Grey Line (Namma Metro)

Last updated

Grey Line
Namma metro.svg
Overview
Other name(s)Hosahalli-Kadabagere Line
StatusApproved
OwnerBangalore Metro Rail Corporation Limited (BMRCL)
Locale Bangalore, Karnataka, India
Termini
  • Hosahalli
  • Kadabagere
Connecting linesOperational (1):
Purple Line
Upcoming (1):
Orange Line
Planned (1):
Inner Ring Line
Stations11(Elevated)
Website bmrc.co.in
Service
Type Metro
System Namma Metro
Depot(s)Magadi Road (TBD)
History
Planned opening2029;4 years' time (2029)
Technical
Line length42 km (26 mi)
Number of tracks2
Character Elevated (TBD)
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Electrification 750 V DC third rail
Grey Line Map

Contents

Blue Line to Krishnarajapura
or Central Silk Board
BSicon exhCONTg denim.svg
Blue Line Kempapura
BSicon exhINT-L denim.svg
BSicon exlINT-M.svg
BSicon exhKINTa-R orange.svg
Blue Line Under construction
Blue Line
Red Line
Hebbala
BSicon exhINT-L denim.svg
BSicon exhKINTa red.svg
BSicon exhKINTa-M red.svg
BSicon exhINT-R orange.svg
(Red Line - Proposed)
Blue Line towards KIAL Terminals
BSicon exhCONTgq denim.svg
BSicon exhSTRr denim.svg
BSicon exhSTRl red.svg
BSicon exhSTR orange.svg
BSicon exhSTRq red.svg
BSicon exhCONTfq red.svg
Nagashetty Halli
BSicon exhBHF orange.svg
BEL Circle
BSicon exhBHF orange.svg
Muthyalanagar
BSicon exhBHF orange.svg
Indian Railways Towards
Arrow Blue Left 001.svgTumakuru and Yesvantpur Jn Arrow Blue Right 001.svg
BSicon CONTgq.svg
BSicon exhSTR orange.svg
BSicon STRq.svg
BSicon CONTfq.svg
Green Line Peenya
BSicon fhCONTgq.svg
BSicon exhINT orange.svg
BSicon fhSTRq.svg
BSicon fhCONTfq.svg
Kanteerava Nagar
BSicon exhBHF orange.svg
BSicon hCONTgq violet.svg
BSicon exhKINTa grey.svg
BSicon hSTRq violet.svg
BSicon hCONTfq violet.svg
Hosahalli
Freedom Fighter's Colony
BSicon exhBHF orange.svg
BSicon exhBHF grey.svg
KHB Layout
Prem Nagar
BSicon exhBHF orange.svg
BSicon exhBHF grey.svg
Kamakshi Palya
BSicon exhSTR2 orange.svg
BSicon lhSTRc3.svg
BSicon exSTRc2 grey.svg
BSicon exSTRc3 orange.svg
BSicon lhSTRc2.svg
BSicon exhSTR3 grey.svg
BSicon lhSTRc2.svg
BSicon exSTRc1 orange.svg
BSicon exSTRc2 grey.svg
BSicon lhSTRc1.svg
BSicon exhINT2+4 orange.svg
BSicon exhINT3+1 grey.svg
BSicon lhSTRc4.svg
BSicon exSTRc3 orange.svg
BSicon exSTRc4 grey.svg
BSicon lhSTRc3.svg
Sumanahalli Cross
BSicon exhSTR+1 grey.svg
BSicon lhSTRc4.svg
BSicon exSTRc1 orange.svg
BSicon exSTRc4 grey.svg
BSicon lhSTRc1.svg
BSicon exhSTR+4 orange.svg
Anjana Nagar
BSicon exhBHF grey.svg
BSicon exhBHF orange.svg
Nagarbhavi BDA Complex
Aiga railtransportation 25.svgSunkadakatte Depot (U/C)
BSicon exhKDSTaq grey.svg
BSicon exhABZgr grey.svg
BSicon exhBHF orange.svg
Papireddy Palya
Herohalli
BSicon exhBHF grey.svg
BSicon exhBHF orange.svg
Vinayaka Layout
Byadarahalli
BSicon exhBHF grey.svg
BSicon exhBHF orange.svg
Nagarbhavi Circle
BSicon exhSTR grey.svg
BSicon CONTgq.svg
BSicon exhSTR orange.svg
BSicon STRq.svg
BSicon CONTfq.svg
Indian Railways Towards
Arrow Blue Left 001.svg Kengeri and KSR Bengaluru Arrow Blue Right 001.svg
Kamath Layout
BSicon exhBHF grey.svg
BSicon hCONTgq violet.svg
BSicon exhINT orange.svg
BSicon hSTRq violet.svg
BSicon hCONTfq violet.svg
Mysuru Road
Kadabagere
BSicon exhKBHFe grey.svg
BSicon exhBHF orange.svg
Dwaraka Nagar
BSicon exhBHF orange.svg
Hosakerehalli
BSicon exhBHF orange.svg
Kamakhya Bus Depot
BSicon exhBHF orange.svg
Kadirenahalli
BSicon fhCONTgq.svg
BSicon exhINT orange.svg
BSicon fhSTRq.svg
BSicon fhCONTfq.svg
Jaya Prakash Nagar
BSicon exhBHF orange.svg
JP Nagar 5th Phase
BSicon exhCONTgq pink.svg
BSicon exhKINTe orange.svg
BSicon exhSTRq pink.svg
BSicon exhCONTfq pink.svg
JP Nagar 4th Phase
Pink Line
Under construction
Legend:
BSicon STRq orange.svg
Kempapura ⇔ JP Nagar Phase 4 (Corridor-1)
BSicon STRq grey.svg
Sri Balagangadharanatha Swamiji Stn., Hosahalli ⇔ Kadabagere (Corridor-2)

The Grey Line or Hosahalli-Kadabagere-Tavarekere-Magadi Line is an upcoming metro line serving Bangalore as part of the Namma Metro network in the city. This metro line will serve the industrial areas, manufacturing units, Engineering and Textile Manufacturing Units on Magadi Road, providing connectivity to the Westren part of the city, [a] thereby improving last-mile connectivity to commercial centres, industrial hubs, educational institutions, and healthcare facilities. [1] [2] The line was approved by the Union Cabinet on August 17, 2024 and is scheduled for completion in 2029. [3] [4]

History

BMRCL began planning Namma Metro Phase-III in 2013, shortly after announcing Phase-II, which included the Yellow Line and Pink Line. Later in June 2013 BMRCL partnered with RITED Limited to conduct a pre-feasibility study for each proposed corridor

By 2016, BMRCL submitted its Phase-III proposal to the Ministry of Urban Development, which initially spanned 150.94 km. However, following the feasibility the network size was reduced to 102 km, with the remaining corridors being planned for Light Rail. The proposed lines were

However, in 2017 the Karnataka Government announced that the Silkboard - Hebbal line and the Nagavara - Airport line were merged to create the Blue Line and fast tracked to Phase 2A and Phase 2B.

In 2018 the Karnataka Government officially confirmed Phase III with several modifications. Multiple new lines were introduced while some others were dropped. Following another round of modifications in 2020, only two lines were finalized to be part of Phase-III

In July 2020, RITES Limited was assigned to prepare the Detailed Project Report (DPR) work for Phase-III. RITES submitted the DPR to the State Government who approved it in November 2022. The final approval was received from the Central Government in August 2024 paving the way for BMRCL to start land acquisition and tender notification.

Tendering

As of January 2025 BMRCL has issued tenders for Geotechnical Investigations and Detailed Design Consultancy (DDC). Once the Geotechnical Investigations are finished and finalized with the DDC BMRCL plans to release the Civil Work Tender.

Pre-Construction Activity
TenderingSectionActivitySuccessful Bid /CostContractorAward
Phase-3/GTI/2024/109/ Pkg-4Hosahalli to KadabagereGeotechnical Investigation1.54 crore (US$180,000)SECON23 Jul 2024
Phase-3/DDC3/RFP/2024/117Hosahalli Station to KadabagereDetailed Design ConsultantBidding Underway
EPDD-5Traction and Power SupplyDetailed Design ConsultantBidding Underway
Total1.54 crore (US$180,000)

Stations

Interchanges

Passenger interchange facilities, connecting to other metro and railway lines, are proposed at the following stations:

Grey Line
#Station NameConnectionsStation Layout
English Kannada
1 Hosahalli ಹೊಸಹಳ್ಳಿ Namma Metro Logo.png Purple Line Elevated
2K H B Colonyಕೆ ಎಚ್ ಬಿ ಕಾಲೋನಿElevated
3Vinayaka Nagaraವಿನಾಯಕ ನಗರElevated
4Sumanahalli Crossಸುಮನಹಳ್ಳಿ ಕ್ರಾಸ್ Namma Metro Logo.png Orange Line Elevated
5Sunkadakatteಸುಂಕದಕಟ್ಟೆElevated
6Herohalliಹೇರೋಹಳ್ಳಿElevated
7Byadarahalliಬ್ಯಾಡರಹಳ್ಳಿElevated
8Forest Gateಅರಣ್ಯ ದ್ವಾರElevated
9KadabagereಕಡಬಗೆರೆElevated

See also

Notes

  1. Outer Ring Road West Side, Magadi Road with its neighbouring areas

References

  1. "Union Cabinet approves Bengaluru's Namma Metro Orange Line". The Times of India. 17 August 2024. ISSN   0971-8257 . Retrieved 18 August 2024.
  2. ANI (17 August 2024). "Cabinet approves two corridors of Bangalore Metro Rail Project Phase-3". www.deccanchronicle.com. Retrieved 18 August 2024.
  3. "Bengaluru Namma Metro phase III expansion gets Union govt nod". The News Minute. 17 August 2024. Retrieved 18 August 2024.
  4. "BMRCL initiates land acquisition for Namma Metro Phase 3". The Hindu. 2 February 2025. ISSN   0971-751X . Retrieved 3 February 2025.