The British Rail Class 56 is a type of diesel locomotive designed for heavy freight work. It is a Type 5 locomotive, with a Ruston-Paxman power unit developing 3,250 bhp (2,423 kW), and has a Co-Co wheel arrangement. Enthusiasts nicknamed them "Gridirons" (or "Grids" for short), due to the grid-like horn cover on the locomotive's cab ends fitted to nos. 56056 onwards. Under its Romanian railway factory nomenclature, the locomotive was named Electroputere LDE 3500, with LDE coming from Locomotivă Diesel-Electrică (Diesel-Electric Locomotive) and the 3500 being the planned horsepower output.[ citation needed ]
The Class 56 fleet was introduced between 1976 and 1984, a total of 135 examples were manufactured. The first 30 locomotives (56001 - 56030, factory classification LDE3500) were built by Electroputere in Romania, but these typically suffered from poor construction standards and many were withdrawn from service early for extensive rebuilding before re-entering revenue service. [3] The remaining 105 locomotives were built by British Rail Engineering Limited (BREL) at Doncaster Works (56031 to 56115) and Crewe Works (56116 to 56135).
During the early 1970s, it became clear to British Rail planners that a new Type 5 locomotive to handle heavy freight services would be needed. However, ambitions to produce such a fleet were somewhat hamstrung by cutbacks at many of Britain's major railway workshops, having lost many skilled staff through multiple restructurings and cost saving drives; according to railway author Rodger Bradley, such moves proved to have come at a substantial long term cost to the nation's railway engineering capabilities. [4]
Accordingly, in 1974, BR placed an order for 60 freight locomotives, which were originally intended to be separately constructed in two batches of 30 at BREL's Doncaster Works and Brush Traction, Loughborough respectively. [5] [6] However, Brush had already reached the maximum capacity of their Loughborough site via several unrelated projects, making it unrealistic to perform the work in-house as had been foreseen. [4] To overcome its constraints, the company's managers opted to subcontract its batch to the Romanian locomotive manufacturer Electroputere. [7]
On 29 April 1977, the first Class 56 locomotive to be constructed by Electroputere was handed over to British Rail, having been transported from Romania by ship via the port of Harwich. [4] At one point, it was reportedly planned to deliver 20 locomotives each year; however, this ambitious schedule did not come to pass without consequence. The 30 Romanian locomotives (Nos. 56 001 – 56 030) were found to have a relatively poor build quality; to effectively address this, the majority had to be withdrawn from service for extensive rebuilding within their first few years of operation, after which they were re-introduced to service with better performance. [4]
At an early stage of the programme, BR had indicated its intention to place a follow-on order for the type following the delivery of the first 30 locomotives. [4] Accordingly, the number ordered was increased to 135 and they were numbered as follows:
BREL's Doncaster Works were in heavy demand at this time and its resources would be stretched to meet these targets due to a lack of skilled personnel to manufacture mechanical components. [4] Instead the Ashford, Eastleigh and Swindon Works produced sub-assemblies; roofs, fuel tanks and cab frames were produced at Ashford, while cab desks were built at Eastleigh, and radiator housings were supplied from Swindon. [4] Final assembly was transferred from Doncaster Works to Crewe Works, allowing Doncaster to commence work on the new Class 58 heavy freight locomotive. [4]
As a consequence of poor experiences with the early Romanian-built members of the class, the subsequent locomotives featured significant modifications. [4] It had been largely due to the initially negative experiences with the Class 56, which had caused dissatisfaction amongst several of British Rail's freight customers, [8] that BR officials had initiated work on the Class 58 and then the Class 60. [9] [10]
This section needs additional citations for verification .(December 2024) |
The Class 56 is a heavy freight-orientated diesel-electric locomotive. Upon its introduction, the type arguably represented the first of the "second generation" of British diesel locomotives. When specifying its requirements for the Class 56, BR stipulated that its bodyshell design and many mechanism parts would be from Brush Traction's existing Class 47 design, minus some features such as the obsolete headcode panel. [4] Accordingly, it features a stress-skin manner of construction that was paired with an all-welded monocoque superstructure assembly.
The engine and electrical systems were new. The engine is a single Ruston-Paxman-built power unit, the final development of the English Electric CSVT engine, following on from the 16CSVT used in the Class 50.[ citation needed ] Their changes included significantly uprated turbochargers, gear-driven camshafts in place of the timing chain, and uprated cylinder heads, fuel pumps and injectors. The engine was nominally rated at 3,520 hp (2,620 kW), but was set at 3,250 hp (2,420 kW) for rail use.[ citation needed ]
One key advance in the Class 56 was the use of self-exciting alternators rather than direct current (DC) generators for the generation of both traction current and auxiliary supply. This change reportedly results in the power unit being considerably more robust, as well as greatly reducing the risk of flash-overs and other earth-related faults. Traction supply was rectified since the type employs DC traction motors. Much of the auxiliary apparatus, such as the compressors and traction motor blowers, were powered via the unrectified 3-phase AC output of the auxiliary alternator, and therefore run at a speed proportional to engine r.p.m.[ citation needed ]
Another key design change started on the Class 56 was its braking system; it was the first diesel locomotive operated by British Rail to be built only with air train brakes, specifically the Davies and Metcalfe E70 system. Earlier locomotives had variously been fitted with vacuum train brakes or an often complex dual-braking arrangement.[ citation needed ]
This section needs additional citations for verification .(December 2024) |
During its service life, the Class 56 has proved to be a strong and capable locomotive, being noticeably less prone to wheelslip than the newer Class 58s. However, the type's maintenance needs were relatively high even amongst its contemporaries, such as the Class 58. [9] Notwithstanding bouts of significant investment into the Class 56 during the 1990s by operators such as Transrail and Loadhaul, the locomotive has proven to be somewhat uneconomic to operate in comparison to more modern types, such as the Class 66, in terms of availability or maintenance costs. This disadvantage led to the majority of the fleet being withdrawn during the early twenty-first century. [4]
On 4 August 1976, 56001 and 56002 were loaded for shipping from Zeebrugge to Harwich. [11] They were towed from Harwich to Tinsley on 7 August. [11] Initial trials were conducted on the Settle-Carlisle Line. [12] Subsequent examples (of the Romanian deliveries) went to Barrow Hill depot for preparation and subsequent commissioning on test trains from Tinsley, usually to Peterborough West Yard. The test train consisted of a rake of rail-carrying flat wagons, with a former East Coast Metro-Cammell Pullman vehicle marshalled immediately behind the locomotive. Testing of Doncaster-built examples was completed using the traditional Doncaster works test train, running north along the East Coast Main Line.
One class member, BREL-built no. 56042, was chosen to test the CP3 bogies that were fitted to the Class 58s. It was the first of the class to be withdrawn in 1991 after only 12 years service and scrapped three years later in 1994 at Toton TMD.[ citation needed ]
The entire class passed to English Welsh & Scottish (EWS) in 1995, when it purchased the Loadhaul, Mainline Freight and Transrail Freight companies from British Rail. Withdrawals commenced in the 1990s, with the last withdrawn on 31 March 2004. [13] Some were reinstated for use on construction trains connected with the LGV Est in France, although all such locomotives have now returned to the UK. [14]
In September 2011, DB Schenker (as EWS had become) placed its remaining 33 stored class 56s up for sale [15] with most expected to be sold for scrap.
UK-based locomotive provider Europhoenix [16] tendered for three of the DB Schenker locomotives (56018, 56115, 56117) for export to Hungarian freight operator Floyd. [17] They finally bought 56101 (from preservation), 56115 and 56117. With 56101 moving to Europhoenix, 56018 has been sold to preservationist Ed Stevenson. 56101 arrived in Hungary on 19 June 2012 with 56115 and 56117 following later in the year. These have been renumbered 0659-001-5, 0659-002-3 and 0659-003-1 respectively.[ citation needed ]
In late 2011, DB Cargo UK sold 27 Class 56s for scrap to European Metal Recycling. These were 56006, 031, 032, 037, 038, 046, 049, 051, 058, 060, 065, 069, 073, 074, 077, 078, 081, 087, 090, 094, 096, 104, 105, 106, 112, 113, 133. [18] Despite the mass sale of scrap, 56078, 087, 094, 105 and 113 were sold on to Colas Rail while UK Rail Leasing has bought a number of Class 56s, to form a pool of hire locomotives.
In 2006, three locomotives (56045, 56124 and 56125) were overhauled at Brush Traction and renumbered as 56301, 56302 and 56303 for Fastline, the British freight company launched by Jarvis. They were used on intermodal traffic. The small fleet never achieved particularly impressive availability, and there were significant problems with bogies, turbochargers, and low power. Fastline dispensed with Class 56 operation due to the loss of intermodal traffic and operated Class 66s on their coal traffic until March 2010 when the company went bankrupt.[ citation needed ]
56301 was put into store, and 56302 was purchased and run by Colas Rail. 56301 was later purchased by the Class 56 Group as a replacement for their own 56040 Oystermouth after the latter had suffered a catastrophic failure. 56040 was subsequently stripped of spares and scrapped at Barrow Hill.[ citation needed ]
Formerly preserved 56057 (renumbered 56311) and 56003 (renumbered 56312) were operated by British American Railway Services under their Devon and Cornwall Railways subsidiary (formerly Hanson Traction), these were frequently hired to Colas Rail to work their intermodal services between Dollands Moor and Hams Hall, steel diagrams between Boston and Washwood Heath and their Dagenham to Dollands Moor "Transfesa" workings in London, supplementing Colas Rail's own class 47/7 fleet. British American Railway Services currently use 56311 and 56312, along with 56303, on their own freight flows including scrap metal flows between Cardiff and the North-East, landfill flows between Wembley and Calvert and for stock moves. During 2011, 56312 was repainted into the same grey livery as 56311, but with advertising for the National Railway Museum's forthcoming 'Railfest 2012' event displayed on the body side (this has since been removed).
In December 2013 it was moved from Wansford (Nene Valley Railway) to their facility at Washwood Heath for evaluation for a possible mainline return but work has not been proceeded with. 56114 was stripped of usable parts and dispatched for scrapping during March 2012 and was cut up immediately after arrival at EMR Kingsbury. BARS 56091 returned to service in April 2013 but has since been sidelined due to power unit issues. 56103 was returned to service with BARS during July 2014. 56301 remains under long-term hire to BARS. In November 2017 all six remaining locomotives (56091, 103, 128, 303, 311, 312) were put up for sale. [19] Only 56303 was operational.
Leicester-based UK Rail Leasing (UKRL) operates Class 56's on a spot-hire basis. Within two months of the company's founding in September 2013, a fleet of 16 former DB Schenker Class 56 and two Class 37/9 diesel locomotives had been purchased. [20] [21] [22] In November 2014, UKRL's first locomotive (56081) was certified for main line use and hired to Freightliner. [22] [23] By November 2015, a further two (56098 and 56104) had been certified for main line use. [24] [25]
During mid-2014, UKRL were reportedly considering upgrading a Class 56 with new engines and electronics; the proposed arrangement involved two 1,900 hp engines for a combined output of 3,800 hp. However, this was emphasised to be "blue sky thinking" and not likely to happen soon. [26] Further information was published two years later. By then, three different options were being considered; these were: two main engines, a single main engine, or a single main engine plus an auxiliary engine. It is expected that a re-engined Class 56 would cost around £1.8 million, compared to £3 million for a new locomotive. [27]
In December 2017, two further locomotives (56311, 312) were acquired from BARS/DCR. However, in 2018, 16 locomotives, the majority of their fleet, were sold to GB Railfreight. [28] [29] [30]
In late 2008, Colas commenced operating steel trains from Immingham to Washwood Heath with Class 56s hired from Hanson Traction. [31] In 2012, Colas purchased four Class 56s. [32] By January 2014, Colas had purchased 11 of the type. [33]
As of 2020, Colas Rail Freight operates 56049, 051, 078, 087, 090, 094, 096, 105, 113 and 302 on a rotating basis on all its freight movements.[ citation needed ]
In June 2018, GB Railfreight acquired 16 of the Class 56 locomotives owned by UK Rail Leasing, together with various parts. [28] The locomotives were previously owned by DB Cargo and subsequently hired to Fertis, for high speed rail construction trains in France, before returning to the UK and were later acquired by UK Rail Leasing in 2014 for spot hire. Only 56081, 098 and 104 had been made operational by UKRL, with the majority stored at Leicester Carriage Sidings. [34] Locomotive (56128) ex DCR/BARS was acquired from CF Booth (scrapyard) and collected from there by GBRF directly. 56009, 031, 032, 037, 069, 311 subsequently moved to EMD Longport for re-engineering in July 2018.
In April 2019, GB Railfreight announced that it had awarded Progress Rail a contract to re-power the 16 locomotives that it bought from UK Rail Leasing. The locomotives will have their existing engines replaced by EMD 12-710 series engines, and will receive updated electronic controls. The work is being undertaken at Progress Rail's Longport site with the first completed in 2021. [35] The rebuilt locomotives are to be redesignated as Class 69. [36] [37]
In mid 2017, Devon & Cornwall Railways was bought by the waste contracting firm Cappagh Group. Branded as DCRail, the company acquired ex-Fertis locomotives 56103 and 56091 from its former parent BARS. Both locomotives are now in traffic.[ citation needed ]
DCRail are also current owners of the Willesden 'F' Sidings in London, just south of Wembley. Contracts out of the yard include loaded Spoil trains to Calvert land fill in Buckinghamshire. With more flows expected in the coming months.[ citation needed ]
Floyd Zrt. acquired three locomotives for use in Hungary. 56101 & 115 for operations in 2012 and 56117 as a spares donor in 2013. [38] 56115 suffered damage to one cab after hitting a lorry on a level crossing. Subsequently, it was repaired using a cab supplied by UKRL from 56106 in 2017 and 56117 was also brought into use. [39]
Although multiple members of the class have been purchased for preservation, most have re-entered mainline service. There are presently only three class 56s that are technically preserved. [40]
Number | Name | Livery | Location | Notes |
---|---|---|---|---|
56006 | - | BR Blue | East Lancashire Railway | Owned by Class 56 Group |
56097 | - | Railfreight Triple Grey (Coal Sector) | Great Central Railway (Nottingham) | Operational. Purchased from EWS in 2002 and restored. Began service in preservation in 2008. Offered for sale in 2022. [41] |
56301 | - | Fastline (Unbranded) | - | Owned by Class 56 Group, on hire to BARS. |
Mainline Railways introduced OO gauge Class 56s in 1983; one in BR large logo livery and 56079 in BR blue. [43] It was later re-issued by Dapol Model Railways in their range. Following the sale by Dapol of their tooling to Hornby, in 1998 Hornby Railways launched its first version of the BR Class 56 in OO gauge, using the former Mainline Railways tooling. [44] In late 2007, Hornby introduced a completely new, re-tooled range of BR Class 56 models in OO gauge, with examples in BR blue and Railfreight grey liveries. [45] A couple of months later in early 2008, Hornby added a third model in the form of 56128 Burton Power Station, in Railfreight Coal Sector livery. [46]
The British Rail Class 57 is a type of diesel locomotive that was remanufactured from Class 47s by Brush Traction of Loughborough between 1998 and 2004.
The British Rail Class 86 is a class of electric locomotives built during the 1960s. Developed as a 'standard' electric locomotive from earlier prototype models, one hundred of these locomotives were built from 1965 to 1966 to haul trains on the then newly electrified West Coast Main Line (WCML) from London Euston to Birmingham, Crewe, Liverpool, Manchester and later Glasgow and Preston. Introduction of the class enabled the replacement of many steam locomotives, which were finally withdrawn by British Rail in 1968.
British Rail Engineering Limited (BREL) was the rolling stock manufacturing and maintenance subsidiary of British Rail.
The British Rail Class 73 is a British electro-diesel locomotive. This type is unusual in that it can operate on the Southern Region's 650 / 750 V DC third rail power supply, or an onboard diesel engine to allow it to be used on non-electrified routes. This makes it very versatile, although the diesel engine produces less power than is available from the third-rail power supply, so the locomotives are rarely used outside of the former Southern Region of British Rail. It is one of the first bi-mode locomotives ever built. Following the withdrawal and scrapping of the more powerful Class 74 bi-mode locomotives in 1977, the Class 73 was unique on the British railway network until the introduction of the Class 88 bi-mode locomotives in 2017. Ten locomotives have been scrapped.
The Class 66 is a type of six-axle diesel-electric freight locomotive developed in part from the Class 59, for use on UK railways. Since its introduction the class has been successful and has been sold to British and other European railway companies. In Continental Europe it is marketed as the EMD Class 66 (JT42CWR).
The British Rail Class 87 is a type of electric locomotive designed and built by British Rail Engineering Limited (BREL) between 1973 and 1975. A total of thirty-six locomotives were constructed, to work passenger and freight services over the West Coast Main Line (WCML).
The British Rail Class 37 is a diesel–electric locomotive. Also known as the English Electric Type 3, the class was ordered as part of the British Rail modernisation plan. They were numbered in two series, D6600–D6608 and D6700–D6999.
The British Rail Class 50 is a class of diesel locomotives designed to haul express passenger trains at 100 mph (160 km/h). Built by English Electric at the Vulcan Foundry in Newton-le-Willows between 1967 and 1968, the Class 50s were initially on a 10-year lease from English Electric Leasing, and were employed hauling express passenger trains on the then non-electrified section of the West Coast Main Line between Crewe and Scotland. Initially numbered D400–D449 and known as English Electric Type 4s, the locomotives were purchased outright by British Rail (BR) at the end of the lease and became Class 50 in the TOPS renumbering of 1973.
The British Rail Class 92 is a dual-voltage electric locomotive, which can run on 25 kV AC from overhead wires or 750 V DC from a third rail. It was designed specifically to operate services through the Channel Tunnel between Great Britain and France. Eurotunnel indicates the Class 92 locomotive as the reference for other locomotives which railway undertakings might want to get certified for usage in the Channel tunnel.
The Class 67 locomotives are a class of Bo-Bo diesel-electric locomotives that were built for the English Welsh & Scottish Railway (EWS) between 1999 and 2000 by Alstom at Meinfesa in Valencia, Spain with drive components from General Motors' Electro-Motive Division.
The British Rail Class 90 is a type of electric locomotive. They were built for mixed-traffic duties, operating from 25 kV AC overhead lines and producing 5,000 bhp (3,700 kW). They weigh 84.5 tonnes and can typically achieve a top speed of 110 mph (177 km/h).
The British Rail Class 60 is a class of Co-Co heavy freight diesel-electric locomotives built by Brush Traction. They are nicknamed Tugs by rail enthusiasts.
Fastline was created by six railwaymen who undertook a successful management buyout (MBO) of Eastern Track Renewals from British Rail in 1996. In that year they bought Northern Track Renewals from British Rail, and undertook all the studies and examinations that resulted in their acquiring a Harsco Track Renewals Train, the first continuous-process track relaying system in the country. They also examined the possibility of acquiring their own diesel locomotives because of dissatisfaction with the service provided by others for engineering trains. The company was acquired by Jarvis, who later resurrected the Fastline name to create a railway freight operator. It operated a fleet of Class 56 and Class 66 locomotives. The class 56s cost £700,000 each to refurbish. A fourth and a fifth Class 56 were hired in from Hanson Traction Ltd. Fastline's base was at Doncaster, Yorkshire. It ceased trading when Jarvis plc entered administration and subsequently ceased trading in late March 2010. The company is in administration with Deloitte.
The British Rail Class 58 is a class of Co-Co diesel locomotive designed for heavy freight. The narrow body with cabs at either end led to them being given the nickname "Bone" by rail enthusiasts.
Tinsley Motive Power Depot, latterly Tinsley Traction Maintenance Depot (TMD), was a railway depot in Tinsley, South Yorkshire, near Sheffield. Access by road was from Brinsworth, near Rotherham. The depot was situated on the freight line between Treeton Junction and the A631 Shepcote Lane.
GB Railfreight (GBRf) is a rail freight company in the United Kingdom. As of 2022, it is owned by the global investment company Infracapital, itself a subsidiary of M&G plc, a UK investment group.
Colas Rail is a railway infrastructure and rail freight company primarily active in the United Kingdom. It is a subsidiary of Bouygues.
UK Rail Leasing (UKRL) is a railway company offering locomotive leasing and rolling stock engineering services to various train operating companies. It is based in Leicester.
Europhoenix is a spot-hire railway locomotive company in England. In addition to the hiring out of locomotives to various other operators across the United Kingdom, it commonly exports former British Rail rolling stock to operators in mainland Europe.
The British Rail Class 69 is a class of diesel locomotives which are converted from Class 56 locomotives. The conversion work is performed by Progress Rail at their workshop in Longport.
{{cite magazine}}
: Missing or empty |title=
(help)[ title missing ]{{cite magazine}}
: Missing or empty |title=
(help)