"}" id="mwBg">
Preceding station | Buenos Aires Underground | Following station | ||
---|---|---|---|---|
Congreso de Tucumán Terminus | Line D | José Hernández towards Catedral |
Juramento is a station on Line D of the Buenos Aires Underground. It is located at the intersection of Cabildo and Juramento avenues. The station was opened on 21 June 1999 as the western terminus of the extension of the line from José Hernández. On 27 April 2000, the line was extended further west to Congreso de Tucumán. [1]
Belgrano is a northern and leafy barrio or neighborhood of Buenos Aires, Argentina.
The Buenos Aires Underground, locally known as Subte, is a rapid transit system that serves the area of the city of Buenos Aires, Argentina. The first section of this network opened in 1913, making it the 13th earliest subway network in the world and the first underground railway in Latin America, the Southern Hemisphere, and the Spanish-speaking world, with the Madrid Metro opening nearly six years later, in 1919. As of 2023, Buenos Aires is the only Argentine city with a metro system.
Line D of the Buenos Aires Underground runs from Catedral to Congreso de Tucumán. The line opened on 3 June 1937 and has been expanded to the north several times. The line is currently 11 km long and has 16 stations, while running approximately parallel to the city's coastline.
Retiro is the name of a railway station complex in Buenos Aires, Argentina, that includes three main terminal train stations and two terminal subway stations.
Once railway station is a large railway terminus in central Buenos Aires, Argentina, in the barrio of Balvanera.
The Premetro is a 7.4-kilometer long (4.6 mi) light rail line that runs along the outskirts of Buenos Aires, connecting with the Buenos Aires Underground line E, at Plaza de los Virreyes station and then to General Savio, with a short branch to Centro Cívico. It opened in 1987 and is operated by Metrovías. Originally, the Premetro was to include many more lines, but shortly after the privatisation of the railways the projects were postponed and never materialised and only "Premetro E2" was built.
The Urquiza Line is a 26 km (16 mi) suburban electric commuter rail line in Buenos Aires, Argentina, operated by the former Buenos Aires Underground operator Metrovías. It runs from the Federico Lacroze terminus in the neighborhood of Chacarita, to General Lemos terminus in Campo de Mayo district of Greater Buenos Aires, completing a total journey time of 46 minutes. The line uses third rail current collection and, at present, is used by an average of 75,400 passengers daily. The line operates 20 hours a day, 7 days a week at 8 to 30 minute intervals. This suburban line runs on track once operated by General Urquiza Railway before railway privatisation.
Federico Lacroze is an underground station on Line B of the Buenos Aires Underground named after the Argentine railway entrepreneur, located at the intersection of Corrientes and Federico Lacroze avenues in the Chacarita neighbourhood and near the La Chacarita Cemetery. The station was opened on 17 October 1930 as the western terminus of the extension of the line from Federico Lacroze to Callao.
Plaza Miserere is a station on Line A of the Buenos Aires Underground. The station is located between Alberti and Loria / Pasco stations on the A line underground. Plaza Miserere has interchange with Once underground station of the H line and connection to the Sarmiento line commuter rail service within Once railway station, the central station of the Domingo Faustino Sarmiento Railway.
Catedral is a terminal station of the Line D of the Buenos Aires Underground. From here, passengers may transfer to the Perú station on Line A and the Bolívar station on Line E.
Plaza Italia station is part of the line D of the Buenos Aires Underground. It is located at the intersection of Avenida Santa Fe and the roundabout surrounding Plaza Italia in Palermo. The station was opened on 23 February 1940 as part of the extension of Line D from Tribunales to Palermo.
Puan is a station on Line A of the Buenos Aires Underground. The station was opened on 23 December 2008 as part of the extension of the line from Primera Junta to Carabobo.
Sáenz Peña is a station on Line A of the Buenos Aires Underground. It is the last station of the line located under the Avenida de Mayo in the neighbourhood of Monserrat. The station belonged to the inaugural section of the Buenos Aires Underground opened on 1 December 1913, which linked the stations Plaza Miserere and Plaza de Mayo.
Lima is a station on Line A of the Buenos Aires Underground. Passengers may transfer from here to the Avenida de Mayo station on Line C and Metrobus 9 de Julio. The station belonged to the inaugural section of the Buenos Aires Underground opened on 1 December 1913, which linked the stations Plaza Miserere and Plaza de Mayo.
Carlos Gardel is a station on Line B of the Buenos Aires Underground.
Carlos Pellegrini is a station on Line B of the Buenos Aires Underground. From here, passengers may transfer to the Diagonal Norte Station on Line C and the 9 de Julio Station on Line D and Metrobus 9 de Julio. The station was opened on 22 July 1931 as the eastern terminus of the extension of the line from Callao. In December 1931, the line was extended further east to Leandro N. Alem.
Congreso de Tucumán is a station on Line D of the Buenos Aires Underground and is the current terminus. The station was opened on 27 April 2000 as the western terminus of the extension of the line from Juramento. It is located at the intersection of Cabildo and Congreso avenues. As of June 2015, the station connects to the Metrobus Cabildo bus rapid transit line that was opened that year. New underground passageways and station entrances were made for the station to provide easy transfer to the Metrobus line.
José Hernández is a station on Line D of the Buenos Aires Underground. The station was opened on 31 May 1997 as the western terminus of the extension of the line from Ministro Carranza. On 21 June 1999 the line was extended further west to Juramento.
Corrientes Station is a station on Line H of the Buenos Aires Underground. The station was opened on 6 December 2010 as part of the one-station extension of the line from Once. It served as the line's north terminus until the extension of the line to Las Heras was completed on 18 December 2015. From here, passengers may transfer to the Pueyrredón Station on Line B.
The Buenos Aires Metrobús is a 50.5 km (31.4 mi) network of dedicated separated lanes and stations for buses that serve the city of Buenos Aires, Argentina. Designed as a Bus Rapid Transit system, it mixes a few bi-articulated buses with conventional buses. The headway is the same as before the implementation of the system, and the buses on the system use the same brand as the main network, that is, maintaining their previous branding as common bus lines with their own numbers. The service operates 24 hours a day and 365 days a year, with 2-4 minute frequencies during the day and 10–15 minutes at night.
Media related to Juramento (Buenos Aires Underground) at Wikimedia Commons