Mid Manair Dam | |
---|---|
Official name | Mid Manair Dam |
Location | Manwada Village, Rajanna Sircilla district, Telangana, India |
Coordinates | 18°23′34″N78°57′40″E / 18.39278°N 78.96111°E |
Status | Under Construction |
Construction began | 2005 |
Dam and spillways | |
Impounds | Manair River and SRSP Flood Flow Canal |
Height | 45 metres (148 ft) from river level |
Length | 388 metres (1,273 ft) [1] |
Reservoir | |
Creates | Mid Manair Reservoir |
Total capacity | 25.873 Tmcft |
Active capacity | 21~Tmcft |
Mid Manair Dam is a major irrigation project across the Manair River, at Manwada Village, Boinpalli Mandal, Rajanna Sircilla district, Telangana. [2] It has a capacity of 25.87 tmcft with 25 radial gates. It has a capacity to irrigate 2,00,000 acres. It is part of the prestigious Kaleshwaram project from which 2-3 tmcft water will be lifted and router to Mid Manair Dam. The project was completed in April 2018.
The balancing reservoir initiated as part of SRSP stage-II for which the foundation stone was laid by the former Prime Minister P. V. Narasimha Rao in 1991. The surplus water from Sriram Sagar Project flows through the SRSP Flood Flow Canal (SRSP FFC) into the Mid Manair Dam as well as Manair River water. Once the dam reaches full capacity, water is released into the Lower Manair Dam, a major balancing reservoir at Karimnagar city with 24Tmcft Gross Capacity.
Dam construction was started in 2004-05 as part of Jalayagnam, but was delayed due to the several political reasons.
130 km long Flood Flow Canal construction work was completed before the Mid Manair Dam. While the dam was under construction, the released water from the Flood Flow Canal head regulator flowed to the Lower Manair Dam.
For the project completion, it took 10 years to complete 50% work, and 10 months to complete the rest 50% in April 2018. The final cost for completing the project was ₹2050 crores.
The Gross Capacity of the reservoir is 25.873 Tmcft. The Left Bank Canal 22 km to irrigate 9,500 acres. The Right Bank Canal 64 km to irrigate 90,500 acres. From June 2018, the Kaleshwaram project feeds the Mid-Manair Reservoir with the Godavari water and stabilizes the ayacut via existing projects.
On 25 September 2016, flood water flowed over the incomplete earth dam of the project and breached the earth dam inundating the downstream areas. Few villages were evacuated to save from water inundation. [3] It was planned to store 3 tmcft water in the project to facilitate water supply under SRSP (stage-II) and Kaleshwaram Lift Irrigation Project. It is not possible to supply water from the project till the earth dam is reconstructed. The project planning and its execution is blamed for the dam breach which has not constructed the earth dam to adequate level in comparison with the adjacent concrete spill way to safely pass the normal flood water without over topping the earth dam.
The Godavari River has its catchment area in seven states of India: Maharashtra, Telangana, Chhattisgarh, Madhya Pradesh, Andhra Pradesh, Karnataka and Odisha. The number of dams constructed in Godavari basin is the highest among all the river basins in India. Nearly 350 major and medium dams and barrages had been constructed in the river basin by the year 2012.
The Sriram Sagar Project is also known as the Pochampadu Project is an Indian flood-flow project on the Godavari. The Project is located in Nizamabad district, 3 km away from National Highway 44. It has been described by The Hindu as a "lifeline for a large part of Telangana".
Nagarjuna Sagar Dam is a masonry dam across the Krishna River at Nagarjuna Sagar which straddles the border between Palnadu district in Andhra Pradesh and Nalgonda district in Telangana. The dam provides irrigation water to the districts of Krishna, Guntur, Palnadu, Prakasam and parts of West Godavari districts of Andhra Pradesh and also Nalgonda, Suryapet, Khammam, Bhadradri Kothagudem districts of Telangana. It is also a source of electricity generation for the national grid.
The Srisailam Dam is constructed across the Krishna River in Nandyal district, Andhra Pradesh and Nagarkurnool district, Telangana near Srisailam temple town and is the 2nd largest capacity working hydroelectric station in India.
The Babli project / barrage is a controversial reservoir project being constructed by Maharashtra across the river Godavari, disputed by Telangana. The Supreme Court of India delivered a ruling after seven years in favour of Maharashtra with the Andhra Pradesh government expected to appeal against it.
River Vamsadhara or River Banshadhara is an important east flowing river between Rushikulya and Godavari, in Odisha and Andhra Pradesh states in India.
The Polavaram Project is an under construction multi-purpose irrigation project on the Godavari River in the Eluru District and East Godavari District in Andhra Pradesh. The project has been accorded National project status by the Central Government of India. Its reservoir back water spreads up to the Dummugudem Anicut and approx 115 km on Sabari River side. Thus back water spreads into parts of Chhattisgarh and Odisha States. It gives major boost to tourism sector in Godavari Districts as the reservoir covers the famous Papikonda National Park, Polavaram hydro electric project (HEP) and National Waterway 4 are under construction on left side of the river. It is located 40 km to the upstream of Sir Arthur Cotton Barrage in Rajamahendravaram City and 25 km from Rajahmundry Airport.
The Pranahita Chevella Lift Irrigation Project is a lift irrigation project to harness the water of Pranahita tributary of Godavari River for use in the Telangana state of India. The river water diversion barrage across the Pranahita River is located at Thammidihatti village in Komaram Bheem district of Telangana. This lift canal is an inter river basin transfer link by feeding Godavari River water to Krishna River basin. The chief ministers of Telangana and Maharashtra states reached an agreement in 2016 to limit the full reservoir level (FRL) of the barrage at 148 m msl with 1.85 tmcft storage capacity. In the year 2016, this project is divided into two parts. The scheme with diversion canal from the Thammmidihatti barrage to connect to existing Yellampalli reservoir across the Godavari River is presently called Pranahita barrage lift irrigation project. This scheme is confined to providing irrigation facility to nearly 2,00,000 acres in Adilabad district using 44 tmcft water.
The Pulichintala Project is a multi-purpose water management project for irrigation, hydropower generation, and flood control in the state of Andhra Pradesh, India, named after the prominent civil engineer, Kanuri Lakshmana Rao. It is a crucial irrigation facility for farmers in four coastal districts: West Godavari, Krishna, Guntur, Palanadu, and Prakasam, covering over 13 lakh acres. It has 24 gates and a balancing reservoir with a capacity of 46 Tmcft at 175 feet (53 m) MSL full reservoir level (FRL).
Sripada Yellampalli Project is an irrigation project located at Yellampalli Village of Ramagundam rural Mandal, between Peddapalli district - Mancherial District of Telangana State, India. The project is fourth largest on the Godavari River in Telangana State. It is named after late legislator, D. Sripada Rao.
Nagarjuna Sagar tail pond is a multipurpose reservoir located 21 km downstream from the Nagarjuna Sagar Dam across the Krishna River near Satrasala in Nalgonda district, India. Its gross water storage capacity is 6 Tmcft. The reservoir water spread area extends up to the toe of the Nagarjuna Sagar dam. The project was completed by July 2014.
Lower Manair Dam also known as LMD was constructed across the Manair River, at Alugunur village, Thimmapur mandal, Karimnagar District, in the Indian state of Telangana during 1974 to 1985. It provides irrigation to a gross command area of 163,000 hectares.
SRSP Flood Flow Canal also known as Sriram Sagar Flood Flow Canal, is a 130 km long gravity canal from Sriram Sagar Project, Village & Mandal Mupkal, Nizamabad District to Mid Manair Dam, Manwada Village, Karimnagar District, Telangana.
Shanigaram Reservoir also known as Shanigaram Cheruvu is a medium irrigation project constructed across the Shanigaram River, at Shanigaram Village, Siddipet District, Telangana.
The Lakshmi Barrage, also known as the Medigadda Barrage is the starting point of the proposed Kaleshwaram Project which envisages construction of three barrages between Yellampally & Medigadda. Its objective is to utilize Godavari water for drinking and irrigation. The Barrage/Project site is located at Medigadda Village, Mahadevpur Mandal, Jayashankar Bhupalpally district in Telangana State, India.
The Saraswati Barrage, also known as the Annaram Barrage is an irrigation project on Godavari River located at Annaram Village, Mahadevpur Mandal, Jayashankar Bhupalpally district in Telangana State, India.
The Parvati Barrage, also known as the Sundilla Barrage is an irrigation project located at Kasipeta Village, Manthani Mandal, Peddapalli district in Telangana State, India.
The Kaleshwaram Lift Irrigation Project (KLIP) is a multi-purpose irrigation project on the Godavari River in Kaleshwaram, Bhupalpally, Telangana, India. Currently the world's largest multi-stage lift irrigation project, its farthest upstream influence is at the confluence of the Pranahita and Godavari rivers. The Pranahita River is itself a confluence of various smaller tributaries including the Wardha, Painganga, and Wainganga rivers which combine to form the seventh-largest drainage basin on the subcontinent, with an estimated annual discharge of more than 6,427,900 acre-feet or 280 TMC. It remains untapped as its course is principally through dense forests and other ecologically sensitive zones such as wildlife sanctuaries.
Sadarmat Barrage is an under-construction barrage across Godavari River at Ponkal village, Mamda mandal, Nirmal district of Telangana State. This barrage is situated 32 km downstream of Sriram Sagar Project, on the Godavari river and about 7 km upstream of Sadarmat Anicut. The project will provide irrigation facilities for an ayacut of 20,000 acres in Nirmal district of Telangana State.
Janampet Barrage is a proposed barrage (dam) across Godavari River with full pond level (FPL) 67m. It would be located at Janampet village, Pinapaka, Bhadradri Kothagudem, India. This barrage was proposed as part of a proposal to link Godavari, Krishna, Penna and Cauvery rivers, which is part of Indian Rivers Interlinking Project.