanchaca Company purchased the railway rights using a loan from English investors. On this basis, The Antofagasta (Chili) Bolivia Railway Co. Ltd. was organized in London on November 28, 1888. In 1889 the Antofagasta–Uyuni section (612 km) was concluded at a cost of £2.2 million. Huanchaca built the Pulacayo–Uyuni branch (36 km) and the PulacayoHuanchaca line (12 km) with a tunnel of almost 3 km. In 1892, the line was extended from Uyuni to the city of Oruro (925 km). [2]

The Antofagasta–Oruro railway took over the Bolivian foreign trade that had traditionally passed through Salta, Argentina, but also enabled imported flour to displace the flour produced in Cochabamba in the markets of La Paz and Oruro and imported sugar to replace the sugar produced traditionally in Santa Cruz and sold in the markets of Potosí. [3]

For the mining industry, railways made it possible to reduce the cost of inputs (especially fuel) and increase export volumes by making it competitive to transport ore with lower silver content. For the Huanchaca Mining Company, the connection of the railway to its works contributed to an increase of 87% in average production between the period 1882–1888 and 1889–1895. [4] In the words of the historian Antonio Mitre, "The railroad, at the same time as prolonged the duration of the silver boom in the nineteenth century, began the tin age in the twentieth century." [5]

Second phase (1900–1929)

Baldwin and Rodgers Locomotive, Pulacayo, c. 1905 Ferrocarril..jpeg
Baldwin and Rodgers Locomotive, Pulacayo, c.1905
Train between Sucre and Potosi, 1931 Tren Sucre Potosi 1931.JPG
Train between Sucre and Potosí, 1931

Just under half of Bolivia's current rail network was built in the first quarter of the twentieth century. The increase in the construction of railways of the early twentieth century was necessary for the political survival of liberals and republicans. The railroads then had a halo of modernity and development that made them indispensable to any government program. [6] They were perceived as a tool that would allow the colonization of vast territories and contribute to territorial integrity. [7] In order to regulate the process of railway expansion, the government of Juan Misael Saracho promulgated of General Law of Railroads the 3rd October 1910.

The political and economic necessity of building railways, led to them accounting for 40% of Bolivia's $72 million foreign debt (mostly British, American and French) between 1900 and 1930. The railways were also financed with indemnities received after the Pacific and Acre wars. Under the terms of the Treaty of Petrópolis signed in 1903, Bolivia received £2 million, which was used to fund the Bolivian Railway (formed in 1906 as part of the Speyer loan) to build the main railway. Under the terms of the 1904 Treaty of Peace and Friendship (1904), the Chilean government undertook to build the Arica–La Paz railway, completed in 1913, thereby connecting the country's political and economic center with Arica, a natural port for Upper Peru since colonial times. Private companies also invested in railways. By 1925, more than 50% of the lines in operation had been built with British capital. [8]

In this second phase, two stages are identified in the construction of railways. In the first (1900–1915) railroads were built that intensified the connection of several regions of the country with the Pacific. They were oriented to the foreign market and therefore associated with mining. Two additional exits were made to the Pacific: the Guaqui–La Paz railway (98 km) completed in 1905 and the Arica–La Paz railway (233 km) completed in 1913. In addition, Oruro was communicated with Viacha (237 km) in 1913 (Line that only arrived at La Paz in 1917); and two important branches were built that had great impact on the mining regions: Río Mulatos–Potosí River (174 km) in 1912 and Uyuni–Atocha (90 km) in 1913. [9]

FCAB, main Maestranza in Uyuni, 1925 FCAB Maestranza principal en Uyuni, 1925.jpg
FCAB, main Maestranza in Uyuni, 1925

In the second stage, starting in 1915, the main objective was to integrate domestic markets. The interests that promoted them and their potential beneficiaries were definitely not directly linked to the mining sector. Therefore, the regional elites had to put pressure on the state for the construction of these railroads. The construction of more railroads began to be completed. First, the La Paz–Yungas railroad (with Beni as final destination), started in 1915 and abandoned after less than 80 km of construction in the 1950s due to lack of financing; then the Sucre–Potosí railroad which began in 1916 and could only be completed in 1935; and finally the Cochabamba–Santa Cruz railway, which began in 1928 and remained unfinished. In this period also began (1915) and concluded (1925) the railroad Atocha–Villazón (206 km) that communicated Uyuni with Argentina. Another railroad completed was from Oruro to Cochabamba (205 km). Although it was initiated in the first stage of this period (1906), its conclusion in 1917 marks a transition between the phase of connection with the outside and that of internal integration. [9] Indeed, this railway was the first major integration effort between two major cities and the most expensive of the railroads built in this period (see Table 1). Rodríguez Ostria synthesizes the arrival of the railroad from Oruro to Cochabamba as follows:

... After twenty-five years of waiting and conflict (1892–1917), forty thousand vociferous people from the city and neighboring towns contemplated the arrival of the first locomotive on July 26, 1917, which, presumably, four more days late and as if he knew the agony of his waiting, he inaugurated his route with two trips to the city of Oruro. Mr. Arana Peredo, a well-known local journalist who expressed the collective feeling, could write in satisfaction: "Modernism has violated the city's doors." [10]

Together with two exceptions of the first period—the Cochabamba–Vinto (18 km) and Cochabamba–Arani (60 km) railroads built by Luz y Fuerza Eléctrica (which included Simón I. Patiño among its main shareholders) between 1910 and 1913—the Oruro–Cochabamba railway had a major impact on the internal transport of passengers and freight. By lowering transportation costs, railroads allowed the importation of foreign products such as sugar and flour, which displaced local production in La Paz, Oruro, Potosí and Cochabamba itself. However, in the case of flour in Cochabamba, local and domestic railways allowed rather the recovery of regional markets in the 1920s that had been adversely affected by railroads in the late nineteenth and early twentieth centuries. [9] On the other hand, the consolidation of the railway network between Bolivia, Argentina and Chile in the mid-1920s led to the development of cattle exports from Tarija to Argentina. [11]

Table 1. Length and cost of construction of the railways in Bolivia, c. 1928
Rail and stretchLength (km)Total cost (£)Cost per km (£)Maximum gradient (%)
Antofagasta & Bolivia Railway
Ollague–Uyuni175462,0002,7501.1
Uyuni–Oruro3141,221,0003,8801.0
Viacha–La Paz30400,00013,3332.4
Bolivia Railway Co.
Uyuni–Atocha90621,6306,9073.0
Mulatos–Potosí River1741,761,70210,1203.0
Oruro–Cochabamba2053,898,08019,0002.6
Viacha–Oruro2021,241,0936,1431.0
Peruvian Corp. Ltd.
Guaqui–La Paz96400,0004,1501.5 (6% income to La Paz)
Ferr. Arica–La Paz2331,105,0004,7422.0
Ferr. La Paz–Yungas53530,00010,0006.0
Ferr. Potosí–Sucre1001,150,00011,5003.0
Ferr. Atocha–Villazón1282,000,000 (approx.)10,1003.0
Ferr. Machacamarca–Uncía96991,66710,3202.5
Ferr. Cochabamba–Arani60150,0002,5001.5
Cochabamba–Vinto1860,0003,8001.5
Ferr. Corocoro–Tarejra841,6005,2001.9
Ferr. Uyuni–Huanchaca38228,000 (approx.)6,0003.5
Source: [12]

As can be seen in Table 1, the construction of railways in Bolivia was costly due to the mountainous topography. [13] With the consolidation of the Western network, Bolivia was firmly linked to the Pacific region. [14] The load exported by Antofagasta increased 70% between 1888 and 1904, the load exported by Guaqui to Port of Mollendo 30% between 1900 and 1904 and that exports by Arica doubled between 1914 and 1917.

Third phase (1930–1963)

The mining crisis, parallel to the Great Depression (1929–1239), negatively affected the railways. In the case of the Ferrocarril de Antofagasta a Bolivia (FCAB) (formerly The Antofagasta (Chili) Bolivia Railway Co. Ltd.), its revenues decreased by 30% {1930} between 1930 and 31 and a 25%. In 1932, with the outbreak of the Chaco War in 1932, however, there was an increase in cargo and revenues due to the transportation of troops, ammunition and supplies to the army. [15]

Passengers and freight transported (TM) by the Ferrocarril de Antofagasta to Bolivia (FCAB) and The Transitory (TM) by the FCAB and BRCo., 1925-1955 Pasajeros y carga transportada (TM) por el FCAB y la BRCo., 1925-1955.png
Passengers and freight transported (TM) by the Ferrocarril de Antofagasta to Bolivia (FCAB) and The Transitory (TM) by the FCAB and BRCo., 1925–1955

As shown in Figure 1, there was a steady increase, except in 1930, both in the number of passengers and in the cargo transported between 1925 and 1955. In passenger transport, the sudden increase between 1950 and 1955 may be due To the greater social mobility during the Bolivian National Revolution. In any case, it shows the important role of the railroad in the transport of passengers when they exceeded the mark of two million and its contribution to the integration of the country. This was the highest point in passenger transport in the history of the Bolivian railways.

The rail network in operation in 1930 amounted to 2,233 km. The 58% (1,294 km) was in the hands of foreign companies, the 6% (144 km) belonged to Bolivian mining companies and 36% (795 km) were state lines. However, some state railroads were in turn leased to foreign companies. [16] Thus, more than eight different "companies" operated the railways in Bolivia. This diversity of operators was detrimental to the standardization of rolling stock and hampered policy coordination, [17] which would be further complicated by the construction of the Santa Cruz de la Cruz Sierra to Yacuiba and Corumbá.

Red Oriental Section San Jose, 2002 Red Oriental Seccion San Jose.jpg
Red Oriental Section San José, 2002

Red oriental

The construction of the eastern network was undertaken to develop the Santa Cruz region and link it to the Atlantic via the Santa Cruz–Yacuiba railroad (517 km) to the Argentine border and Santa Cruz–Corumbá (600 km) to the Brazilian border, respectively. [18]

The Joint Argentine-Bolivian Railway Commission was established in 1938 to address the construction of the Santa Cruz–Yacuiba railroad. The studies were completed in 1943. The Bolivian government funded the studies and the Argentine government financed the construction of the lines, by installments, and then their subsequent equipment. The government of Bolivia paid Argentina these loans by delivering petroleum. [19] Additionally, under this agreement the SucreTarabuco, completed in 1947. The Yacuiba–Santa Cruz railway was inaugurated on December 19, 1957, fifteen years after the formal beginning of the works. [20]

The line to Brazil, Santa Cruz–Corumbá, was financed in part with a million pounds sterling that Brazil committed to Bolivia for a railroad not completed product of Petropolis Treaty and advances that the government of Brazil made to Bolivia for the construction in 1938. [19] As with Argentina, this financing was amortized by Bolivian oil. The first Brazilian locomotive arrived in Santa Cruz in November 1953 and the railroad was inaugurated 5 January 1955, 17 years after the beginning of the works. The definitive construction of bridges and other minor works lasted until 1970. [21]

As can be seen in the maps, the western (or Andean) and eastern networks are not interconnected. The only way to travel between them is through the Argentine railways in a detour of approximately 600 km (see map upper Bolivian Railways and bordering areas) between Yacuiba and Villazón.

Map of the Bolivian network of railroads showing flow of traffic in the several sections, 1975 Flujo de trafico de ENFE (en miles de toneladas) 1975.png
Map of the Bolivian network of railroads showing flow of traffic in the several sections, 1975

Fourth phase (1964–1996)

Nationalization and creation of ENFE

In 1959, the government of Bolivia took over the administration of the Bolivian Railway Co. lines because it had not reached an agreement on the dismissal of personnel which, according to the company, was the cause of its deficit. The danger of the collapse of the railroad, the government returned the administration of the railroad to the FCAB in 1962. [22] According to Zondag, the Bolivian railways were in very poor condition because between 1952 and 1964 had lost much of the transport of fuels due to the construction of oil pipelines; Transportation of sugar and rice to truck transport; and that of passengers to the greater use of buses. [23] Again, the future of railway development was tied to the performance of mining and the export sector.

The nationalization of the railways of the FCAB and the Bolivian Railway Co. was a process that lasted almost two years (1962–1964). Negotiations on compensation were extended until December 1967 when it was agreed that the compensation would be £2.5 million. [24]

Bus rail of ENFE in Viacha, 1981 Ferrobus de ENFE en Viacha.jpg
Bus rail of ENFE in Viacha, 1981

The National State Railways Company (ENFE) was created in 1964 to manage the railways of the FCAB and the Bolivian Railway Co. (1199 km) and the state railroads that derived from these lines (992 km). [25] That year also was transferred to ENFE the railroad Santa CruzCorumbá. In 1967, the government transferred the railroads of the eastern network, Yacuiba, Santa Cruz to ENFE. [26]

In 1967, the Joint Argentine-Bolivian Commission proposed to extend the line to Argentina north of Santa Cruz, but to reach a navigable port in the Amazon River system. The cost of the first 106 km of this project, up to Santa Rosa, was estimated at $7.7 million, while the second tranche of 105 km, to the Yapacaní River, would have an estimated cost of 10.0 million dollars. On October 1, 1970, the stretch to Santa Rosa was inaugurated. The stretch to Yapacaní is still pending. [27]

At the beginning of the seventies, ENFE faced a number of problems common to other railway companies: low-density traffic operations; Old equipment (see Table 2) and poorly maintained; Lack of experienced management cadres and low level of job training; Lack of a trade policy and inadequate tariff structure; Deficit lines (Sucre–Tarabuco and CochabambaAiquile) and excess personnel. As a result, ENFE was in a precarious economic situation and depended on state subsidies. To address this situation and modernize its equipment (going from locomotives that worked with steam to others that worked with diesel, among others) during the 1960s and 1980s, ENFE received credits from the World Bank and Japanese Cooperation (JICA), as well as technical assistance from the United Nations Development Programme (UNDP). [25] [28]

Table 2. Distribution by age of ENFE rolling stock, 1971
TotalLess than 10 yearsFrom 10 to 30 yearsMore than 30 years
Steam locomotives924844
Diesel locomotives2525
Diesel locomotives for maneuvers44
Diesel cars1212
Passenger cars1983195
Freight cars18431004921251
Source: [29]

The cargo transported by ENFE between 1965 and 1995 fluctuated according to the performance of the Bolivian economy, but it was upwards reaching almost 1.3 million tons in 1995. During this period, the volume of cargo transported by the Eastern Network was taking increasing importance. While in 1965 it barely represented 9.9% of the total freight carried by ENFE, in 1995 this percentage reached 50% (Table 3).

Table 3. Historical evolution of freight transport: ENFE (1965–1995) and concessionaire companies (2000–2015): Andean and Oriental Networks
YearAndean Network (TM) %Red Oriental (TM) %Total %
1965893,91490.198,6499.9992,563100.0
1970935,71487.0140,32013.01,076,034100.0
1975814,78271.4326,25928.61,141,041100.0
1980830,03065.0446,49535.01,276,525100.0
1985638,99864.3354,05935.7993,057100.0
1990676,44062.5406,10437.51,082,544100.0
1995673,66750.1671,52349.91,345,190100.0
2000557,00034.91,039,00065.11,596,354100.0
2005520,00028.31,320,10071.71,840,210100.0
20101,047,00046.31,215,68853.72,262,688100.0
20151,053,00038.61,676,24761.42,729,247100.0
Source: 1965–1990:; [30] 1995:; [31] 2000–2015: [32] [33]

In contrast, the number of passengers carried by ENFE between 1965 and 1995 decreased to almost one-third. While in 1965 it carried 1.6 million passengers, in 2000 they were only 0.65 million. As in the case of cargo, however, the relative importance of the eastern grid grew during this period: it represented 45% of passengers transported in 1995 (Table 4).

Table 4. Historical evolution of passenger transport of ENFE (1965–1995) and concessionaire companies (2000–2015): Andean and Eastern Networks
YearRed Andean %Red Oriental %Total %
19651,314,40580.9310,06419.11,624,469100.0
19701,002,35281.5227,58718.51,229,939100.0
1975831,85972.4317,08027.61,148,939100.0
19801,207,29970.7500,93429.31,708,233100.0
19851,572,81071.6625,38228.42,198,192100.0
1990590,36355.1480,45144.91,070,814100.0
1995355,72155.0291,09345.0646,814100.0
2000205,00030.7462,41469.3667,414100.0
2005213,80027.2620,60074.4834,400100.0
2010270,18144.7334,01353.3604,194100.0
2015211,60972.580,30827.5291,917100.0
Source: 1965–1990:; [30] 1995:; [31] 2000–2015: [34] [35]

Fifth phase (1997–2013)

Capitalization

The capitalization of railroads, which began in 1995, was made in the context of the neo-liberal reforms of the Gonzalo Sánchez de Lozada government. It was carried out with several objectives: to restructure the sector through the entry of private entrepreneurs; Reduce political interference; Attract capital to improve infrastructure and operations; Regulate the sector by eliminating existing distortions; reduce dependence on the railroad system for state subsidies and generate revenue for the treasury through taxes, and improve transportation in the country. In capitalization, the Bolivian state maintained ownership of the infrastructure and received royalties for the concession. Assets were transferred as rolling stock, workshop equipment, maintenance and communications, stockpiles of spare parts and materials and office furniture and implements. [36]

The capitalization process of ENFE divided the railway system into two companies: Empresa Ferroviaria Andina S.A.  [ de ] and Empresa Ferroviaria Oriental S.A.  [ de ] The Andina Railway Company was formed on the basis of the Andean Network of National Railways (ENFE), with approximately 2,276 km of tracks in the departments of La Paz, Oruro, Cochabamba and Potosí. [31] Since then the Company Ferroviaria Oriental was in control of the US company Genesee & Wyoming. [37] After the capitalization some roads were dismantled, leaving the city of La Paz without a railroad service. [38] The Eastern Railroad Company was formed on the basis of the Western Enterprise Network of Railways, with approximately 1,426 km, crossing the departments of Santa Cruz, Chuquisaca and Tarija. This last network connects the agricultural environment of Santa Cruz and the natural gas-producing region to the south of Bolivia with Argentina and Brazil. [31] Since then and until September 2009 the Company Ferroviaria Oriental was in control of the US company Genesee & Wyoming.

As can be seen in Table 5, both companies are rather small in relation to the others in Latin America and the Eastern railway company carries the most freight.

Table 5. Bolivian railway companies ordered according to tons-km transported and relative position within the 31 main companies of Latin America, 2008.
Relative positionRailroadTon-km (millions)Tons (millions)Average distance (km)
20°East Rail7871,29620
28°Emp. Andean Rail2340.54433
Source: [39]
Ferrobus de Santa Cruz a Puerto Suarez, Ferroviaria Oriental S.A., 2010 Ferrobus de Santa Cruz a Puerto Suarez, Ferroviaria Oriental S.A..jpg
Ferrobús de Santa Cruz a Puerto Suárez, Ferroviaria Oriental S.A., 2010

Bolivia is the only case in Latin America and Caribbean in which freight concessionaires also offer long-distance passenger services. The railway transport of passengers is still significant in those corridors where there are no permanent roads. In the Andean network services are provided between Oruro, Uyuni, Tupiza and Villazón; in the international connection Uyuni–Abaroa with Chile; and in the internal lines, CochabambaAiquile and PotosíSucre. Passenger transport in these sections amounts to more than 200,000 per year. In the eastern network, passenger transport is even greater, mainly between Santa Cruz and Santa Cruz, bordering Brazil, which mobilizes 500,000 passengers per year. In total, both railroads carry approximately 800,000 passengers per year. [40]

As a result of capitalization, the state succeeded in transforming subsidies in the order of $10 million annually to the former ENFE into income through taxes and fees of about $2.5 million. [31] The private companies met their investment commitments. In addition, the average train speed increased; less derailment occurred and the cost of freight transportation was reduced. However, passenger tariffs were raised, in part because they were previously subsidized. [41] At the same time, the coverage of the rail system was reduced by closing several unproductive branches, which were returned by the private companies to the State. In fact, 3,692 km were transferred to private enterprises in 1997 and in 2011 they operated 1,954 km, that is 47.1% less. [42]

If the mining of the silver and then the tin began the construction of railroads at the end of the nineteenth century and beginning of the twentieth century, then of the interlude by the construction of the Eastern network in the middle of the last century—as to "close the circle" in the history of the railways in Bolivia—at the beginning of the century again the laying of railway lines. This time is the exploitation of silver, lead and zinc in San Cristóbal  [ es ]. In order to transport zinc-silver and lead-silver concentrates from the concentration plant to the Uyuni–Antofagasta railway, the Minera San Cristóbal company built a railway branch with a gauge of one meter wide and 65 km in length. On average, the mine exports about 1,300 tonnes of zinc-silver concentrates and 300 tonnes of lead-silver concentrates every day. [43]

Future Challenges

The interconnection between the eastern and Andean networks is a project pending since the middle of the twentieth century. Several alternatives have been considered and the most studied line has been the one that links Aiquile in Cochabamba (Andean network) with Santa Cruz (Eastern network) approximately 400 km. The most relevant traffic to justify such work is the transport of iron ore from El Mutún on the border with Brazil to the Pacific. [44]

The estimated cost of the work is less than one billion dollars. However, it amounts to three billion dollars considering the investment needed to rehabilitate the roads and improve the layout of the networks in Bolivia and Chile to raise the weight per axle to 25 tons and make financially viable investment. [44]

During his trip to China in December 2013, President Evo Morales talked to General Secretary of the Chinese Communist Party Xi Jinping about the possibility of building the interconnection between the Andean and Eastern network as part of the interoceanic corridor to link the Atlantic with the Pacific. Thus Bolivian exports would be directed towards the Peruvian port of Ilo. The Chinese paramount leader requested a pre-feasibility study for 2014. [45]

See also

Related Research Articles

<span class="mw-page-title-main">Transport in Argentina</span>

Transport in Argentina is mainly based on a complex network of routes, crossed by relatively inexpensive long-distance buses and by cargo trucks. The country also has a number of national and international airports. The importance of the long-distance train is minor today, though in the past it was widely used and is now regaining momentum after the re-nationalisation of the country's commuter and freight networks. Fluvial transport is mostly used for cargo.

Transport in Bolivia is mostly by road. The railways were historically important in Bolivia, but now play a relatively small part in the country's transport system. Because of the country's geography, aviation is also important.

<span class="mw-page-title-main">Oruro</span> City in Oruro Department, Bolivia

Oruro or Uru Uru is a city in Bolivia with a population of 264,683, about halfway between La Paz and Sucre in the Altiplano, approximately 3,709 meters (12,169 ft) above sea level.

UNITEL is a Bolivian commercial television network headquartered in Santa Cruz de la Sierra, Bolivia. It was founded in 1987 in Santa Cruz de la Sierra as Teleoriente, which in 1997 created the current network and bought two Telesistema Boliviano stations. It is owned by businessman Osvaldo Monasterio Nieme. The company broadcasts sports, entertainment, political programs, and daily news programs nationwide in the South American country.

<span class="mw-page-title-main">Trans-Andean railways</span>

The Trans-Andean railways provide rail transport over the Andes. Several are either planned, built, defunct, or waiting to be restored. They are listed here in order from north to south.

<span class="mw-page-title-main">Uyuni</span> City in Potosí Department, Bolivia

Uyuni is a city in the southwest of Bolivia.

<span class="mw-page-title-main">Empresa de los Ferrocarriles del Estado</span> State-owned railway company in Chile

Empresa de los Ferrocarriles del Estado is the national railway and the oldest state-run enterprise in Chile. It manages the infrastructure and operating rail services in the country.

<span class="mw-page-title-main">Bolivian Army</span> Land warfare branch of Bolivia

The Bolivian Army is the land force branch of the Armed Forces of Bolivia. Figures on the size and composition of the Bolivian army vary considerably, with little official data available. It is estimated that the army has between 26,000 and 60,000 men. On June 26, 2024, the General of the Army, General Juan José Zúñiga, was dismissed and replaced with José Wilson Sánchez due to the former leading the 2024 Bolivian coup attempt against President Luis Acre.

<span class="mw-page-title-main">Mariano Baptista</span> 23rd President of Bolivia

Mariano Baptista Caserta was a Bolivian politician, orator and journalist. An outstanding intellectual of his time, he was a deputy in various periods, Minister of Foreign Affairs (1873-1876) and (1888-1891), President of Congress (1884-1888), Constitutional President of the Republic (1892-1896) and Vice President of the Republic (1884-1888).

<span class="mw-page-title-main">Ferrocarril de Antofagasta a Bolivia</span> Narrow gauge railway line in Chile

The Ferrocarril de Antofagasta a Bolivia is a private railway operating in the northern provinces of Chile. It is notable in that it was one of the earliest railways built to 2 ft 6 in narrow gauge, with a route that climbed from sea level to over 4,500 m (14,764 ft), while handling goods traffic totaling near 2 million tons per annum. It proved that a railway with such a narrow gauge could do the work of a standard gauge railway, and influenced the construction of other railways such as the Estrada de Ferro Oeste de Minas. It was later converted to 1,000 mmmetre gauge, and still operates today.

<span class="mw-page-title-main">General Manuel Belgrano Railway</span> Argentine state-owned railway company

The General Manuel Belgrano Railway (FCGMB), named after the Argentine politician and military leader Manuel Belgrano, is a 1,000 mmmetre gauge railway and the longest of the Argentine system. It was one of the six State-owned Argentine railway companies formed after President Juan Perón's nationalisation of the railway network in 1948.

<span class="mw-page-title-main">Electricity sector in Bolivia</span>

The electricity sector in Bolivia is dominated by the state-owned ENDE Corporation, although the private Bolivian Power Company is also a major producer of electricity. ENDE had been unbundled into generation, transmission and distribution and privatized in the 1990s, but most of the sector was re-nationalized in 2010 (generation) and 2012.

<span class="mw-page-title-main">Outline of Bolivia</span> Country in South America

The following outline is provided as an overview of and topical guide to Bolivia:

Following is a list of railway stations in Bolivia, categorized by eastern and western networks. The eastern and western networks do not directly connect, except via a roundabout route through Argentina.

<span class="mw-page-title-main">Rail transport in Bolivia</span>

The Bolivian rail network has had a peculiar development throughout its history.

<span class="mw-page-title-main">Aerocon</span> Former airline of Bolivia

Aero Comercial Oriente Norte Ltda., doing business as Aerocon, was a Bolivian airline. Its national office was in Hangar 93 in El Trompillo Airport in Santa Cruz de la Sierra.

<span class="mw-page-title-main">History of rail transport in Chile</span>

The history of rail transport in Chile has gone through several periods of boom and bust. It began in 1840, with the construction by William Wheelwright of the first branch in the north. Further construction proceeded apace linking cities from Pisagua all the way to Puerto Montt.

Uyuni Airport, also known as Joya Andina Airport, is an airport at extremely high elevation just northwest of Uyuni, in the southwestern Potosí Department of Bolivia. It is close to the Salar de Uyuni, the world's largest salt flat. It was opened by the Bolivian president Evo Morales on July 11, 2011. Currently the airport is served by one airline: Boliviana de Aviacion which offers regular flights to and from La Paz and Cochabamba.

Banco Mercantil Santa Cruz S.A. doing business as Mercantil Santa Cruz is a Bolivian bank and financial services company with headquarters in La Paz. As of 2015, Banco Mercantil Santa Cruz is the largest bank in Bolivia by assets. It is a full-service corporation that provides a wide range of financial products and services to an individual and corporate client base through a national network of operating 93 branches, more than 350 ATMs, call centers, and online and mobile banking platforms.

References

  1. Luis Reynaldo Gómez Zubieta (19 June 2017). "Ferrocarriles Bolivia. Del anhelo a la frustración. Comunicaciones, desarrollo, producción, economía y dependencia" (in Spanish). ferrocarrilesbolivia.com. Archived from the original on 13 December 2013. Retrieved 18 June 2017.
  2. Mitre (1981 , pp. 166–167)
  3. Mitre (1981 , pp. 175–177)
  4. Mitre (1981 , p. 169)
  5. Mitre (1981 , p. 173)
  6. Contreras (1993 , p. 281)
  7. Johnson (1999 , p. 9)
  8. Contreras (1993 , pp. 281–282)
  9. 1 2 3 Contreras (1993 , p. 282)
  10. Rodríguez Ostria (2012, p. 17)
  11. Langer (1989 , pp. 139–142)
  12. Marsh (1928 , pp. 70–71)
  13. Marsh (1928 , p. 70)
  14. Bieber (1984 , p. 50)
  15. Blakemore (1990 , pp. 177–178)
  16. Dirección General de Obras Públicas (1930)
  17. Naciones Unidas (1951 , p. 345)
  18. World Bank (1972)
  19. 1 2 Aramayo Avila (1959)
  20. Limpias Ortiz (2009 , p. 46)
  21. Limpias Ortiz (2009 , pp. 32, 44–46)
  22. Zondag (1968 , p. 162)
  23. Zondag (1968 , p. 166)
  24. Blakemore (1990 , p. 263)
  25. 1 2 World Bank (1972)
  26. Limpias Ortiz (2009 , p. 36)
  27. CEPAL (1972 , p. 56)
  28. World Bank (1986)
  29. World Bank (1972 , p. 49)
  30. 1 2 Castro Bozo (2013)
  31. 1 2 3 4 5 Kogan (2004 , p. 47)
  32. Empresa Ferroviaria Andina S.A. (2015 , p. 18)
  33. Ferroviaria Oriental S.A. (2015 , p. 23)
  34. Empresa Ferroviaria Andina S.A. (2015 , p. 15)
  35. Ferroviaria Oriental S.A. (2015 , p. 26)
  36. Kogan (2004 , p. 45)
  37. "Recuperación del ferrocarril boliviano", La Patria (in Spanish), Oruro, 19 June 2017
  38. Jonathan O. (15 March 2014). "La trágica historia de ENFE". Archived from the original on 15 March 2014. Retrieved 19 June 2017.
  39. Kohon (2011 , p. 39)
  40. Kohon (2011 , p. 78)
  41. Cibilis (2006 , pp. 412–413)
  42. Asociación Latinoamericana de Ferrocarriles (ALAF) (19 June 2017). "Síntesis Estadística ALAF, 2011" (in Spanish).
  43. "Minera San Cristóbal, Ferrocarril". 26 October 2014. Archived from the original on 8 December 2015. Retrieved 19 June 2017.
  44. 1 2 Kohon (2011 , p. 48)
  45. "China pide estudio de construcción de tren interoceánico" (in Spanish). La Paz: La Razón. 19 June 2017.

Notes

  1. First 36 km to Salar El Carmen was built in December 1873 and then the line was extended to Salinas. The use of this route to transport merchandise not associated with the Antofagasta Salting and Railroad Company was a source of tension between the Bolivian government and the Company due to the government's fear that this railroad would compete with the projects it planned to carry out. Mayo (1979 , p. 79). See also Pérez Torrico (1994).

Bibliography

Further reading