Upper Wardha Dam Nal Damayanti Sagar | |
---|---|
Official name | Upper Wardha Dam D02982 |
Location | Morshi |
Coordinates | 21°16′35″N78°03′26″E / 21.27639°N 78.05722°E |
Opening date | 1993 [1] |
Owner(s) | Government of Maharashtra, India |
Dam and spillways | |
Type of dam | Earthfill Gravity |
Impounds | Wardha River |
Height | 46.2 m (152 ft) (Spillway), 36.62 m (120.1 ft) Earth Dam |
Length | 5,920 m (19,420 ft) (Spillway 268 m (879 ft) |
Reservoir | |
Total capacity | 786,480,000 cubic metres (live storage 614,790,000 cubic metres) |
Catchment area | 4,302 km2 (1,661 sq mi) |
Surface area | 9,748 ha (24,090 acres) |
Website Upper Wardha Dam |
The Upper Wardha Dam is an earthfill straight gravity dam across the Wardha River, a tributary of the Godavari River, near Simbhora village in Morshi taluk in Amravati district in the Indian state of Maharashtra. The dam provides multipurpose benefits of irrigation, drinking water supply, flood control and hydropower generation. [2] [3]
The Upper Wardha Dam is also known as the Nala Damayanti Sagar, named after the famous characters Nala and Damayanti of an epic love story in Hindu mythology, Nala and Damayanti. [2]
The multipurpose Upper Wardha Dam project is considered the lifeline for Amravati city, and Morshi and Warud Talukas. It is an integral component of the Upper Wardha Irrigation Project, which envisages providing water for irrigation, drinking water supply and for industrial use and also flood control. Hydropower generation is planned only when irrigation develops. [2] [3] [4]
The Wardha River, across which the Upper Wardha Dam is built, is a tributary of the Godavari River. From its origin, at an altitude of 785 m (2,575 ft) in Satpura Range from the Multai plateau in Betul District of Madhya Pradesh, the river flows 32 km (20 mi) in Madhya Pradesh and then enters into Maharashtra near the Multai plateau of the Satpuda range. It flows along the entire northern and western border of the Wardha district. After traversing 528 km (328 mi), it joins Wainganga River and together it is called the Pranhita, which ultimately flows into the Godavari River. Kar, Wena, Jam and Erai are its left-bank tributaries whereas Madu, Bembla and Penganga are the right-bank tributaries. The catchment area is hilly and forested in its upper reaches from its source and the lower reaches are flat wide valleys. [2] [3] [5]
The project is located near Morshi, about 8 km (5.0 mi) towards to the east of Morshi and 56 km (35 mi) from the Amravati City, in the Godavari River Basin. The river drains a catchment area of 4,302 km2 (1,661 sq mi) up to the dam site. [2] [3]
The path of Monsoon depressions that originate in the Bay of Bengal descends directly on the Upper Wardha catchment area. In the months of August and September, intense cyclonic precipitation also occurs over the catchment for one of two days as the low-pressure area formed in the Bay of Bengal and the cyclone moved in North West direction. On such occasions, intense rainfall is followed by flash flood runoff in the catchment. In view of these meteorological aspects heavy floods have been very common feature in this catchment. For such a flashy type of catchment with varying topography, runoff estimates at dam site are an involved process. The catchment drained at the dam site is of 4,302 km2 (1,661 sq mi) and is fan shaped. The parameters of slope, soil and vegetation cover, which influence the hydrology of the project, vary widely. [6] The average annual rainfall in the catchment is 840 mm (33 in), with 95% of occurring during monsoon period from June to September. The average annual inflow to the Upper Wardha Reservoir is estimated at 783 million cubic metres. The 75% dependable runoff is estimated as 500,720,000 cubic metres. [4] [7]
Upper Wardha dam has two sections, the spillway at the central part of the river is flanked by long earthen embankment dams. The height of the masonry dam, which is the spillway, above the lowest foundation is 46.2 m (152 ft) and its length is 268 m (879 ft). The height of the earth dam on both flanks of the spillway is 36.62 m (120.1 ft) and its total length is 5,920 m (19,420 ft). The dam structure has a volume content of 6500 million cubic metres. The gross storage capacity of the reservoir is 786,480,000 cubic metres (27.8 TMC) with the live or effective storage capacity fixed at 614.79 million cubic metres (21.7TMC). The Dead Storage capacity is 171,690,000 cubic metres. Water utilization is planned at 390 million cubic metres. The spillway built in the gorge section of the river, which is 240.5 m (789 ft) long, is a gated structure with 13 radial gates designed to pass the design flood discharge of 19,457 m3 (687,100 cu ft)/s. [2] [3] [4] [7]
The reservoir water spread at Full Reservoir Level (FRL) of 342.50 m (1,123.7 ft) is 9,748 ha (24,090 acres). [2] The reservoir submergence involved 24 villages in Amravati and Wardha Districts, which were partially or fully submerged involving rehabilitation of 3000 families (11,817 people) of farmers and fish workers who were displaced and resettled. These families were still in an agitation mode seeking better compensation, as only a small cash compensation was provided to them when resettled. Their demand centred on right to access the Upper Wardha dam (the Nal Damayanti Sagar) reservoir for fisheries as a measure of rehabilitation. [8] [9]
The irrigation system of the project was planned to irrigate lands through the right bank main canal of 95 km (59 mi) length and left bank main canal of 42.4 km (26.3 mi) with complement of a system to carry the water to the fields. The total irrigation potential created is in an irrigable area of 70,169 ha (173,390 acres), out of an irrigation potential of 75,080 ha (185,500 acres) (Gross Command Area is 116,970 ha (289,000 acres), Culturable Command Area is 93,603 ha (231,300 acres)), which is spread over the districts of Amravati and Wardha. The command area is principally made up of Black Cotton Soils. Jowar, cotton, soybean, tur, ground nut, and oranges are the major crops grown in the command area. The canal systems are slated for completion by June 2013. [4] To ensure better irrigation planning to ensure supplies reach the tail end of the canal system even during the low flow years, a "General Algorithm" model to operate the reservoir with a Rule Curve (reservoir operating rules) in real time with inputs of all variable parameters (such as monthly demands for irrigation) has been developed. The model results indicate that irrigation releases matched irrigation demand. The reservoir operation in this process is aimed by maintaining minimum storage at the beginning of monsoon (which is the end of water year) and maintaining maximum storage during the peak of the monsoon period. [4] However, due to the heavy sediment inflow the reservoir is losing its active storage capacity.
Amravati town is now provided water supply from the Upeer Wardha reservoir supplementing an earlier supply source.. Water supply to the Warud town (a flourishing commercial town about 85 mi (137 km) from Amravati city) is also planned to be supplemented from the Upper Wardha reservoir storage, which will supplement the existing tube well sources and the interim measure of tapping the Shekhdari River as a source. The plan envisages supplementation from the storage at the dam to meet the needs of the projected population of 34,500 in 2011 and 34500 in 2026 at 4,209,000 litres per day and 4,974,000 litres per day, respectively. [10] Water for industrial use has also been allocated and based on this allotment, a 25,000,000 litre per day water treatment plant has been built near Amravati town. [11] Another project to divert 4,230,000 cubic metres of water from the Upper Wardha Dam Pandhurna district in Madhya Pradesh has also been approved at a cost of US $18 million.
The reservoir water level is regulated in such a way that the river flooding in the districts of Amravati and Wardha is avoided. An automatic system of operating gates of the spillway dam to release flood water safely downstream has been installed in a control chamber of the dam. The digital instrument installed (based on Genetic Algorithm) is a two-part ultrasonic gauging device. This system is linked to the management system through "RS-232 digital connection" to receive continuous gauge measurement data and concurrently converting the gauge level to volume figures. [4]
The dam and its surroundings provide are picturesque. Several rare species of birds have been reported from the area. [12]
Glenbawn Dam is a major ungated earth and rock fill with clay core embankment dam with concrete chute spillway plus fuse plugs across the Hunter River upstream of Aberdeen in the Hunter Valley of New South Wales, Australia. The dam's purpose includes flood mitigation, hydro-electric power, irrigation, water supply and conservation. The impounded reservoir is called Lake Glenbawn.
Keepit Dam is a major gated mass concrete gravity dam with an earth fill abutment and a central gated concrete overflow crest and six radial gate spillways across the Namoi River upstream of its junction with the Peel River in the North West Slopes region of New South Wales, Australia. The dam's purpose includes flood mitigation, hydro-power, irrigation, water supply and conservation. The impounded reservoir is called Lake Keepit.
The Wardha River, also known as the Varada River, is a major river in Vidarbha, Maharashtra, which originates in the Satpura Range and flows into the Wain ganga river to form the Pranhita river which finally joins the Godavari river.
Lostock Dam is a minor rockfill and clay core embankment dam with a concrete lined, flip bucket spillway across the Paterson River upstream of the village of East Gresford in the Hunter region of New South Wales, Australia. The dam's purpose includes flood mitigation, irrigation, water supply and conservation. Mini hydro-power facilities were retrofitted in 2010. The impounded reservoir is also called Lostock Dam.
Nagarjuna Sagar Dam is a masonry dam across the Krishna River at Nagarjuna Sagar which straddles the border between Palnadu district in Andhra Pradesh and Nalgonda district in Telangana. The dam provides irrigation water to the districts of Palnadu, Guntur, Nalgonda, Prakasam, Khammam, Krishna, and parts of West Godavari. It is also a source of electricity generation for the national grid.
The Blowering Dam is a major ungated rock fill with clay core embankment dam with concrete chute spillway impounding a reservoir under the same name. It is located on the Tumut River upstream of Tumut in the Snowy Mountains region of New South Wales, Australia. Purposes for the dam include flood mitigation, hydro-power, irrigation, water supply and conservation. The dam is part of the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.
Googong Dam is a minor ungated earth and rock fill with clay core embankment dam with concrete chute spillway plus a nearby 13 metres (43 ft) high earthfill saddle embankment across the Queanbeyan River upstream of Queanbeyan in the Capital Country region of New South Wales, Australia. The dam's purpose includes water supply for Canberra and Queanbeyan. The impounded reservoir is called Googong Reservoir.
Cochrane Dam is a minor earthfill embankment dam with concrete spillway across Georges Creek, located in the South Coast region of New South Wales, Australia. The main purpose of the dam is to supply water for hydro-power at the downstream Brown Mountain Power Station and for irrigation purposes. The impounded reservoir is called Cochrane Lake.
The Rana Pratap Sagar Dam is a gravity masonry dam of 53.8 metres (177 ft) height built on the Chambal River at Rawatbhata in Rajasthan in India. It is part of integrated scheme of a cascade development of the river involving four projects starting with the Gandhi Sagar Dam in the upstream reach in Madhya Pradesh and the Jawahar Sagar Dam on the downstream with a terminal structure of the Kota Barrage in Rajasthan for irrigation.
Lake Qaraoun is an artificial lake or reservoir located in the southern region of the Beqaa Valley, Lebanon. It was created near Qaraoun village in 1959 by building a 61 m-high (200 ft) concrete-faced rockfill dam in the middle reaches of the Litani River. The reservoir has been used for hydropower generation, domestic water supply, and for irrigation of 27,500 ha.
Split Rock Dam is a minor ungated concrete faced rock fill embankment dam with concrete chute spillway across the Manilla River upstream of Manilla in the north-western slopes region of New South Wales, Australia. The dam's purpose includes flood mitigation, irrigation, water supply and conservation. The impounded reservoir is called Split Rock Reservoir.
Ujjani Dam, also known as Bhima Dam or Bhima Irrigation Project, on the Bhima River, a tributary of the Krishna River, is an earthfill cum Masonry gravity dam located near Ujjani village of Madha Taluk in Solapur district of the state of Maharashtra in India.
Jayakwadi dam is an earthen dam located on Godavari river at the site of Jayakwadi village in Paithan taluka of Sambhajinagar district in Maharashtra, India. It is a multipurpose project. The water is mainly used to irrigate agricultural land in the drought-prone Marathwada region of the state. It also provides water for drinking and industrial usage to nearby towns and villages and to the municipalities and industrial areas of Sambhajinagar and Jalna districts. The surrounding area of the dam has a garden and a bird sanctuary.
Upper Pus Dam, also called Pus Dam is an earthfill dam on Pus river near Pusad, Yavatmal district in the state of Maharashtra in India. There is another downstream dam near Mahagaon called Lower Pus Dam which was built in 1983. Other nearby dams are Arunawati Dam in Digras built in 1994 and Isapur Dam built in 1982.
The Polavaram Project is an under construction multi-purpose irrigation project on the Godavari River in the Eluru District and East Godavari District in Andhra Pradesh. The project has been accorded National project status by the Central Government of India. Its reservoir back water spreads up to the Dummugudem Anicut and approx 115 km on Sabari River side. Thus back water spreads into parts of Chhattisgarh and Odisha States. It gives major boost to tourism sector in Godavari Districts as the reservoir covers the famous Papikonda National Park, Polavaram hydro electric project (HEP) and National Waterway 4 are under construction on left side of the river. It is located 40 km to the upstream of Sir Arthur Cotton Barrage in Rajamahendravaram City and 25 km from Rajahmundry Airport.
Idamalayar Dam is a multipurpose concrete gravity dam located at Ennakkal between Ayyampuzha and Bhoothathankettu in Ernakulam district of Kerala on the Idamalayar, a tributary of the Periyar River in Kerala, South India. The dam however extends east as far as Malakkappara. Completed in 1985, with a length of 373 metres (1,224 ft) and a height of 102.8 metres (337 ft), the dam created a multipurpose reservoir covering 28.3 km2 (10.9 sq mi) in the scenic hills of the Anamalais.
The Bhadra Dam or Lakkavalli Dam, which has created the Bhadra Reservoir, is located on the Bhadra River a tributary of Tungabhadra River. Bhadra Dam is located in the border of Bhadravathi and Tarikere, in the western part of Karnataka in India. The benefits derived from the reservoir storage are irrigation with gross irrigation potential of 162,818 hectares, hydro power generation of 39.2 MW, drinking water supply and industrial use. The dam commissioned in 1965 is a composite earth cum masonry structure of 59.13 metres (194.0 ft) height with length of 1,708 metres (5,604 ft) at the crest level, which submerges a land area of 11,250.88 hectares.
Zengwen Dam, also spelled Tsengwen Dam, is a major earthen dam in Dapu Township, Chiayi County, Taiwan on the Zengwen River. It is the third tallest dam in Taiwan, and forms Zengwen Reservoir (曾文水庫), the biggest reservoir in Taiwan by volume. The dam stores water for irrigation of the Chianan Plain, Taiwan's most productive agricultural region, and provides flood control along the Zengwen River which flows through Tainan City. The dam supports a 50 megawatt hydroelectric power station.
Grahamstown Dam is a major off-stream earthfill Embankment dam with a controlled labyrinth spillway and baffle chute that stores water from the Williams River. The dam is located north of Newcastle, New South Wales, Australia. The dam's main purpose is water supply; it provides about 40 per cent of the potable water for the Hunter Region; and is its largest drinking water supply dam.
Lower Manair Dam also known as LMD was constructed across the Manair River, at Alugunur village, Thimmapur mandal, Karimnagar District, in the Indian state of Telangana during 1974 to 1985. It provides irrigation to a gross command area of 163,000 hectares.