StatusCompleted/Inaugurated
Construction began2016
Opening date21 June 2019
Construction cost₹ 80000 crores [1]
Operator(s)Telangana Irrigation Department
Dam and spillways
Impounds Godavari River
Heightup to top of earth dam above the lowest river bed.
Spillway type Chute spillway
Website
https://www.kaleshwaramproject.com/

The Kaleshwaram Lift Irrigation Project (KLIP) is a multi-purpose irrigation project on the Godavari River in Kaleshwaram, Bhupalpally, Telangana, India. [2] Currently the world's largest multi-stage lift irrigation project, [3] its farthest upstream influence is at the confluence of the Pranahita and Godavari rivers. The Pranahita River is itself a confluence of various smaller tributaries including the Wardha, Painganga, and Wainganga rivers which combine to form the seventh-largest drainage basin on the subcontinent, with an estimated annual discharge of more than 6,427,900 acre-feet (7,930 cubic hectometres ) or 280 TMC. It remains untapped as its course is principally through dense forests and other ecologically sensitive zones such as wildlife sanctuaries.

Contents

The Kaleshwaram Lift Irrigation Project [4] [5] is divided into 7 links and 28 packages spanning a distance of approximately 500  km (310  mi ) through 13 districts and utilizing a canal network of more than 1,800 km (1,100 mi). [6] The project aims to produce a total of 240 TMC (195 from Medigadda Barrage, 20 from Sripada Yellampalli project and 25 from groundwater), of which 169 has been allocated for irrigation, 30 for Hyderabad municipal water, 16 for miscellaneous industrial uses and 10 for drinking water in nearby villages, with the remainder being estimated evaporation loss. The project aims at increasing total culturable command area (the sustainable area which can be irrigated after accounting for both upstream and downstream factors) by 1,825,000 acre⋅ft (2,251 hm3) across all 13 districts in addition to stabilizing the existing CCA.

On 21 June 2019, the project was opened by Telangana Governor E. S. L. Narasimhan and Chief minister K. Chandrashekar Rao. National Green Tribunal declared the Scheme is constructed without following the statuary provisions with regard to environmental aspects. [7]

Four major pumping facilities manage the project's outflow, the largest at Ramadugu (Medaram, Annaram and Sundilla being the others) is also likely to be the largest in Asia once consistent measurements are available, [8] requiring seven 140  MWh (500  GJ ) pumps designed and manufactured specifically for the project by the BHEL. [9] The Engineering giant Megha Engineering and Infrastructures Limited built 15 of 22 Pump houses and undertook major part of the project.

Project details

In addition to constructing new reservoirs, Kaleshwaram also rejuvenates existing ones. [10]

Existing reservoirs

ReservoirLocationCapacity

(in Tmcft)

Sripada Yellampalli project Yellampalli village 20.175
Mid Manair Dam 25.875
Upper Manair Dam 2.20
Kaddam Project 7.60
Masani Tank0.13
Total55.98

New reservoirs

ReservoirLocationCapacity

(in Tmcft)

FRL(in m)
Medigadda Barrage 16.17100.0
Annaram Barrage Annaram 10.87120.0
Sundilla Barrage 8.83130.0
Medaram Online storage Medaram 0.78
Ananthagiri Online storage Ananthagiri 3.50
Sri Ranganayaka Sagar Imambad (chandlapur) 3.50
Sri Komaravelli Mallanna SagarTadkapally50.00
Malkapet Online storage3.0
Konda Pochamma Online storagePamulaparthy15.00
Amarlabanda Online storage5.00
Katchapur2.50
Thimmakka Palli3.00
Issaipet2.50
Bhoompally Online storage9.0
Gujjal Online storage1.50
Katewadi Online storage5.00
Mothe Online storage2.90
Kondem Cheruvu3.50
Gandamalla Online storage9.87
Baswapuram Online storage11.39
TOTAL147.710

Total: 1,65,700 acres (New ayacut) Apart from: 1,875,00+ acres (Stabilisation of existing ayacut)[ clarification needed ]

Gravity Canals & Tunnels for distribution

1. Gravity Canal - 1,531 km

2. Gravity Tunnel - 203 km

3. Pressure Mains / Delivery Mains - 98 km

Link-I: From Medigadda Barrage on Godavari River to Sripada Yellampalli Project

Water will be reverse pumped from the confluence point of Godavari and Pranahita Rivers to Sripada Yellampalli Project with the help of 3 barrages (Medigadda, Annaram and Sundilla) and 3 lifts.

As of June 2019, lifts are being commissioned with provision to lift 2 TMC (56,63,36,93,184 liters)[ clarification needed ] of water per day from Medigadda. The water is lifted to backwaters of Annaram barrage. Again from Annaram barrage to Sundilla barrage. Finally from Sundilla to Sripada Yellampalli Project. Civil works are being executed to lift 3 TMC per day but pumps are being installed to lift only 2 TMC. If need be, only pumps would need to be installed to increase capacity by one more TMC.

Link-II: From Sripada Yellampalli Project to Mid Manair Dam

A new balancing reservoir is also being proposed in the outskirts of Hyderabad of 20–30 TMC to store water. The water will be supplied to this balancing reservoir in the same link.

Link-V: From Anicut to Chityala

From Anicut, a series of gravity canals and a small tunnel of 1.2 km are planned to transfer water to Gandamalla Reservoir and Baswapuram Reservoir. Thereafter, gravity canals are planned towards Chityal Mandal and its villages.

Link-VI: From Sri Komaravelli Mallanna Sagar to Singur Dam

From Sri Komaravelli Mallanna Sagar, another sequence of gravity canals, tunnels and lifts are used to transfer water to Singur Dam. Apart from that, if need be, water can be transferred to Nizam Sagar Project and from there, to SRSP.

Link-VII: From SRSP Foreshore to Nizam Sagar Canals and to Dilwarpur and Hangarga village for Nirmal and Mudhole Constituency

From the foreshore waters of SRSP, water will be transferred to reservoirs at Hangarga and Dilwapur villages. Apart from this, existing reservoirs like Masani Tank and kondem Cheruvu will also be linked. Canals under Nizam Sagar will also be irrigated.

Water lifting

The chief minister has said that every year about 400 TMC of water will be lifted. On the contrary, over the past 5 years, only about 150 TMC of water has been lifted and out of this 100 TMC was released back in to Godavari. Therefore on an average only about 10 TMC of water is lifted per year. Every year water lifting is usually started in late June and July, and few TMC is lifted to the several barrages. However, in July projects get sufficient rain water, that necessitates releasing the lifted water back in to Godavari. Over the past 5 years, lifting and releasing back is a recurrent phenomenon that calls for an intelligent water lifting plan. On the other hand, 10 TMC of water lifting per year is quite low and does not justify the huge amount of money spent. For example, with 10 TMC of water, 1 lakh acres could be irrigated. The annual expenditure for the project is estimated to be beyond Rs. 20,000 crore per year. This implies that per acre annual expenditure is 20 lakh, which is astronomically high. Such very poor cost benefit ratios make the project a financial disaster for the state.

Project Economics

The project requires about 5,900 MW of electricity to run its several large water pumps. Assuming, on average, the pumps require constant running for two months during the monsoon period, 24 hours a day, the total electricity consumption would be 849 crore units. Taking a unit electricity charge of Rs. 8.0 per kWh, the annual electricity cost is going to be Rs. 7000 crores per year. Assuming the project irrigates about 15 lakh acres, the electricity cost for irrigation is about Rs. 46,666 per acre per year. The chief minister has said that the project requires about Rs. 5000 crore annually for electricity charges. [11] On the other hand, the state irrigation department had allocated Rs.7000 crores for electricity charges in its 2020 budget. [12]

The project was mainly funded with the money obtained through loans. Assuming an existing loan of Rs. 80,000 crore, at an interest rate of 6% that needs to paid up over a period of 30 years, the annual loan repayment charge is about Rs. 5760 crores per year. This implies an additional charge of Rs. 38,400 per acre per year towards the loan repayment. Therefore, the total cost of irrigation per acre is approximately Rs. 85,000 per acre per year. On the other hand, the net profit from the cultivation of the main crop i.e., paddy, could be expected to be around Rs.40,000 per acre per year, [12] assuming two crops in a year. These numbers raise questions about the financial viability of the project.

A recent report by the comptroller and auditor general of India (CAG) has pointed out that the cost to benefit ratio of the project is 1:0.75 in contrast to the state govt.'s claim of 1:1.5. [13] In addition, by taking in to account the escalated costs for lifting the third TMC, the ratio comes down to 1:0.52. According to the report, the annual operational costs for irrigating an acre of land is Rs. 46,364 cr. The annual electricity costs are estimated to be Rs. 10,374 cr. Despite the negative report by CAG on the financial viability, the state govt. has made no effort refute the report.

Project Execution

Indian Public sector Enterprise BHEL is executing this project and has already commissioned 16 pumping units. [14] [15]

Environmental law violations

In October 2020, the National Green Tribunal, India's court for environmental issues, directed the Telangana government to halt work on the KLIP except the drinking water supply component. A petition had been filed by a farmer from Siddipet district, whose land was affected by the KLIP. The National Green Tribunal found, on hearing his petition, that the environmental clearances for the KLIP had not been obtained before the project, as is required by law, but had been granted by the Union Government of India after work on the project had already begun by the Telangana government. The National Green Tribunal has directed the Indian government's Ministry of Environment, Forests and Climate Change to constitute a committee to investigate the illegally granted clearances, and to file a report with them within six months. [16] [17] [18] .

Kaleshwaram Lift Irrigation Project Details PDF.

See also

Related Research Articles

<span class="mw-page-title-main">Sriram Sagar Project</span> Dam in Telangana, India

The Sriram Sagar Project is also known as the Pochampadu Project is an Indian flood-flow project on the Godavari. The Project is located in Nizamabad district, 3 km away from National Highway 44. It has been described by The Hindu as a "lifeline for a large part of Telangana".

<span class="mw-page-title-main">Nagarjuna Sagar Dam</span> Dam in Andhra Pradesh & Nalgonda district, Telangana

Nagarjuna Sagar Dam is a masonry dam across the Krishna River at Nagarjuna Sagar which straddles the border between Palnadu district in Andhra Pradesh and Nalgonda district in Telangana. The dam provides irrigation water to the districts of Palnadu, Guntur, Nalgonda, Prakasam, Khammam, Krishna, and parts of West Godavari. It is also a source of electricity generation for the national grid.

The Babli project / barrage is a controversial reservoir project being constructed by Maharashtra across the river Godavari, disputed by Telangana. The Supreme Court of India delivered a ruling after seven years in favour of Maharashtra with the Andhra Pradesh government expected to appeal against it.

The Pranahita Chevella Lift Irrigation Project is a lift irrigation project to harness the water of Pranahita tributary of Godavari river for use in the Telangana state of India. The river water diversion barrage across the Pranahita river is located at Thammidihatti village in Komaram Bheem district of Telangana. This lift canal is an inter river basin transfer link by feeding Godavari river water to Krishna river basin. The chief ministers of Telangana and Maharashtra states reached an agreement in 2016 to limit the full reservoir level (FRL) of the barrage at 148 m msl with 1.85 tmcft storage capacity. In the year 2016, this project is divided into two parts. The scheme with diversion canal from the Thammmidihatti barrage to connect to existing Yellampalli reservoir across the Godavari river is presently called Pranahita barrage lift irrigation project. This scheme is confined to providing irrigation facility to nearly 2,00,000 acres in Adilabad district using 44 tmcft water.

<span class="mw-page-title-main">Sripada Yellampalli Project</span> Irrigation project in South India

Sripada Yellampalli Project is an Irrigation project located at Yellampalli Village of Ramagundam rural Mandal, between Peddapalli district - Mancherial District of Telangana State, India. The project is fourth largest on the Godavari River in Telangana State. It is named after late legislator, D. Sripada Rao.

The Kadem Project is a reservoir on the river Kadem, a tributary river of Godavari near Kademm Mandal, Nirmal District, Telangana. This project covers localised ayacut under Nirmal and Mancherial Districts.

<span class="mw-page-title-main">Sri Komaram Bheem Project</span> Dam in Telangana, India

The Sri Komaram Bheem Project is a Medium Reservoir has been built across Peddavagu River, a tributary of the Pranahita River. It is located at Ada village, Asifabad Mandal, Komaram Bheem district, Telangana.

Mid Manair Dam is a major irrigation project across the Manair River, at Manwada Village, Boinpalli Mandal, Rajanna Sircilla district, Telangana. It has a capacity of 25.87 tmcft with 25 radial gates. It has a capacity to irrigate 2,00,000 acres. It is part of the prestigious Kaleshwaram project from which 2-3 tmcft water will be lifted and router to Mid Manair Dam. The project was completed in April 2018.

SRSP Flood Flow Canal also known as Sriram Sagar Flood Flow Canal, is a 130 km long gravity canal from Sriram Sagar Project, Village & Mandal Mupkal, Nizamabad District to Mid Manair Dam, Manwada Village, Karimnagar District, Telangana.

Shanigaram Reservoir also known as Shanigaram Cheruvu is a medium irrigation project constructed across the Shanigaram River, at Shanigaram Village, Siddipet District, Telangana.

Taliperu Project also known as Taliperu Reservoir is a medium irrigation project constructed across the Taliperu River, a tributary of Godavari River, located at Cherla Village and Mandal, Khammam District, Telangana. This project utilizes about 5.0 TMC of water and creates 24,500 acres (9,900 ha) of Ayacut in both Cherla and Dummugudem Mandals, Khammam District.

Wyra Reservoir is a medium irrigation project constructed across the Wyra River, a tributary of Krishna River. The reservoir is located next to the Wyra town, Khammam District, Telangana. It is one of the tourist attractions in Khammam district. This Wyra reservoir was constructed in 1930, and was inaugurated by Dr.Sarvepalli Radhakrishnan former President of India. It provides drinking water to eight mandalas around Wyra. Hundreds of hectares of land is cultivated using water from Wyra reservoir. It is also well known for its good fishing and the green hills around it. The project provides water to 17,391 acres for irrigation. The reservoir also gets water from Nagarjunasagar left canal.

The Lakshmi Barrage, also known as the Medigadda Barrage is the starting point of the proposed Kaleshwaram Project which envisages construction of three barrages between Yellampally & Medigadda. Its objective is to utilize Godavari water for drinking and irrigation. The Barrage/Project site is located at Medigadda Village, Mahadevpur Mandal, Jayashankar Bhupalpally district in Telangana State, India.

The Saraswati Barrage, also known as the Annaram Barrage is an irrigation project on Godavari River located at Annaram Village, Mahadevpur Mandal, Jayashankar Bhupalpally district in Telangana State, India.

The Parvati Barrage, also known as the Sundilla Barrage is an irrigation project located at Kasipeta Village, Manthani Mandal, Peddapalli district in Telangana State, India.

Pattiseema Lift Irrigation Project is a river interlinking project which connects Godavari River to Krishna River. This project has thereby become the first of such irrigation type projects in the country to be completed in time without any budget enhancements. It also holds a record in Limca Book of Records. The project was Inaugurated by the Chief Minister of Andhra Pradesh Nara Chandrababu Naidu in March 2016 while the project was completed in one year record of time.

Bhagiratha is a safe drinking water project for every village in Telangana State, with a budget of ₹43,791 crores. The project is the brainchild of then-Telangana Chief Minister, K. Chandrashekar Rao, that aims to provide piped water to 2.32 crore people in 20 lakh households in urban and 60 lakhs in rural areas of Telangana.The ambitious project will supply clean drinking water to all households in the state through water sourced from the River Godavari and the River Krishna (32.43TMC). The bulk supply is expected to be completed by May 2018, and intra-village, intra-locality works will be completed by December 2018.

Tummidihetti Barrage is a proposed barrage across Pranhita River, a tributary of Godavari River at Tummidihetti village, Koutala mandal, Adilabad district of Telangana State. The project will provide irrigation facilities for an ayacut of 2,00,000 acres in drought prone areas in East Adilabad District of Telangana State..

Sadarmat Barrage is an under-construction barrage across Godavari River at Ponkal village, Mamda mandal, Nirmal district of Telangana State. This barrage is situated 32 km downstream of Sriram Sagar Project, on the Godavari river and about 7 km upstream of Sadarmat Anicut. The project will provide irrigation facilities for an ayacut of 20,000 acres in Nirmal district of Telangana State.

Janampet Barrage is a proposed barrage (dam) across Godavari River with full pond level (FPL) 67m. It would be located at Janampet village, Pinapaka, Bhadradri Kothagudem, India. This barrage was proposed as part of a proposal to link Godavari, Krishna, Penna and Cauvery rivers, which is part of Indian Rivers Interlinking Project.

References

  1. "KALESHWARAM PROJECT" (PDF). www.irrigation.telangana.gov.in/icad/projectsMajUp#.
  2. "Why is Telangana's Kaleshwaram Lift Irrigation Project important?". The Hindu. 1 July 2017. ISSN   0971-751X . Retrieved 20 April 2018.
  3. "Kaleshwaram project: World's largest multi-stage lift irrigation project inaugurated in Telangana" . Retrieved 22 June 2019.
  4. "EXECUTIVE SUMMARY FOR THE PROPOSED KALESHWARAM PROJECT" (PDF). tspcb.cgg.gov.in. Retrieved 3 April 2021.
  5. "Kaleshwaram Project Summary" (PDF). Telangana State PCB.
  6. "Kaleshwaram Project" (PDF). Telangana Government Irrigation.
  7. "Order of the NGT regarding Kaleshwaram Lift Irrigation Scheme dated 20/10/2020" . Retrieved 20 October 2020.
  8. Kumar, V. Rishi (20 June 2009). "Kaleshwaram — the making of an engineering marvel". The Hindu Business Line. Retrieved 9 August 2019.
  9. "BHEL commissions 1 more unit of Kaleshwaram irrigation project in Telangana". Moneycontrol. 5 August 2019. Retrieved 13 August 2019.
  10. "Kaleshwaram Project [ Full Details ] Telangana - 2019". kaleshwaramproject.com/. Retrieved 9 September 2019.
  11. "CM KCR Serious Warning over Kaleshwaram Project Electricity Bill | NTV". YouTube .
  12. 1 2 "Telangana: Irrigation dept to spend 50% of its budget on power bill | Hyderabad News - Times of India". The Times of India . 7 July 2020.
  13. "CAG Report on Kaleshwaram". hmtvlive.com. Retrieved 18 December 2023.
  14. "BHEL Commissions two more units of Kaleshwaram Lift Irrigation Scheme Package-6 (7x116 MW) in Telangana" (PDF). bhel.com. Retrieved 18 December 2023.
  15. "BHEL commissions 14 Pumping Units of Kaleshwaram Lift Irrigation Scheme in Telangana in a record period of six months" (PDF). bhel.com. Retrieved 18 December 2023.
  16. "NGT red-flags Kaleshwaram project: Green clearance was in violation of law, halt work". The Indian Express. 21 October 2020. Retrieved 21 October 2020.
  17. Pulipaka, Balu (21 October 2020). "NGT says environmental clearance for Kaleshwaram violates law". Deccan Chronicle. Retrieved 21 October 2020.
  18. "Kaleshwaram irrigation project got environmental clearance 'ex post facto' in violation of law: NGT". The Economic Times. Retrieved 21 October 2020.

(Telangana India)