Khmelnytskyi Nuclear Power Plant

Last updated
Khmelnytskyi Nuclear Power Plant
Khnpp 2013 - 2.jpg
Khmelnytskyi Nuclear Power Plant
Khmelnytskyi Nuclear Power Plant
Country Ukraine
Location Netishyn
Coordinates 50°18′5.06″N26°38′59.10″E / 50.3014056°N 26.6497500°E / 50.3014056; 26.6497500
StatusOperational
Construction began1981
Commission date 1987
Owner Energoatom
Nuclear power station
Reactor type VVER
Reactor supplier Atomstroyexport
Power generation
Units operational2 x 1,000 MW
Make and modelTurbines and generators:
Units under const.2 x 1,000 MW
Nameplate capacity 2,000 MW
External links
Website www.xaec.org.ua
Commons Related media on Commons

The Khmelnytskyi Nuclear Power Plant generates nuclear power in Ukraine. The plant is operated by Energoatom. Two VVER-1000 reactors are operational, each generating 1000 MW (net) of electricity, with two AP1000 reactors under construction. [1]

Contents

Khmelnytskyi Nuclear Power Plant is connected to the Rzeszów–Khmelnytskyi powerline, one of three 750 kV lines running between Ukraine and the European Union. [2]

On two occasions in November 2023, explosions were heard near the Khmelnitsky Nuclear Power Plant and its two Soviet-era reactors, which was assumed to be the result of near-misses by Russian missile attacks on or near the facility. [3]

History

Construction of the first reactor started under the Soviet Union in 1981 and the first unit was put in operation in late 1987. Construction of the second reactor started in 1983 with plans to finish it in 1991. In 1990, however, construction was stopped as part of a moratorium on new plant construction introduced due to public mistrust following the Chernobyl disaster. Construction was completed only in August 2004 after the moratorium was lifted. [4]

Since 1992, it has been guarded by the 3rd NPP Protection Battalion.

Two more VVER-1000 reactors were under construction: Construction of the third reactor started in September 1985 and the fourth reactor in June 1986. Construction was stopped in 1990 when they were 75% and 28% complete, respectively. An intergovernmental agreement on the resumption of construction was signed between Ukraine and Russia in June 2010. [5] On 10 February 2011, Energoatom and Atomstroyexport signed a contract agreement for the completion of reactors 3 and 4. They should have been commissioned in 2018 and 2020, respectively. [6] Feasibility study of reactors 3 and 4 was conducted by Kyiv Institute Energoproekt.

Following the Russian attack on Ukraine going on since February 2014 with varying intensity the Ukrainian government of Arseniy Yatseniuk formally terminated the agreement with Russia in September 2015.

In August 2016 an agreement with Korea Hydro & Nuclear Power was made to assist with the completion of reactors 3 and 4, [7] but little progress was made. In 2020 a Ukrainian working group assessed the safety of the old cranes on the site needed to progress construction work. [8]

Energoatom considered disconnecting unit 2 from the Ukrainian power grid and connecting it to the Burshtyn energy island centered around the coal powered Burshtyn TES, which up to 2022 was the only part of Ukraine connected to the European power grid, to facilitate exports to Poland and Hungary. [2] [9] In 2019 the Ministry of Energy created a consortium, Ukraine Power Bridge Company Limited, to progress the project, but as of 2020 the project was not agreed. [10]

AP1000 reactors

In late November 2021, Energoatom and Westinghouse Electric agreed on a contract to construct the first Westinghouse AP1000 reactor in Ukraine at the Khmelnytskyi plant. [11] [12]

In May 2022, Energoatom stated that the full scale Russian invasion going on since February and occupations of other power stations had not changed their ambitions to construct these units. They are still working with Westinghouse to construct two AP1000 reactors at the site. [13]

Employees from the Russia-occupied Zaporizhzhia Nuclear Power Plant will be hired on these new reactors. [14]

See also

Related Research Articles

Westinghouse Electric Company LLC is an American nuclear power company formed in 1999 from the nuclear power division of the original Westinghouse Electric Corporation. It offers nuclear products and services to utilities internationally, including nuclear fuel, service and maintenance, instrumentation, control and design of nuclear power plants. Westinghouse's world headquarters are located in the Pittsburgh suburb of Cranberry Township, Pennsylvania.

<span class="mw-page-title-main">Rosatom</span> Russian state-owned nuclear technologies company

State Atomic Energy Corporation Rosatom, also known as Rosatom State Nuclear Energy Corporation,, or Rosatom State Corporation, is a Russian state corporation headquartered in Moscow that specializes in nuclear energy, nuclear non-energy goods and high-tech products. It was established in 2007 and comprises more than 350 enterprises, including scientific research organizations, a nuclear weapons complex, and the world's only nuclear icebreaker fleet.

<span class="mw-page-title-main">Zaporizhzhia Nuclear Power Plant</span> Nuclear-power plant in Enerhodar, Ukraine

The Zaporizhzhia Nuclear Power Station in southeastern Ukraine is the largest nuclear power plant in Europe and among the 10 largest in the world. It has been under Russian control since 2022. It was built by the Soviet Union near the city of Enerhodar, on the southern shore of the Kakhovka Reservoir on the Dnieper river. From 1996 to 2022, it was operated by Energoatom, which operates Ukraine's other three nuclear power stations.

<span class="mw-page-title-main">Kozloduy Nuclear Power Plant</span> Nuclear power plant in Bulgaria

The Kozloduy Nuclear Power Plant is a nuclear power plant in Bulgaria situated 180 kilometres (110 mi) north of Sofia and 5 kilometres (3.1 mi) east of Kozloduy, a town on the Danube river, near the border with Romania. It is the country's only nuclear power plant and the largest in the region. The construction of the first reactor began on 6 April 1970.

<span class="mw-page-title-main">AP1000</span> American pressurized water cooling nuclear reactor design

The AP1000 is a nuclear power plant designed and sold by Westinghouse Electric Company. The plant is a pressurized water reactor with improved use of passive nuclear safety and many design features intended to lower its capital cost and improve its economics.

<span class="mw-page-title-main">VVER</span> Soviet / Russian nuclear reactor type

The water-water energetic reactor (WWER), or VVER is a series of pressurized water reactor designs originally developed in the Soviet Union, and now Russia, by OKB Gidropress. The idea of such a reactor was proposed at the Kurchatov Institute by Savely Moiseevich Feinberg. VVER were originally developed before the 1970s, and have been continually updated. They were one of the initial reactors developed by the USSR, the other being the infamous RBMK. As a result, the name VVER is associated with a wide variety of reactor designs spanning from generation I reactors to modern generation III+ reactor designs. Power output ranges from 70 to 1300 MWe, with designs of up to 1700 MWe in development. The first prototype VVER-210 was built at the Novovoronezh Nuclear Power Plant.

<span class="mw-page-title-main">Nuclear power in Russia</span>

Russia is one of the world's largest producers of nuclear energy. In 2020 total electricity generated in nuclear power plants in Russia was 215.746 TWh, 20.28% of all power generation. The installed gross capacity of Russian nuclear reactors is 29.4 GW in December 2020.

<span class="mw-page-title-main">Rivne Nuclear Power Plant</span> Nuclear power plant in Ukraine

The Rivne Nuclear Power Plant, also called Rovno is a nuclear power plant in Varash, Rivne Oblast, Ukraine.

State Enterprise National Nuclear Energy Generating Company "Energoatom", commonly known as just Energoatom, is a state enterprise operating all four nuclear power plants in Ukraine. It is the largest power producer in Ukraine.

<span class="mw-page-title-main">Nuclear power in the Czech Republic</span>

The Czech Republic operates two nuclear power plants: Temelín and Dukovany. As of 2019 the government intends to increase the share of nuclear electricity production from 30 % to 58 %. To this end, a new reactor is to be constructed at the Dukovany site, which will replace older units by 2035. New capacities are also expected to be added at the Temelín site.

<span class="mw-page-title-main">Kursk Nuclear Power Plant</span> Russian nuclear power plant

The Kursk Nuclear Power Plant is one of the three biggest nuclear power plants (NPPs) in Russia and one of the four biggest electricity producers in the country. It is located on the bank of the Seym River about 40 kilometers west of the city of Kursk, midway between it and the town of Lgov, in western Russia. The nearby city of Kurchatov was founded when construction of the plant began. The plant feeds the grid for Kursk Oblast and 19 other regions. As of 2024, the site houses two active reactors and two decommissioned older units. It also houses the partially built Kursk 5 and Kursk 6 units which had construction halted, and two new VVER designs are under construction.

<span class="mw-page-title-main">South Ukraine Nuclear Power Plant</span> Nuclear power plant in Ukraine

The South Ukraine Nuclear Power Plant, also known as the Pivdennoukrainsk Nuclear Power Plant, is a nuclear power plant in Ukraine, near the city of Pivdennoukrainsk in Mykolaiv Oblast, about 350 kilometres (220 mi) south of Kyiv. It is the second largest of the country's five nuclear power stations. It is part of the South Ukrainian Energy Complex, along with the Tashlyk Pumped-Storage Power Plant and Oleksandrivska hydroelectric power station.

Atomstroyexport (ASE) JSC (Russian: Атомстройэкспорт) is the Russian Federation's nuclear power equipment and service exporter. It is a fully owned subsidiary of Rosatom.

<span class="mw-page-title-main">Nuclear power in Ukraine</span>

Ukraine operates four nuclear power plants with 15 reactors located in Volhynia and South Ukraine. The total installed nuclear power capacity is over 13 GWe, ranking 7th in the world in 2020. Energoatom, a Ukrainian state enterprise, operates all four active nuclear power stations in Ukraine. In 2019, nuclear power supplied over 20% of Ukraine's energy.

Slovakia has five operational nuclear reactors, with a combined net power capacity of 2,308 MWe, with a sixth coming on line shortly. Within the EU, Slovakia is one of the pro-nuclear Visegrád Group nations.

<span class="mw-page-title-main">Rooppur Nuclear Power Plant</span> Under-construction nuclear power plant in Bangladesh

The Rooppur Nuclear Power Plant (Bengali: রূপপুর পারমাণবিক বিদ্যুৎকেন্দ্র) is a 2.4 GWe nuclear power plant project in Bangladesh. The nuclear power plant is being constructed at Rooppur of Ishwardi Upazila on the bank of the river Padma, about 160 km northwest of Dhaka. It will be the country's first nuclear power plant, and the first of the two units is expected to go into operation in 2025.

<span class="mw-page-title-main">Turboatom</span>

Ukrainian Energy Machines Joint Stock Company "Turboatom", commonly known as just Turboatom, is a state enterprise responsible for power engineering in Ukraine. The company specializes in the production and maintenance of steam and other turbines for thermal power stations; nuclear power plants and cogeneration plants; hydraulic turbines for hydroelectric power stations and pumped storage power plants; gas turbines and combined cycle turbines for thermal power plants; and other power equipment.

<span class="mw-page-title-main">Chyhyryn Nuclear Power Plant</span> Unfinished nuclear power plant near Chyhyryn, Ukraine

Chyhyryn Nuclear Power Station is an unfinished nuclear power plant located to the east of Chyhyryn in Ukraine, on the territory adjacent to the Kremenchuk Reservoir shore, between the villages Stetsivka and Vitove.

<span class="mw-page-title-main">Zaporizhzhia Nuclear Power Plant crisis</span> Ongoing nuclear safety crisis during the Russian Invasion of Ukraine

During the Russian invasion of Ukraine, the Zaporizhzhia Nuclear Power Plant has become the center of an ongoing nuclear safety crisis, described by Ukraine as an act of nuclear terrorism by Russia.

References

  1. "Ukraine: Current status of nuclear power installations". Nuclear Energy Agency (NEA). Retrieved 2024-07-19.
  2. 1 2 Alexander Bor (27 May 2016). "Ukraine to build power line for power exports to Poland, Hungary: EnergoAtom". Platts. Retrieved 16 June 2016.
  3. "Nuclear disasters–in–waiting". Science. 5 January 2024. Retrieved 4 January 2024.
  4. "Nuclear Power Plants in Lithuania & Ukraine". industcards.com. Archived from the original on 2012-12-09. Retrieved 2011-02-13.
  5. "Khmelnitsky feasibility study progresses". World Nuclear News. 2011-02-03. Retrieved 2011-02-13.
  6. "Contract agreement for Khmelnitsky 3 and 4". World Nuclear News. 2011-02-10. Retrieved 2011-02-13.
  7. "Korea agrees to help with construction of Ukrainian NPP". Nuclear Engineering International. 2 September 2016. Retrieved 21 July 2017.
  8. "Ukraine must expand nuclear energy, says President". World Nuclear News. 5 October 2020. Retrieved 7 October 2020.
  9. "Energoatom awaits approval for energy bridge tender". World Nuclear News. 18 April 2018. Retrieved 18 April 2018.
  10. "Energy Bridge has geopolitical significance, says Polenergia". World Nuclear News. 4 December 2020. Retrieved 7 December 2020.
  11. "Contract signed for first AP1000 unit in Ukraine -- ANS / Nuclear Newswire". www.ans.org. Retrieved 2021-12-02.
  12. "Westinghouse Electric Company and Energoatom Sign Contract for First AP1000 Unit in Ukraine". www.businesswire.com. 2021-11-22. Retrieved 2021-12-02.
  13. "Ukraine planning for post-war nuclear power plants : New Nuclear - World Nuclear News".
  14. "Nearly 5,000 workers evacuated from Russian-occupied nuclear power plant in Zaporizhzhia, minister says". The Kyiv Independent. 2024-07-19. Retrieved 2024-07-21.