JP Nagar 5th Phase metro station

Last updated

JP Nagar 5th Phase
General information
System
Namma metro icon.svg Namma Metro station
Owned by Bangalore Metro Rail Corporation Ltd (BMRCL)
Operated by Namma Metro
Line Orange Line
Platforms  Side platform
Platform-1 → JP Nagar 4th Phase
Platform-2 → Kempapura
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure type Elevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
ArchitectTBA
Other information
Status  Approved
Station code(TBC)
History
Opening2029;3 years' time (2029)(TBC)
Electrified750 V DC third rail (TBC)
Services
Preceding station Namma metro icon.svg Namma Metro Following station
Jaya Prakash Nagar
towards Kempapura
Orange Line
(Approved)
JP Nagar 4th Phase
Terminus
Location

JP Nagar5th Phase is an upcoming elevated metro station on the ORR-West corridor of the Orange Line of Namma Metro in Bengaluru, India. [1] [2]

Contents

History

The line was approved by the Union Cabinet on August 17, 2024 and is scheduled for completion in 2029. On 11th August 2025, Prime Minister Narendra Modi laid the foundation stone of Orange Line (Kempapura to JP Nagar 4th Phase) and Grey Line (Hosahalli to Kadabagere) after the inauguration of Yellow Line.

Station Layout

Orange Line Station Layout (TBC)

JP Nagar 5th Phase track layout
BSicon MASKa.svg
BSicon vCONTfgaq.svg
BSicon PLT-.svg
BSicon -STRq.svg
BSicon PLT-.svg
BSicon -STRq.svg
BSicon PLT-.svg
BSicon -STRq.svg
BSicon MASKa.svg
BSicon vCONTfgeq.svg
BSicon MASKa.svg
BSicon vCONTgfaq.svg
BSicon -STRq.svg
BSicon -STRq.svg
BSicon -STRq.svg
BSicon MASKa.svg
BSicon vCONTgfeq.svg
BSicon PLT-.svg
BSicon PLT-.svg
BSicon PLT-.svg
Station with two tracks and two side platforms
** Under Construction
GStreet levelExit/Entrance
L1MezzanineFare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Wheelchair symbol.svg
Platform #
Eastbound
Towards → JP Nagar 4th Phase
Change at the next station for Pink Line
Platform #
Westbound
Towards ← Kempapura
Next Station: Jaya Prakash Nagar
Change at the next station for Green Line
Side platform | Doors will open on the left Wheelchair symbol.svg
L2

References

  1. "1,092 trees to be axed from JP Nagar to Hebbal Kempapura". The Hans India. 14 October 2025.
  2. "Karnataka high court orders demolition of illegal building, recovery of costs from BBMP officials". The Times of India. 2 June 2025.