Line 4 (Chennai Metro)

Last updated

Yellow Line (Line 4)
Overview
StatusUnder Construction
Termini
Connecting linesOperational (3):
Blue Line Green Line   Chennai MRTS  
Upcoming (2):
Purple Line Red Line
Stations(Under construction) 27 + 20 (planned) Total = 47
Service
Type Rapid transit
System Chennai Metro
Operator(s) Delhi Metro Rail Corporation (DMRC) [1]
Technical
Line length26.1 km (16.2 mi)
Number of tracks2
Character10.1 km (6.3 mi) Underground
16 km (9.9 mi) Elevated
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Electrification 25 kV 50 Hz AC overhead catenary
Route map

Contents

Lighthouse
BSicon tKBHFa yellow.svg
BSicon leer.svg
Kutchery Road
BSicon tHST yellow.svg
BSicon leer.svg
BSicon hCONTgq.svg
BSicon MSTRq.svg
BSicon hSTRq.svg
BSicon tSTR yellow.svg
BSicon hSTR+r.svg
Thirumayilai Purple Line
BSicon tCONTgq violet.svg
BSicon tSTRq violet.svg
BSicon tINT yellow.svg
BSicon HUB2.svg
BSicon tSTRq violet.svg
BSicon hSTR.svg
BSicon HUBc3.svg
BSicon tSTRq violet.svg
BSicon tCONTfq violet.svg
BSicon HUBc1.svg
BSicon tSTR yellow.svg
BSicon HUB4.svg
BSicon hSHSTl.svg
BSicon hCONTfq.svg
Alwarpet
BSicon tHST yellow.svg
BSicon leer.svg
Bharathidasan Road
BSicon tHST yellow.svg
BSicon leer.svg
Boat Club
BSicon tHST yellow.svg
BSicon leer.svg
Nandanam on Blue Line
BSicon utCONTgq.svg
BSicon utXBHF-Rq.svg
BSicon utSTRq.svg
BSicon tSTR yellow.svg
BSicon utCONTfq.svg
Nandanam
BSicon XPLTl.svg
BSicon tXBHF-R yellow.svg
Panagal Park
BSicon tBHF yellow.svg
BSicon leer.svg
Kodambakkam
BSicon HUB2.svg
BSicon tINT yellow.svg
BSicon HUBc3.svg
BSicon CONTgq.svg
BSicon STRq.svg
BSicon HUBc1.svg
BSicon tSTR yellow.svg
BSicon HUB4.svg
BSicon SBHFq.svg
BSicon CONTfq.svg
BSicon htSTRe yellow.svg
Kodambakkam Powerhouse
BSicon hHST yellow.svg
BSicon leer.svg
Vadapalani on Green Line
BSicon fhCONTgq.svg
BSicon fhBHFq.svg
BSicon hXBHF-Rq.svg
BSicon MSTR.svg
BSicon hSTR yellow.svg
BSicon fhSTRq.svg
BSicon fhCONTfq.svg
Vadapalani
BSicon XPLTl.svg
BSicon hXBHF-R yellow.svg
Saligramam
BSicon hHST yellow.svg
BSicon leer.svg
Saligramam Warehouse
BSicon hHST yellow.svg
BSicon hCONTg red.svg
Alwarthirunagar Red Line
BSicon hBHF-L yellow.svg
BSicon hBHF-R red.svg
Valasaravakkam Red Line
BSicon hBHF-L yellow.svg
BSicon hBHF-R red.svg
Karambakkam Red Line
BSicon hBHF-L yellow.svg
BSicon hBHF-R red.svg
Alapakkam Red Line
BSicon hBHF-L yellow.svg
BSicon hBHF-R red.svg
Porur Junction
BSicon hBHF yellow.svg
BSicon hCONTf red.svg
Porur Bypass
BSicon hHST yellow.svg
BSicon leer.svg
BSicon RP4e.svg
BSicon hSKRZ-G4 yellow.svg
BSicon RP4w.svg
BSicon leer.svg
Thelliyaragaram
BSicon hHST yellow.svg
BSicon leer.svg
Iyyapanthangal
BSicon hHST yellow.svg
BSicon leer.svg
Kattupakkam
BSicon hHST yellow.svg
BSicon leer.svg
Kumananchavadi
BSicon hHST yellow.svg
BSicon leer.svg
Karayanchavadi
BSicon hHST yellow.svg
BSicon leer.svg
Mullaithottam
BSicon hHST yellow.svg
BSicon leer.svg
BSicon BUS2.svg Poonamallee
BSicon hBHF yellow.svg
BSicon leer.svg
Poonamallee Depot
BSicon YRDeq.svg
BSicon hABZgr yellow.svg
BSicon leer.svg
BSicon leer.svg
BSicon RP4e.svg
BSicon hSKRZ-G4 yellow.svg
BSicon RP4w.svg
BSicon leer.svg
Poonamallee Bypass
BSicon hHST yellow.svg
BSicon leer.svg
Planned
BSicon exhCONTf yellow.svg
BSicon leer.svg
Nazarathpet
BSicon hPORTALg.svg
BSicon exhHST yellow.svg
Chembarambakkam
BSicon exhHST yellow.svg
Kuthambakkam Bus Terminus BSicon BUS2.svg
BSicon exhHST yellow.svg
Samathuvapuram
BSicon exhHST yellow.svg
Chettipedu
BSicon exhHST yellow.svg
Thandalam
BSicon exhHST yellow.svg
Irungattukottai SIPCOT
BSicon exhHST yellow.svg
BSicon RP4e.svg
BSicon exhSKRZ-G4 yellow.svg
BSicon RP4w.svg
Pennalur
BSicon exhHST yellow.svg
Sriperumbudur
BSicon exhBHF yellow.svg
Pattunool Chatram
BSicon exhHST yellow.svg
Irungulam Industrial Estate
BSicon exhHST yellow.svg
Mambakkam
BSicon exhHST yellow.svg
Tirumangalam
BSicon exhHST yellow.svg
Sunguvarchatiram (RRTS Aiga railtransportation 25.svg)
BSicon HUBaq.svg
BSicon exhKBHFe yellow.svg
BSicon HUBeq.svg
BSicon exhKBHFa.svg
BSicon FLUG.svg Parandur RRTSAiga railtransportation 25.svg
BSicon exhBHF.svg
BSicon exhCONTf.svg

The Yellow Line or Line 4 is one of the under construction lines of Chennai Metro Phase-II stretching from Lighthouse to Poonamallee Bypass. The line will consist of 27 stations, out of which nine will be underground and 18 will be at grade or elevated. The colour code of the corridor was changed from Orange to Yellow, as per latest CMRL's latest Phase-II map. [2]

Planning and construction

Phase II

The construction of the first phase of Chennai Metro started in June 2009. [3] Commercial operations started on the green line in June 2015. [4] [5] [6] On 10 February 2019, the extension of blue line was opened, completing the first phase of the metro. [7]

In July 2016, Government of Tamil Nadu announced that the second phase would have three lines totaling 104 km (65 mi) in length with 104 stations. [8] [9] Two corridors would extend from Madhavaram connecting with Siruseri and Sholinganallur respectively with the third corridor connecting Koyambedu with Lighthouse. In July 2017, the state government announced an extension in Phase II, involving an extension of line four from Lighthouse up to Poonamallee with an intersection with the Madhavaram–Sholinganallur line at Alwarthirunagar. The line will extend to 26.1 km (16.2 mi) with 16 km (9.9 mi) elevated and 10.1 km (6.3 mi) underground. It will consist of 30 stations including 12 undergrounds stations. [10] [11] The stations for the second phase were designed to be smaller than the existing stations operational in the first phase. [12]

On 20 November 2020, foundation stone for the second phase was laid and construction commenced. [13] In November 2022, Alstom was awarded the contract to supply metro coaches for the phase II expansion. [14] In May 2023, CMRL announced a revised plan for the second phase revising the station count on the fourth line to 27. [15] As per the final plan, the fourth line will extend for 26.1 km (16.2 mi). [16]

Chennai Metro - Phase II [17]
Line NameTerminalsLength (km)StationsStatus
Yellow Line Poonamallee Bypass Lighthouse 26.127Under construction

The second phase is estimated to cost 63,246 crore (US$7.5 billion) of which initially 4,710 crore (US$560 million) was loaned by JICA. [10] [18] [19] On 14 February 2021, Prime Minister of India announced that the government has set aside 63,000 crore (US$7.5 billion) for the construction of phase II and further extension. [20]

Phase II extension

In 2022, the state government proposed an extension plan for the fourth line from Poonamalee to Parandur, covering an approximate 43.6 km (27.1 mi). [21] In early 2024, feasibility report was submitted by CMRL for the proposed expansion of the line, green lighting the same. [22] [23]

Chennai Metro - Phase II Extension [24]
LineTerminalsLengthStationsStatus
Yellow Line Poonamallee Parandur 43.6 km (27.1 mi)20Planned

Stations

Yellow Line
S.NoStation Name [17] Expected Opening [25] ConnectionsStation Structure
English Tamil Station TypePlatform Level Type
1 Lighthouse கலங்கரை விளக்கம்April 2028UndergroundIsland
2 Kutchery Road கச்சேரி சாலைApril 2028UndergroundIsland
3 Thirumayilai திருமயிலைApril 2028Aiga railtransportation 25.svg Chennai MRTS (Thirumayilai)
  Purple Line   (Under Construction)
UndergroundIsland
4 Alwarpet ஆழ்வார்பேட்டைApril 2028UndergroundIsland
5 Bharathidasan Road பாரதிதாசன் சாலைApril 2028UndergroundIsland
6 Boat Club படகு குழாம்April 2028UndergroundIsland
7 Nandanam நந்தனம்April 2028  Blue Line  UndergroundIsland
8 Panagal Park பனகல் பூங்காFebruary 2027UndergroundIsland
9 Kodambakkam கோடம்பாக்கம்February 2027Aiga railtransportation 25.svg South Line, Chennai Suburban (Kodambakkam)UndergroundIsland
10 Kodambakkam Powerhouse கோடம்பாக்கம் பவர்ஹவுஸ்July 2026ElevatedSide
11 Vadapalani வடபழனிJuly 2026  Green Line  ElevatedSide
12 Saligramam சாலிகிராமம்July 2026ElevatedIsland
13 Saligramam Ware House சாலிகிராமம் கிடங்குJuly 2026ElevatedIsland
14 Alwarthiru Nagar ஆழ்வார் திருநகர்July 2026  Red Line   (Under Construction)ElevatedIsland
15 Valasaravakkam வளசரவாக்கம்July 2026  Red Line   (Under Construction)ElevatedIsland
16 Karambakkam காரம்பாக்கம்July 2026  Red Line   (Under Construction)ElevatedIsland
17 Alapakkam Junction ஆலப்பாக்கம் சந்திப்புJuly 2026  Red Line   (Under Construction)ElevatedIsland
18 Porur போரூர்December 2025ElevatedSide
19 Porur Bypass போரூர் புறவழிச்சாலைDecember 2025ElevatedIsland
20 Thelliyaragaram தெள்ளியார் அகரம்December 2025 Iconoir hospital.svg Sri Ramachandra Medical CollegeElevatedIsland
21 Iyyapanthangal ஐயப்பன்தாங்கல்December 2025 BSicon BUS2.svg Iyyapanthangal Bus TerminusElevatedIsland
22 Kattupakkam காட்டுப்பாக்கம்December 2025ElevatedIsland
23 Kumananchavadi குமணன்சாவடிDecember 2025ElevatedIsland
24 Karayanchavadi கரையான்சாவடிDecember 2025ElevatedIsland
25 Mullaithottam முல்லைத்தோட்டம்December 2025ElevatedIsland
26 Poonamallee பூவிருந்தவல்லிDecember 2025 BSicon BUS2.svg Poonamallee Bus TerminusElevatedSide
27 Poonamallee Bypass பூவிருந்தவல்லி புறவழிச்சாலைDecember 2025ElevatedSide

§ under construction

See also

References

  1. Sampath, Nirupa (3 April 2025). "Chennai Metro Rail outsources phase 2 to Delhi Metro". DT Next. Retrieved 18 April 2025.
  2. PHASE-2 MAP (PDF) (Report). Chennai Metro Rail Limited . Retrieved 7 May 2025.{{cite report}}: CS1 maint: url-status (link)
  3. "Work commences on Chennai Metro". Projects Today. 11 June 2009. Archived from the original on 25 August 2017. Retrieved 16 August 2010.
  4. "Chennai Metro one stop short of dream run". Deccan Chronicle . 31 August 2014. Archived from the original on 4 March 2016. Retrieved 6 June 2016.
  5. "Conditional clearance for Metro Rail". The Hindu . 28 April 2015. Archived from the original on 14 January 2016. Retrieved 7 June 2016.
  6. Chennai Metro Newsletter - August 2015 (PDF) (Report). Chennai Metro. 29 June 2015. Archived (PDF) from the original on 20 October 2023. Retrieved 7 June 2023.
  7. Simhan, TE Raja (10 February 2019). "PM Modi inaugurates Chennai Metro Rail's final leg". The Hindu Businessline. Archived from the original on 26 October 2020. Retrieved 13 February 2019.
  8. Sekar, Sunitha (2 August 2016). "1800 km, 180 stations: Unveiling Phase II of Metro". The Hindu . Archived from the original on 26 December 2016. Retrieved 24 January 2017.
  9. Sekar, Sunitha. "Detailed project report for Phase II of Metro Rail ready". The Hindu . Archived from the original on 27 December 2016. Retrieved 24 January 2017.
  10. 1 2 "Project status of Chennai Metro". Chennai Metro Rail Limited. Archived from the original on 26 September 2016. Retrieved 16 August 2010.
  11. "Metro's second phase to go up to Poonamallee". The Hindu . 20 July 2017. Archived from the original on 26 February 2020. Retrieved 1 October 2017.
  12. U, Tejonmayam (28 December 2016). "Chennai: Metro rail to trim stations under phase 2". The Times of India . Archived from the original on 8 February 2017. Retrieved 24 January 2017.
  13. "Amit Shah to lay foundation for Chennai Metro's phase II project". The Hindu . 17 November 2020. Archived from the original on 28 April 2024. Retrieved 1 December 2023.
  14. "Alstom wins €98 million contract to design and manufacture 78 metro coaches for Chennai Metro Phase-II" (Press release). Alstom. 11 November 2022. Archived from the original on 16 December 2023. Retrieved 1 December 2023.
  15. "Chennai metro scraps nine stations in phase 2". The Times of India . 14 May 2023. Retrieved 1 May 2024.
  16. "Phase II– S98 (Anaimalai) TBM Breakthrough at Venugopal Nagar Shaft" (PDF) (Press release). Chennai Metro Rail Limited. 7 June 2023. Retrieved 1 May 2024.
  17. 1 2 Chennai Metro rail phase II (PDF) (Report). Chennai Metro Rail Limited . Retrieved 1 May 2024.
  18. "Phase-II Chennai metro project to cost Rs 36,000 cr". Business Standard. 2 March 2014. Archived from the original on 16 December 2023. Retrieved 1 December 2023.
  19. "JICA extends ODA Loan of INR 4710 Cr for Chennai Metro Rail Project Phase 2 (II)". JICA. 21 June 2022. Archived from the original on 16 December 2023. Retrieved 1 December 2023.
  20. Dipak K, Dash. "Ground work for Chennai metro rail phase-2 hit". Times of India . Archived from the original on 18 February 2021. Retrieved 19 February 2021.
  21. "Detailed feasibility report for Chennai Metro Rail's Phase 2 extension to be ready in three months". The Hindu . 26 March 2023. Archived from the original on 28 April 2024. Retrieved 1 December 2023.
  22. "CMRL submits Detailed Feasibility Reports for Phase II project extension". The Financial Express . 22 September 2023. Archived from the original on 29 April 2024. Retrieved 30 April 2024.
  23. "Chennai Metro Rail submits report to extend connectivity all the way to second airport site at Parandur". The Hindu . 4 January 2024. Archived from the original on 30 April 2024. Retrieved 30 April 2024.
  24. "Plans for 44-km metro line to parandur airport likely within a year, may have 19 stations". Times Now . 22 April 2024. Archived from the original on 2 May 2024. Retrieved 2 May 2024.
  25. Sekar, Sunitha (4 March 2025). "By July 2026, Chennai Metro Rail will extend connectivity till Kodambakkam via double decker stretch". The Hindu. ISSN   0971-751X . Retrieved 22 March 2025.