Mendip Rail Ltd is an independent freight operating railway company in Great Britain. It is a joint venture composed of the rail-operation divisions of Aggregate Industries (formerly Foster Yeoman) and Hanson Aggregates (previously ARC).
The company operates aggregate trains from the quarries of the Mendip Hills in South-West England, to London and South-East England. The Foster Yeoman quarries are at Torr Works and Dulcote Quarry, while Hanson has plants at Batts Combe Quarry and Whatley Quarry.
The company operates four Class 59/0 diesel locomotives owned by Aggregate Industries and four Class 59/1 locomotives owned by Hanson. In addition, two SW1001 Switchers are owned and operated at Whatley and Merehead quarries. It owns Merehead Traction Maintenance Depot (Merehead TMD) where the eight locomotives are allocated. They can also be seen at Hither Green TMD or Eastleigh Works where they receive heavy maintenance.
Foster Yeoman purchased its own fleet of 140 12-ton wagons in 1923, to take advantage of the fact that the Great Western Railway line ran adjacent to Dulcote Quarry. When the Torr Works opened in the 1960s, a rail terminal – named Merehead after the old quarry – was constructed to support the new quarry and was opened in August 1970, served by a spur from the East Somerset branch line which joins the main line at Witham. Further expansion was soon needed, with a chord being added between the terminal and the branch line in 1973. [1]
British Rail shunting and mainline locomotives were used initially, but in 1972 Foster Yeoman bought the first of several Class 08 shunting engines. The company also has a General Motors EMD SW1001 switching locomotive which was purchased in 1980. [2]
As a result of poor reliability of the various locomotives used by British Rail to haul stone trains from the West Country (with availability of the Class 56 locomotives from May 1984 as low as 30%, and only 60% of trains running on time), [3] Foster Yeoman began negotiations with British Rail to improve service. Having already supplied its own wagons (with a reliability level of 96%) Foster Yeoman suggested to British Rail that it could operate its own locomotives, which would be the first privately-owned engines to run on British rail tracks. British Rail's problem was the hard tie-in and control of the rail unions, but nevertheless BR accepted the principle. [4] [5]
Foster Yeoman issued a tender document which requested 95% reliability. [6] General Motors' bid was ultimately successful, in particular because their proposed design, derived from the EMD SD40-2, was equipped with the well-proven Super Series creep control, which allows superior traction at very low speeds. This, it was found, would enable a single locomotive to haul Foster Yeoman's 4,300 tonne stone trains, whilst two Class 56 or Class 58 engines would be needed to move the same load. This enabled Foster Yeoman to reduce its requirement from the original six locomotives to four. [6]
The contract with General Motors was signed in November 1984 and the new locomotives, built at the GM plant in La Grange, Illinois, were shipped across the Atlantic in January 1986. [7] The JT26CW-SS, [8] newly designated as British Rail Class 59/0, had a cab layout taken from the Class 58, to make driver assimilation easier, and to meet the British loading gauge a considerable amount of redesign work and various compromises were required from the original GM prototype. [4] Once in the United Kingdom, further tests were undertaken before Foster Yeoman's new locomotives entered service in February 1986. [3] They were officially named in a ceremony at Merehead on 28 June 1986. [9]
The Class 59s delivered 99% reliability, leading Foster Yeoman to order a fifth engine in 1988. [10] In their first ten years of operation the five locomotives between them hauled over 50 million tonnes of aggregates away from Merehead.
The four former-Yeoman locomotives still operated by Mendip Rail are:
59003 Yeoman Highlander was exported to Germany in 1997, [11] renumbered as 259 003, and operated by Yeoman/Deutsche Bahn (DB), pulling stone trains. It has since been sold on to Heavy Haul Power International where it is still working on coal trains and pulls the highest train weight of any locomotive presently in Germany. [12] On 19 August 2014, GB Railfreight (GBRF) confirmed it had purchased 59003 and planned to return it to the UK to haul GBRF freight trains by the end of 2014. [13]
On 26 May 1991 Kenneth J Painter (59005) (with assistance from Yeoman Endeavour) set the European haulage record, with a stone train weighing 11,982 tonnes and 5,415 feet (1,650 m) long. However, the so-called 'mega train' experiment was not fully successful, as a coupling in the centre of the train broke. [14]
The four Class 59/1 locomotives owned by Hanson Aggregates (parent company of the former owner ARC) are similar to the Class 59/0 locomotives of Foster Yeoman and were built by General Motors Diesel Division at its London, Ontario plant in 1990. The main differences are a revised layout for the headlights and marker lights, and modifications to the suspension to permit the maximum speed to be increased to 75 mph (121 km/h) (if required in the future) with the fitting of yaw dampers.
The four Hanson locomotives operated by Mendip Rail are:
Both Foster Yeoman and ARC operated shunting locomotives at their quarries which are managed by Mendip Rail. Forster Yeoman originally used second hand British Rail Class 08s but later bought an EMD SW1001, a precursor to their buying the fleet of Class 59s. ARC operated modern Thomas Hill Vanguard and Steelman shunters. After Mendip Rail was established, some locomotives have been moved between the two quarries and also the Foster Yeoman terminal at Isle of Grain. [15]
Number | Name | Type | Built | In service | Notes |
---|---|---|---|---|---|
11 | Dulcote | Class 08 | 1952 | 1972-1982 | BR D3002, now preserved on the Plym Valley Railway [16] [15] |
22 | Merehead | Class 08 | 1952 | 1973-1982 | BR D3003, later displayed at Wanstrow but cut up in 1991 [16] [15] |
33 | Mendip | Class 08 | 1953 | 1975-2008 | BR 08032, now preserved on the Watercress Line [16] [15] |
44 | Western Yeoman II | SW1001 | 1980 | 1980- | |
55 | Class 08 | 1959 | 1989- | BR 08650 [17] [15] | |
66 | Class 08 | 1959 | 1993- | BR 08652 [17] [15] | |
77 | Pride of Whatley | Steelman [15] | 1987 | ?- | |
88 | Vanguard [15] | ? | ?- | ||
120 | Kenneth John Whitcombe [18] | SW1001 | ? | ?- |
To better manage their fleet availability and scale needs, Hanson ARC and Foster Yeoman founded Mendip Rail in 1993. [19] The assets are still owned by the parent companies and the staff are seconded to Mendip Rail.
The eight locomotives display four different liveries:
Mendip Rail's class 59s work services between various destinations which have changed over time according to demand and specific contracts. They have worked regularly over southern railway tracks, for example to the former Foster Yeoman terminals at Eastleigh and Botley, as well as delivering aggregates for construction work on the Thames Barrier, Second Severn Crossing, Channel Tunnel and most recently Heathrow Terminal 5, which required 3 million tonnes of stone. [20] [21]
As of 2010 [update] , Mendip Rail hauled about 4.5 million tonnes of stone from Torr Works each year, and about 2.5 million tonnes from Whatley Quarry. [21]
Services are operated in partnership with Freightliner, using Freightliner's fourteen Class 59 locomotives, comprising 59/0 (four), 59/1 (four) and 59/2 (a fleet of six built for National Power in 1994 and 1995). The operations are also supported with around ten Class 66s.[ citation needed ] The class 59 locomotives, along with the Mendip Rail contract, were handed over from DB Cargo on 3 November 2019. [22]
While working the 6A20 Whatley Quarry to Acton (West London) stone train, 59103 Village of Mells and the first ten hopper wagons derailed at 23:20 on 12 September 2000 between Great Elm Tunnel and Bedlam Tunnel on the single track branch line to the Hanson Quarry at Whatley. [4] The locomotive and the first two hoppers rolled, and 59103 came to rest on the parapet of a small bridge on the driver's side (left by direction of travel) with the trailing bogie partially torn off by the following hopper car. The locomotive was pulled upright on 19 September 2000 and removed to Whatley Quarry where an initial assessment of the damage was made and repairs made to make the locomotive safe for removal by road.
Shortly before 17:30 [23] on 6 October 2008 [24] : 4 a mainline engine, which had earlier departed the Whatley Quarry depot, was hit from behind by a runaway train on the quarry branch line at Bedlam, near Great Elm. [23]
The runaway train consisted of a shunter hauling sixteen loaded stone wagons, weighing a total of 1,700 tones. [24] : 1 It had been engaged in marshalling duties with another train in the quarry sidings, when there was a mechanical failure of the handle controlling the train's main air brake. The crew had attempted to stop the train by applying the shunter's direct air brake; however, this was overcome by the momentum of the moving wagons. The Driver's Safety Device (deadman's pedal) in the shunter was disabled by a feature that allowed the driver to leave his seat to observe the passage of the train provided that the shunter's direct air brake had been applied. Had that brake been released and the deadman's pedal allowed to operate, the train's main air brakes would have applied automatically and stopped the train. Trap points, which might have prevented the runaway from leaving the sidings and joining the branch line, had not been reset after the departure of the mainline train. [24]
Whilst it had been travelling at under 6.5 km/h (4 mph) [24] : 1 at the time of the brake failure, the shunter and wagons ran away down a gradient and had reached a speed of 41 km/h (25.5 mph) [24] : 1 by the time they collided with the mainline locomotive (which was travelling at 16 km/h (10 mph) [24] : 1 in the same direction), over 1.5 kilometres (1 mi) [24] : 1 farther down the line. The shunter's crew had abandoned the locomotive before the impact and there were no serious injuries as a result of the accident. [24] : 1
The shunter, which by the time of the impact had already suffered damage due to passing through a tunnel which was too low for it, was derailed, as were the first five stone wagons; four of those wagons completely left the branch line and travelled down a steep embankment. The shunter suffered significant, but not irreparable, damage, and there was only minor damage to the mainline locomotive. A section of track was completely destroyed. [24] : 2
The Rail Accident Investigation Branch (RAIB) reviewed the accident and decided that it did not warrant undertaking a full investigation. The RAIB did recommend that an additional "brake of last resort" be fitted to the shunter and to similar industrial locomotives. The RAIB also noted the need to consider the use of self-restoring trap points for the quarry sidings. [24] : 4
At approximately 02:40 the two locomotives hauling the 7A91 Merehead Quarry to Acton Terminal Complex train derailed at East Somerset Junction between Westbury and Castle Cary. [25]
At 17:50, 7Z15, the 1705 Merehead Quarry to Acton Terminal Complex train, derailed at East Somerset Junction between Westbury and Castle Cary. [26] Rail Accident Investigation Branch (RAIB) inspectors deployed within the hour. [27]
A switcher or shunter, is a type of small locomotive used for manoeuvring railroad cars inside a rail yard in a process known as switching (US) or shunting (UK). Switchers are not intended for moving trains over long distances but rather for assembling trains in order for another locomotive to take over. They do this in classification yards. Switchers may also make short transfer runs and even be the only motive power on branch lines and switching and terminal railroads. The term can also be used to describe the workers operating these engines or engaged in directing shunting operations. Switching locomotives may be purpose-built engines, but may also be downgraded main-line engines, or simply main-line engines assigned to switching. Switchers can also be used on short excursion train rides.
The Great Central Railway (GCR) is a heritage railway in Leicestershire, named after the company that originally built this stretch of railway. It runs for 8.25 miles (13.28 km) between the town of Loughborough and a new terminus in the north of Leicester. It has period signalling, locomotives and rolling stock.
The British Rail Class 08 is a class of diesel-electric shunting locomotives built by British Railways (BR). As the standard BR general-purpose diesel shunter, the class became a familiar sight at major stations and freight yards. Since their introduction in 1952, however, the nature of rail traffic in Britain has changed considerably. Freight trains are now mostly fixed rakes of wagons, and passenger trains are mostly multiple units or have Driving Van Trailers, neither requiring the attention of a shunting locomotive. Consequently, a large proportion of the class has been withdrawn from mainline use and stored, scrapped, exported or sold to industrial or heritage railways.
Freightliner Group is a rail freight and logistics company headquartered in the United Kingdom. It is presently a wholly owned subsidiary of the American holding company Genesee & Wyoming.
The British Rail Class 73 is a British electro-diesel locomotive. The type is unusual in that it can operate from the Southern Region's 650/750 V DC third-rail or an on-board diesel engine to allow it to operate on non-electrified routes. This makes it very versatile, although the diesel engine produces less power than is available from the third-rail supply so the locomotives are rarely operated outside of the former Southern Region of British Rail. Following the withdrawal and scrapping of the more powerful Class 74 electro-diesels in 1977, the Class 73 was unique on the British railway network until the introduction of the Class 88 electro-diesels in 2017. Ten locomotives have been scrapped.
The EMD SW1001 is a 1,000-horsepower (750 kW) diesel locomotive for industrial switching service built by General Motors' Electro-Motive Division between September 1968 and June 1986. A total of 230 were constructed, mainly for North American railroads and industrial operations.
A cable railway is a railway that uses a cable, rope or chain to haul trains. It is a specific type of cable transportation.
The Class 59 3,300 bhp (2,460 kW) Co-Co diesel-electric locomotives were built between 1985 and 1995 by Electro-Motive Diesel for operation in Great Britain. A total of 15 locomotives were built for three different operators.
St Blazey engine shed is located in Par, Cornwall, United Kingdom, although it is named after the adjacent village of St Blazey. It was built in 1874 as the headquarters of the Cornwall Minerals Railway but for many years was a depot of the Great Western Railway. The current depot operator is DB Cargo and the depot TOPS code is BZ.
Foster Yeoman Limited, based near Frome, Somerset, England, was one of Europe's largest independent quarrying and asphalt companies. It was sold to Aggregate Industries in 2006.
Hither Green (London) Traction Maintenance Depot or Hither Green (London) TMD is a railway depot used for the maintenance and servicing of freight trains adjacent to the Hither Green marshalling yard. The depot is a hub for moving freight around southeast England. Hither Green TMD is owned and operated by DBS. The official depot code is HG. In steam days the shed code was 73C.
Cranmore is a village and civil parish east of Shepton Mallet, in the Mendip district of Somerset, England. The parish includes the hamlets of Waterlip, East Cranmore and Dean.
Whatley Quarry, grid reference ST731479 is a limestone quarry owned by Hanson plc, near the village of Whatley on the Mendip Hills, Somerset, England.
Gurney Slade quarry, grid reference ST626497 is a limestone quarry near Gurney Slade between Binegar and Holcombe, on the Mendip Hills, Somerset, England.
Dulcote Quarry is a disused limestone quarry at Dulcote, near Wells on the Mendip Hills, Somerset, England. The quarry measures around 600 metres (2,000 ft) from West to East and around 350 metres (1,150 ft) from North to South, with an area of 18 acres (7.3 ha), which is surrounded by 80 acres (32 ha) of woodland.
Torr Works quarry, grid reference ST695446 is a limestone quarry at East Cranmore, near Shepton Mallet on the Mendip Hills, Somerset, England. The quarry was formerly known as Merehead, a name which has been retained for its rail depot on the opposite side of the A361 road.
The British Rail Class 70 is a Co-Co mainline freight GE PowerHaul locomotive series manufactured by General Electric in Erie, Pennsylvania. They are operated in the United Kingdom by Freightliner and Colas Rail. These locomotives replaced the Class 59 as having the highest tractive effort of any Co-Co Diesel locomotive in use in the United Kingdom when they were introduced.
The Indian locomotive class WCAM-1 is a class of Bi-current electric locomotives that was developed in 1973 by Chittaranjan Locomotive Works for Indian Railways. The model name stands for broad gauge (W), DC Current (C), AC Current (A), Mixed traffic (M) locomotive, 1st generation (1). They entered service in March 1973. A total of 53 WCAM-1 were built at CLW between 1973 and 1979, which made them the most numerous class of mainline dual-power AC-DC electric locomotive.
The Hamworthy Freight Branch is a short standard gauge line from Hamworthy Station to the Hamworthy side of Poole Harbour.
The railway network in Great Britain has been used to transport goods of various types and in varying volumes since the early 19th century. Network Rail, which owns and maintains the network, aims to increase the amount of goods carried by rail. In 2015–16 Britain's railways moved 17.8 billion net tonne kilometres, a 20% fall compared to 2014–15. Coal accounted for 13.1% of goods transport in Britain, down considerably from previous years. There are no goods transported by railway in Northern Ireland.