Sita Rama Lift Irrigation Project | |
---|---|
Official name | Sita Rama Lift Irrigation Project |
Country | India |
Location | Dummugudem, Bhadradri Kothagudem District |
Coordinates | 17°52′18″N80°53′09″E / 17.87167°N 80.88583°E |
Purpose | Multi-purpose |
Status | Under construction |
Construction cost | 2,500–5,000 crores [1] |
Built by | Larsen & Toubro [2] |
Owner(s) | Government of Telangana |
Operator(s) | Irrigation & CAD Department, Government of Telangana |
Dam and spillways | |
Type of dam | Barrage |
Impounds | Godavari River |
Height | 68 meters |
Height (foundation) | 20 meters |
Length | 1,263 meters (Overflow section) | 109.75 meters (Non-overflow section - 50 meters on Left and 59.7 meters on Right) |
Spillways | 52 Nos, 15.0m x 15.0M (Radial) and 13 Nos.,15.0M x 16.0M |
Spillway capacity | 88,614 Cumecs |
Reservoir | |
Creates | Sita Rama Lift Irrigation Project |
Total capacity | 36.576 tmcft |
Catchment area | 2,81,000 km2 |
Sita Rama Lift Irrigation Project | |
Operator(s) | Telangana State Power Generation Corporation Limited |
Commission date | Planned |
Type | Barrage |
Hydraulic head | 16.50m (Gross head)/ 14.85 (Net head) |
Turbines | 8x40MW |
Installed capacity | 320 MW |
Annual generation | 1016.88 MU (at 50% dependability) |
Sita Rama Lift Irrigation Project [3] [4] [5] is an under-construction barrage across Godavari River with run-of-river hydroelectric power project at Dummugudem village, Bhadradri Kothagudem district in Telangana. The project is proposed at about 200 meters downstream of the existing Dummugudem anicut built about 150 years ago.
Prior to Bifurcation of Andhra Pradesh, two project namely Rajiv Dummugudem Lift Irrigation Scheme and Indira Sagar Rudram Kota Lift Irrigation Scheme were proposed in order to cater to the irrigation needs of the left out ayacut from existing irrigation schemes. Even after execution of this scheme, about 2.55 Lakh Acres would still remain to be covered by any future irrigation scheme. After bifurcation of Andhra Pradesh, seven Mandals of Khammam district were merged in West Godavari district of Andhra Pradesh. In this process the intake structure of proposed Indira Sagar Lift Irrigation Scheme went into the administrative boundary of Andhra Pradesh.
In view of above, Government of Telangana decided not only to integrate earlier proposed Indira Sagar and Rajiv Sagar Lift Irrigation Scheme into one lift irrigation scheme but also to cover the Gap Ayacut which is not coming under any present or future irrigation scheme. Accordingly, the project is now renamed as Sita Rama Lift Irrigation Scheme [6] is being formulated to cover about 9.36 Lakh Acres of Khammam, Bhadradri Kothagudem and Mahabubabad Districts of Telangana. The project has been planned to execute in two phases. Phase – I of the Sita Rama Lift Irrigation Scheme will cover the Khammam, Bhadradri Kothagudem & Mahabubabad Districts whereas Phase – II will also cover the same districts. Phase – I of this scheme covers command area of 2,72,921 Ha with new ayacut of about 1,33,085 Ha and Stabilization of about 1,39,836 Ha.
Dummugudem Anicut is a 150-year-old masonry weir built across river Godavari near Dummugudem village in Badradri Kothagudem district of Telangana state. Keeping in mind the requirements of Sita Rama LIS, the State Government of Telangana has contemplated to augment the storage capacity and develop a run-of-river hydroelectric project by constructing a barrage across river Godavari at about 200 meters downstream of the existing Dummugudem anicut with pond level at 63.00m elevation.
The barrage is nearby to the temple town of Bhadrachalam where Sita Ramachandraswamy Temple is present. The temple is often referred to as Dakshina Ayodhya, Bhadradri or Bhadrachalam and is dedicated to Hindu god, Rama. The barrage is named after consort of Rama, Sita.
Sita Rama Lift Irrigation Project will be constructed on the right side of the barrage and will have an installed capacity of 320 MW (8x40MW Bulb Turbine units). The project will generate 719.12 MU in a 90% dependable year, 765.04 MU in a 75% dependable year and 1016.88 MU in a 50% dependable year and around 999.48 MU per year on an average basis.
Parnasala is a village in the Dummugudem mandal in the newly formed Bhadradri Kothagudem district of Telangana, India. The village is accessible by road and boats and is situated 32 km from the temple town of Bhadrachalam.
Bhadrachalam is a census town in Bhadradri Kothagudem district in the Indian state of Telangana. It is an important Hindu pilgrimage town with the Bhadrachalam Temple of Rama, situated on the banks of Godavari River. It is located 312 kilometres (194 mi) east of state capital, Hyderabad,115 kilometres (71 mi) from Khammam,178 kilometres (111 mi) from Suryapet,180 kilometres (112 mi) from Warangal,187 kilometres (116 mi) from Vijayawada,220 kilometres (137 mi) and 350 kilometres (217 mi) from Visakhapatnam.
Kothagudem is a city in Telangana. It serves as the headquarters of the Bhadradri Kothagudem district of the Indian state of Telangana. It was a portion of large Zamindari estate known as Husanabad Shankaragiri or Palvancha Zamindari in the Nizam's Dominion. Estate name was given by Captain Glasfurd. The Zamindar of Bhadrachalam was Zamindar of Palvancha also.
The Godavari River has its catchment area in seven states of India: Maharashtra, Telangana, Chhattisgarh, Madhya Pradesh, Andhra Pradesh, Karnataka and Odisha. The number of dams constructed in Godavari basin is the highest among all the river basins in India. Nearly 350 major and medium dams and barrages had been constructed in the river basin by the year 2012.
Nizam Sagar Dam is an Indian dam named after the Nizam of Hyderabad. It is a reservoir constructed across the Manjira River, a tributary of the Godavari River, between Achampet and BanjePally villages of the Kamareddy district in Telangana, India. It is located at about 144 km (89 mi) north-west of Hyderabad. Nizam Sagar is the oldest dam in the state of Telangana.
Khammam district is a district in the eastern region of the Indian state of Telangana. The city of Khammam is the district headquarters. The district shares boundaries with Suryapet, Mahabubabad, Bhadradri districts and with Eluru and NTR districts.
Nagarjuna Sagar Dam is a masonry dam across the Krishna River at Nagarjuna Sagar which straddles the border between Palnadu district in Andhra Pradesh and Nalgonda district in Telangana. The dam provides irrigation water to the districts of Krishna, Guntur, Palnadu, Prakasam and parts of West Godavari districts of Andhra Pradesh and also Nalgonda, Suryapet, Khammam, Bhadradri Kothagudem districts of Telangana. It is also a source of electricity generation for the national grid.
Palvancha is a town in Bhadradri district of the Indian state of Telangana. It is located in Palvancha mandal of Kothagudem revenue division.
Jalayagnam or Jala Yagnam,, is a water management program in India. It has been implemented by Chief Minister of Andhra Pradesh, India, Dr. Y. S. Rajasekhara Reddy as an election promise to the farmers of the state to bring 8.2 million acres under irrigation in five years. Y.S.R has taken required approvals from central government and NGTL. Also other required permissions for all the projects before he died. Like Site clearance, environmental clearance, R & R clearance, wildlife sanctuary clearance, forest clearance and technical advisory committee clearance. By the time he supposed to execute projects on phase manner, Y.S.R died in accident. Subsequently there was other issues like state bifurcation came to high intensity, subsequent Chief Ministers failed to give priority for Jalayagnam.
Dummugudem is a village in Bhadradri Kothagudem district of the Indian state of Telangana. It is located in Dummugudem mandal of Bhadrachalam revenue division.
The Polavaram Project is an under construction multi-purpose irrigation project on the Godavari River in the Eluru District and East Godavari District in Andhra Pradesh. The project has been accorded National project status by the Central Government of India. Its reservoir back water spreads up to the Dummugudem Anicut and approx 115 km on Sabari River side. Thus back water spreads into parts of Chhattisgarh and Odisha States. It gives major boost to tourism sector in Godavari Districts as the reservoir covers the famous Papikonda National Park, Polavaram hydro electric project (HEP) and National Waterway 4 are under construction on left side of the river. It is located 40 km to the upstream of Sir Arthur Cotton Barrage in Rajamahendravaram City and 25 km from Rajahmundry Airport.
The Pranahita Chevella Lift Irrigation Project is a lift irrigation project to harness the water of Pranahita tributary of Godavari River for use in the Telangana state of India. The river water diversion barrage across the Pranahita River is located at Thammidihatti village in Komaram Bheem district of Telangana. This lift canal is an inter river basin transfer link by feeding Godavari River water to Krishna River basin. The chief ministers of Telangana and Maharashtra states reached an agreement in 2016 to limit the full reservoir level (FRL) of the barrage at 148 m msl with 1.85 tmcft storage capacity. In the year 2016, this project is divided into two parts. The scheme with diversion canal from the Thammmidihatti barrage to connect to existing Yellampalli reservoir across the Godavari River is presently called Pranahita barrage lift irrigation project. This scheme is confined to providing irrigation facility to nearly 2,00,000 acres in Adilabad district using 44 tmcft water.
Rajiv Dummugudem Lift Irrigation Scheme is a lift irrigation scheme under execution which are located near Dummugudem, Khammam district in Telangana, India. There are three lift irrigation schemes by names Rajiv Dummugudem lift irrigation scheme, Indirasagar Rudrammakota Dummugudem lift irrigation scheme and Dummugudem to Sagar tail pond canal project. Rajiv Dummugudem lift irrigation scheme starting at 17°54′05″N80°52′45″E is planned to supply irrigation water for 200,000 acres in Khammam and Warangal districts drawing Godavari River water from the Dummugudem pond. Indira Dummugudem lift irrigation scheme starting at 17°33′49″N81°14′49″E is planned to supply irrigation water for 200,000 acres in Khammam, Krishna and West Godavari districts drawing Godavari River water from the back waters of Polavaram reservoir.
Bhadrachalam revenue division is an administrative division in the Bhadradri Kothagudem of the Indian state of Telangana. It is one of the 2 revenue divisions in the district which consists of 8 mandals under its administration. Bhadrachalam is the divisional headquarters of the division. The Bhadrachalam Revenue Division was originally part of East Godavari district of Andhra Pradesh up to 1959, after which it was merged through GO No. 553 on 17 Nov 1959 into Khammam district. Ashwaraopeta was also part of West Godavari district up to 1959. It was merged in Telangana region after the formation of Andhra Pradesh State with 29 states. In 2014, it was re-merged in Andhra Pradesh State with 13 districts, after the formation of Telangana state for the completion of Polavaram dam project.
Nagarjuna Sagar tail pond is a multipurpose reservoir located 21 km downstream from the Nagarjuna Sagar Dam across the Krishna River near Satrasala in Nalgonda district, India. Its gross water storage capacity is 6 Tmcft. The reservoir water spread area extends up to the toe of the Nagarjuna Sagar dam. The project was completed by July 2014.
Taliperu Project also known as Taliperu Reservoir is a medium irrigation project constructed across the Taliperu River, a tributary of Godavari River, located at Cherla Village and Mandal, Khammam District, Telangana. This project utilizes about 5.0 TMC of water and creates 24,500 acres (9,900 ha) of Ayacut in both Cherla and Dummugudem Mandals, Khammam District.
Bhadradri Kothagudem is a district in the east of the Indian state of Telangana. Kothagudem is the district headquarters. It is the largest district in Telangana, with an area of 7483 km2. It borders the districts Khammam, Mahabubabad, Mulugu, Eluru and East Godavari, and shares a boundary with the bordering states Chhattisgarh and Andhra Pradesh. The district comprises 24 mandals and 2 revenue divisions, Kothagudem and Bhadrachalam.
Sadarmat Barrage is an under-construction barrage across Godavari River at Ponkal village, Mamda mandal, Nirmal district of Telangana State. This barrage is situated 32 km downstream of Sriram Sagar Project, on the Godavari river and about 7 km upstream of Sadarmat Anicut. The project will provide irrigation facilities for an ayacut of 20,000 acres in Nirmal district of Telangana State.
Janampet Barrage is a proposed barrage (dam) across Godavari River with full pond level (FPL) 67m. It would be located at Janampet village, Pinapaka, Bhadradri Kothagudem, India. This barrage was proposed as part of a proposal to link Godavari, Krishna, Penna and Cauvery rivers, which is part of Indian Rivers Interlinking Project.
{{cite news}}
: CS1 maint: numeric names: authors list (link)