Janampet Barrage

Last updated
Janampet Barrage
India Telangana relief map.svg
Red pog.svg
Janampet Barrage at Pinapaka
India relief location map.jpg
Red pog.svg
Janampet Barrage (India)
Official nameJanampet Barrage
CountryIndia
LocationPinapaka mandal of Bhadradri Kothagudem district
Coordinates 18°06′11″N80°44′24″E / 18.10306°N 80.74000°E / 18.10306; 80.74000 Coordinates: 18°06′11″N80°44′24″E / 18.10306°N 80.74000°E / 18.10306; 80.74000
PurposeMulti-purpose
StatusProposed
Construction costProposed
Dam and spillways
Type of dam Barrage
Impounds Godavari River
Height67 meters
Length867.5 meters
Elevation at crest57 meters
Spillways 49 (41 River Sluices and 8 Under Sluices)
Spillway capacity73,630 Cumecs
Reservoir
CreatesJanampet Reservoir
Total capacity8.863 TMC
Active capacity8.828 TMC
Surface area6,327 hectares

Janampet Barrage [1] [2] [3] is a proposed barrage (dam) across Godavari River with full pond level (FPL) 67m. It would be located at Janampet village, Pinapaka, Bhadradri Kothagudem, India. This barrage was proposed as part of a proposal to link Godavari, Krishna, Penna and Cauvery rivers, which is part of Indian Rivers Interlinking Project.

History

As part of original alignment for Godavari - Krishna - Penna - Cauvery rivers linking, a dam was proposed as part of Icchampally Project, [4] Telangana with a large reservoir and hydroelectric project.

Post 2014, there have been major developments in between Sriram Sagar Project and Icchampally site in Telangana. A slew of irrigation projects - Sripada Yellampalli Project and Kaleshwaram Lift Irrigation Project (Parvati Barrage, Saraswati Barrage and Lakshmi Barrage) have come up due to which a large reservoir is no longer feasible as it would lead to submergence of at-least two barrages (Saraswati and Lakshmi barrages) and their associated pump-houses (Saraswati and Lakshmi Pump-houses) which form part of Kaleshwaram Lift Irrigation Project. The construction of Icchampally Project now will lead to wastful capital expenditure, spent as part of barrages and pump-houses under submergence. Only water pumps from pump-houses can be reused at another suitable location.

In 2019, [5] [6] Icchampally Project was revisited to evaluate feasibility of a dam with lowered height - referred to as Inchampalli Low Dam. This dam would have a full pond level (FPL) 95m, sill level 86m, and live storage capacity of 901 MCM (31.81 TMC). An FPL of 95m, would still lead to submergence of Lakshmi Barrage and its associated Lakshmi Pump-house as FPL is 6m above the crest level of Lakshmi Barrage. This dam with reduced height would only allow water transfer 298 TMC and this would be exhausted in the states of Telangana and Andhra Pradesh. It was found that water transfer to Tamil Nadu is not feasible through this route.

In lieu of Icchampally Project, a barrage was proposed at Janampet [1] in Telangana. A study was conducted to find feasibility to transfer water from Godavari to Krishna basin, via both Open Canal and Piped systems.

In February 2021, [7] [8] [9] Janampet barrage plans were shelved as Icchampally Project would benefit water stressed regions in Telangana as compared to Janampet barrage. As per Detailed Project Report,Inchampalli Low Dam with FPL of 87m will be constructed so as not to affect Kaleshwaram Lift Irrigation Project upstream and contain the submergence to river portion.

Related Research Articles

Nizam Sagar Dam in Kamareddy, Telangana, India

Nizam Sagar Dam is an Indian dam named after the Nizam of Hyderabad. It is a reservoir constructed across the Manjira River, a tributary of the Godavari River, between Achampet and BanjePally villages of the Kamareddy district in Telangana, India. It is located at about 144 km north-west of Hyderabad. Nizam Sagar is the oldest dam in the state of Telangana.

Sriram Sagar Project Dam in Nizamabad, Telangana, India

The Sriram Sagar Project is also known as the Pochampadu Project is an Indian flood-flow project on the Godavari. The Project is located in Nizamabad district, 3 km away from National Highway 44. It has been described by The Hindu as a "lifeline for a large part of Telangana".

Nagarjuna Sagar Dam Dam in Guntur district, Andhra Pradesh and Nalgonda district, Telangana

Nagarjuna Sagar Dam is a masonry dam across the Krishna River at Nagarjuna Sagar which straddles the border between Nalgonda district in Telangana and Guntur district in Andhra Pradesh. .The dam provides irrigation water to the Nalgonda, Suryapet, Krishna, Khammam, West Godavari, Guntur, and Prakasam districts along with electricity generation.

Indian rivers interlinking project Project to interlink rivers of India

The Indian Rivers Inter-link is a proposed large-scale civil engineering project that aims to effectively manage water resources in India by linking Indian rivers by a network of reservoirs and canals to enhance irrigation and groundwater recharge, reduce persistent floods in some parts and water shortages in other parts of India. India accounts for 18% of the world population and about 4% of the world’s water resources. One of the solutions to solve the country’s water woes is to link rivers and lakes.

Polavaram Project Dam in Polavaram, West Godavari district, Andhra Pradesh

The Polavaram Project is an under construction multi-purpose irrigation project on the Godavari River in the West Godavari District and East Godavari District in Andhra Pradesh. The project has been accorded National project status by the Union Government of India. Its reservoir back water spreads up to the Dummugudem Anicut and approx 115 km on Sabari River side. Thus back water spreads into parts of Chhattisgarh and Odisha States. It gives major boost to tourism sector in Godavari Districts as the reservoir covers the famous Papikonda National Park, Polavaram hydro electric project (HEP) and National Waterway 4 are under construction on left side of the river. It is located 40 km to the upstream of Sir Arthur Cotton Barrage in Rajamahendravaram City and 25 km from Rajahmundry Airport.

The Pranahita Chevella Lift Irrigation Project is a lift irrigation project to harness the water of Pranhita tributary of Godavari river for use in the Telangana state of India. The river water diversion barrage across the Pranahita river is located at Thammidihatti village in Komaram Bheem district of Telangana. This lift canal is an inter river basin transfer link by feeding Godavari river water to Krishna river basin. The chief ministers of Telangana and Maharashtra states reached an agreement in 2016 to limit the full reservoir level (FRL) of the barrage at 148 m msl with 1.85 tmcft storage capacity. In the year 2016, this project is divided into two parts. The scheme with diversion canal from the Thammmidihatti barrage to connect to existing Yellampalli reservoir across the Godavari river is presently called Pranahita barrage lift irrigation project. This scheme is confined to providing irrigation facility to nearly 2,00,000 acres in Adilabad district using 44 tmcft water.

Pulichinthala Project Dam in Pulichintala village, Bellamkonda, Guntur district, Andhra Pradesh"`UNIQ--ref-00000010-QINU`"

Pulichintala Project is a multipurpose project serving irrigation needs, hydro power generation and flood control. It is a crucial irrigation facility for farmers of four coastal districts of West Godavari, Krishna, Guntur and Prakasam where irrigation facility for 13 lakh acres. It has 24 gates in all with balancing reservoir with a capacity of 46 tmcft at 175 feet (53 m) MSL full reservoir level (FRL). The project started impounding the water in August 2014. The cost of the project has exceeded Rs.1850 crores.

Sripada Yellampalli Project Dam in Yellampalli (village), mancherial

Sripada Yellampalli Project is an irrigation project located at Yellampalli Village, Ramagundam Rural Mandal, between Peddapalli district - Mancherial District in Telangana State, India. The project is fourth largest on the Godavari River in Telangana region. It is named after late legislator, D. Sripada Rao.

Rajiv Dummugudem Lift Irrigation Scheme

Rajiv Dummugudem Lift Irrigation Scheme is a lift irrigation scheme under execution which are located near Dummugudem, Khammam district in Telangana, India. There are three lift irrigation schemes by names Rajiv Dummugudem lift irrigation scheme, Indirasagar Rudrammakota Dummugudem lift irrigation scheme and Dummugudem to Sagar tail pond canal project. Rajiv Dummugudem lift irrigation scheme starting at 17°54′05″N80°52′45″E is planned to supply irrigation water for 200,000 acres in Khammam and Warangal districts drawing Godavari River water from the Dummugudem pond. Indira Dummugudem lift irrigation scheme starting at 17°33′49″N81°14′49″E is planned to supply irrigation water for 200,000 acres in Khammam, Krishna and West Godavari districts drawing Godavari River water from the back waters of Polavaram reservoir.

Icchampally Project Dam in Karimnagar district, Telangana

Icchampally Project was a multi-purpose project proposed in 2008, with hydro electricity generation, irrigation, flood control, etc. benefits on the River Godavari in India. This project is proposed as joint project of Telangana, Maharashtra and Chhattisgarh states.

Nagarjuna Sagar tail pond

Nagarjuna Sagar tail pond is a multipurpose reservoir located 21 km downstream from the Nagarjuna Sagar Dam across the Krishna River near Satrasala in Nalgonda district, India. Its gross water storage capacity is 6 Tmcft. The reservoir water spread area extends up to the toe of the Nagarjuna Sagar dam. The project was completed by July 2014.

Lakshmi Barrage Dam in Medigadda (village), Mahadevpur Telangana

The Lakshmi Barrage, also known as the Medigadda Barrage is the starting point of the proposed Kaleshwaram Project which envisages construction of three barrages between Yellampally & Medigadda. Its objective is to utilize Godavari water for drinking and irrigation. The Barrage/Project site is located at Medigadda Village, Mahadevpur Mandal, Jayashankar Bhupalpally district in Telangana State, India.

Saraswati Barrage Dam in Annaram (village), Mahadevpur Telangana

The Saraswati Barrage, also known as the Annaram Barrage is an irrigation project on Godavari River located at Annaram Village, Mahadevpur Mandal, Jayashankar Bhupalpally district in Telangana State, India.

Pattiseema Lift Irrigation Project Dam in Between Godavari River and Polavaram Project

Pattiseema Lift Irrigation Project is a river interlinking project which connects Godavari River to Krishna River. This project has thereby become the first of such irrigation type projects in the country to be completed in time without any budget enhancements. It also holds a record in Limca Book of Records. The project was Inaugurated by the Chief Minister of Andhra Pradesh Nara Chandrababu Naidu in March 2016 while the project was completed in one year record of time.

Kaleshwaram Lift Irrigation Project Dam in Kaleshwaram, Bhupalpally, Telangana, India

The Kaleshwaram Lift Irrigation Project (KLIP) is a multi-purpose irrigation project on the Godavari River in Kaleshwaram, Bhupalpally, Telangana, India. Currently the world's largest multi-stage lift irrigation project, its farthest upstream influence is at the confluence of the Pranhita and Godavari rivers. The Pranahita River is itself a confluence of various smaller tributaries including the Wardha, Painganga, and Wainganga rivers which combine to form the seventh-largest drainage basin on the subcontinent, with an estimated annual discharge of more than 6,427,900 acre-feet or 280 TMC. It remains untapped as its course is principally through dense forests and other ecologically sensitive zones such as wildlife sanctuaries.

Vykuntapuram Barrage is an Indian barrage and water storage project. It is under construction on Krishna River 23 kilometers upstream of existing Prakasam Barrage with FRL 25M. It is designed to store 10 TMC of flood water coming from the Vyra and Munneru rivers. The backwater of this dam will extend beyond Pokkunuru to the toe of Pulichintala dam. Andhra Pradesh Chief Minister Nara chandrababu Naidu laid the foundation stone for this project on 13 February 2019.

Tummidihetti Barrage Dam in Tummidihetti village, Koutala mandal, Adilabad district, Telangana

Tummidihetti Barrage is a proposed barrage across Pranhita River, a tributary of Godavari River at Tummidihetti village, Koutala mandal, Adilabad district of Telangana State. The project will provide irrigation facilities for an ayacut of 2,00,000 acres in drought prone areas in East Adilabad District of Telangana State..

Sammakka Barrage Dam in Thupakulagudem village, Eturnagaram mandal, Mulugu district, Telangana

Sammakka Barrage is a barrage across Godavari River at Thupakulagudem village, Eturnagaram mandal, Mulugu district of Telangana State. It stabilises the existing irrigated area of 2,51,310 Hectare under J. Chokka Rao Devadula Lift Irrigation Scheme and 3,04,000 hectares of Sriram Sagar Project stages I & II with 50 TMC of water. Another 50 TMC will be used for providing drinking water to villages en route.

Sadarmat Barrage Dam in Ponkal village, Mamda mandal, Nirmal district, Telangana

Sadarmat Barrage is an under-construction barrage across Godavari River at Ponkal village, Mamda mandal, Nirmal district of Telangana State. This barrage is situated 32 km downstream of Sriram Sagar Project, on the Godavari river and about 7 km upstream of Sadarmat Anicut. The project will provide irrigation facilities for an ayacut of 20,000 acres in Nirmal district of Telangana State.

Jogulamba Barrage Dam in Peddamandadi mandal of Wanaparthy district

Jogulamba Barrage is a proposed barrage across Krishna River with full pond level (FPL) 274m. It would be located at Veltoor village, Peddamandadi mandal, Wanaparthy district, Telangana, India. This barrage is proposed to divert 3 TMC of water via lift to Yedula Reservoir being built as part of Palamuru-Ranga Reddy Lift Irrigation Project. This would also provide water for Dindi Lift Irrigation Project and Mahatma Gandhi Kalwakurthy Lift Irrigation Scheme.

References

  1. 1 2 "Godavari Inchampalli Janampet Cauvery Grand Anicut Link Project". National Water Development Agency.
  2. Ramakrishnan, T. (2020-03-05). "State's outreach to neighbours raises river-linking expectations". The Hindu. ISSN   0971-751X . Retrieved 2021-04-30.
  3. India, The Hans (2020-09-18). "Southern States' meet on water dispute today". www.thehansindia.com. Retrieved 2021-05-04.
  4. "Feasibility Report of Godavari Inchampalli Krishna Nagarjunasagar Link Project :: National Water Development Agency". www.nwda.gov.in. Retrieved 2021-04-21.
  5. "13th Meeting of Sub-Committee for System Studies, National Water Development Authority". National Water Development Authority.
  6. "Will Centre involve Telangana, Andhra Pradesh on diverting Godavari waters to Krishna at Nagarjuna Sagar?". The New Indian Express. Retrieved 2021-05-04.
  7. Chandrashekhar, B. (2021-02-26). "Task force on river-linking okays Mahandadi-Godavari link". The Hindu. ISSN   0971-751X . Retrieved 2021-04-21.
  8. "ఇచ్చంపల్లి నుంచే 'అనుసంధానం'!". Sakshi (in Telugu). 2021-03-31. Retrieved 2021-05-04.
  9. "గోదావరి-కావేరి అనుసంధానంలో పైప్‌లైన్‌ లేదు". www.andhrajyothy.com. Retrieved 2021-05-04.