Line 27 (Shenzhen Metro)

Last updated
Line 27
27
Overview
StatusUnder planning
Locale Shenzhen, Guangdong
Termini
Stations19 (Phase 1)
Service
Type Rapid transit
System Shenzhen Metro
Services1
Operator(s)SZMC (Shenzhen Metro Group)
Technical
Line length23.2km (Phase 1)
CharacterUnderground
Operating speed80km/h

Line 27 of the Shenzhen Metro is a line under planning, which will connect the districts of Nanshan, Longhua and Longgang. [1] Construction is planned to begin in 2023. The first phase of Line 27 has entered Phase V planning, and will run from Songpingcun in Nanshan District near Xili High Speed Railway Station to Gangtou West in Longhua District, with 19 stations and 23.2 kilometers of track. [2] The line is proposed to use 6 car type B trains. [3]

Line 27 full alignment (in Chinese) Shen Zhen Shi Cheng Shi Gui Dao Jiao Tong 27Hao Xian Gui Hua Fang An Tu .jpg
Line 27 full alignment (in Chinese)

Stations (Phase 1)

Station nameConnectionsLocation
EnglishChinese
Songpingcun 松坪村 Nanshan
Xili High Speed Railway Station 西丽高铁站  13    15    29  
China Railways.svg ELQ
Xili South 西丽南
Xili 西丽 5 7
Lishan 丽山
Lishui 丽水
Xuefu Hospital 学府医院  7  
Nanshan Zhiyuan 南山智园
Changlingpi 长岭陂 5
Shenzhen North Station West Square 北站西广场 4 5 6 (via Shenzhen North)
  XS    GSH   China Railways.svg IOQ
Longhua
Minfeng Road 民丰路
Baishilong 白石龙 4
Zhangkeng 樟坑
Minbao 民宝
Huacheng 华城
Yinquan 银泉
Youfu 油福  25  
Songhe 松和  22  
Gangtou West 岗头西 Longgang

Related Research Articles

<span class="mw-page-title-main">Shenzhen Metro</span> Rapid transit system in Shenzhen

The Shenzhen Metro is the rapid transit system for the city of Shenzhen in Guangdong province, China. Extensions opened on 28 December 2022 put the network at 547.42 kilometres of trackage, operating on 16 lines with 369 stations. Shenzhen Metro is the 4th longest metro system in China and 4th longest in the world as of that date despite having only opened on 28 December 2004. By 2035 the network is planned to comprise 8 express and 24 non-express lines totaling 1,142 kilometres of trackage.

<span class="mw-page-title-main">Line 6 (Shenzhen Metro)</span>

Line 6, also known as the Guangming line of the Shenzhen Metro is in operation. Line 6 is part of the Phase III expansion of the Shenzhen Metro with a construction time frame scheduled for 2015–2019.

<span class="mw-page-title-main">Nanchang Metro</span>

Nanchang Metro, officially Nanchang Rail Transit, is a rapid transit system in Nanchang, Jiangxi, China. As of 2021, four lines are operational. The Metro opened for commercial operation in December 2015. The network is currently 128.3 km (79.7 mi) in length in December 2021 with 4 lines. A total length of 163 km (101.3 mi) of network is planned, with Line 5 which is currently under planning.

<span class="mw-page-title-main">Line 19 (Beijing Subway)</span> Metro line of Beijing Subway

Line 19 of the Beijing Subway is a rapid transit line in Beijing. It is 20.9 km (13.0 mi) in length and has 10 stations. It is fully underground.

<span class="mw-page-title-main">Line 11 (Beijing Subway)</span>

Line 11 of the Beijing Subway is a rapid transit line of the Beijing Subway. The line opened on December 31, 2021.

<span class="mw-page-title-main">Line 20 (Shenzhen Metro)</span>

Line 20 is a rapid transit line in the Shenzhen Metro system. The line connects Airport North with the Convention & Exhibition City.

Line 20 of the Beijing Subway, or Line R4 is a rapid transit line under planning in Beijing.

Line 15 of the Shenzhen Metro is a Phase V expansion metro line under construction, which will connect the districts of Bao'an, Nanshan and Qianhai for 32.2 kilometers and 24 stations. Construction started on 28 June 2023. The line is proposed to use 4 car and 6 car type A trains.

<span class="mw-page-title-main">Line 10 (Tianjin Metro)</span>

Line 10 of Tianjin Metro is a metro line in Tianjin, China.

Line 18 of the Shenzhen Metro is an express line under planning, which will connect across Shenzhen for 69.1 kilometers and 29 stations through the districts of Bao'an, Guangming, Guanlan, Pinghu, Longgang and Yantian. The first phase of Line 18 originally entered Phase V planning in September 2022, and will run from Shajing in Bao'an District to Baihua in Guangming District, with 8 stations and 18.7 kilometers of track, however planning has been put on hold since 31 March 2023. The line is proposed to use 6 car type A trains.

<span class="mw-page-title-main">Kengzi station</span> Metro station in Shenzhen, Guangdong, China

Kengzi station is a station on Line 14 of Shenzhen Metro in Shenzhen, Guangdong, China, which is opened on 28 October 2022. It is located at the east of the intersection of Pingshan Avenue and Guangzu North Road, Kengzi Subdistrict, Pingshan District. The station lies east-west along Pingshan Avenue.

<span class="mw-page-title-main">Pingshan Center station</span> Metro station in Shenzhen, Guangdong, China

Pingshan Center station is a station on Line 14 of Shenzhen Metro in Shenzhen, Guangdong, China, which is opened on 28 October 2022. It is located in Pingshan District.

<span class="mw-page-title-main">Pingshanwei station</span> Shenzhen Metro interchange station

Pingshanwei station is an interchange station for Line 14 and Line 16 of the Shenzhen Metro. It is located in Pingshan District. Line 14 platforms is opened on 28 October 2022 and Line 16 platforms opened on 28 December 2022.

<span class="mw-page-title-main">Silian station</span> Metro station in Shenzhen, Guangdong, China

Silian station is a station on Line 14 of Shenzhen Metro in Shenzhen, Guangdong, China, which is opened on 28 October 2022 It is located in Longgang District.

<span class="mw-page-title-main">Line 22 (Shenzhen Metro)</span> Future Shenzhen Metro line

Line 22 of the Shenzhen Metro is an express line under planning, which will connect the districts of Futian and Longhua for 38 kilometers and 23 stations. Construction is planned to begin in 2023. The first phase of Line 22 has entered Phase V planning, and will run from Shangsha in Futian District to Liguang in Longhua District, with 21 stations and 34.2 kilometers of track. The line is proposed to use 8 car type A trains. It is proposed to extend into Dongguan in long term planning.

Line 29 of the Shenzhen Metro is a line under planning, which will connect the districts of Nanshan, Bao'an and Guangming for 30.6 kilometers and 24 stations. Construction is planned to begin in 2023. The first phase of Line 29 has entered Phase V planning, and will run from Hongshuwan South in Nanshan District to Xingdong in Bao'an District, with 10 stations and 11.3 kilometers of track. The line is proposed to use 6 car type B trains.

Line 21 of the Shenzhen Metro is an express line under planning, which will connect across Shenzhen through the districts of Nanshan, Longhua and Longgang for 66 kilometers and 26 stations. The first phase of Line 21 originally entered Phase V planning in September 2022, and will run from Aobei to Longyuan in Longgang District, with 6 stations and 12.5 kilometers of track, however planning has been put on hold since 31 March 2023. The line is proposed to use 8 car type A trains.

Line 25 of the Shenzhen Metro is a line under planning, which will connect across Shenzhen through the districts of Luohu, Longhua, Longgang and Bao'an for 38.5 kilometers and 30 stations. Construction is planned to begin in 2023. The first phase of Line 25 has entered Phase V planning, and will run from Jihua Hospital in Longgang District to Shilong in Bao'an District, with 14 stations and 16.2 kilometers of track. The line is proposed to use 6 car type B trains.

Line 19 of the Shenzhen Metro is a line under planning, which will connect the districts of Longgang and Pingshan for 33 kilometers and 18 stations. Construction is planned to begin in 2023. The first phase of Line 19 has entered Phase V planning, and will run from Nantangwei to Julong in Pingshan District, with 12 stations and 12.5 kilometers of track. The line is proposed to use 6 car type B trains.

Line 32 of the Shenzhen Metro is a line under planning, which will run entirely in Dapeng New District from Xichong at the terminus of Line 8 to the town of Kuichong for approximately 9.5 kilometers. Construction is planned to begin in 2023.

References

  1. 多条地铁规划涉及宝安!深圳市城市轨道交通第五期建设规划公示. www.sznews.com. 2022-08-27.
  2. 新增13条地铁!深圳轨道交通第五期规划环评首次公示,速看. mp.weixin.qq.com. 2022-08-28.
  3. 地铁五期13条线路规划公布. www.sz.gov.cn. 2022-09-07.