NZJ "Lushan" | |
---|---|
In service | 1998–2010 |
Built at | Tangshan Locomotive |
Constructed | 1998—1999, 2000 |
Number built | 6 motors, 6 trailers |
Formation | Mc-T-T-Mc |
Fleet numbers | NZJ-0001, NZJ1-0001-0002 |
Operators | (Nanchang Railway Bureau) |
Specifications | |
Train length | 105 m (344 ft 6 in) |
Car length | 27 m (88 ft 7 in) (motor) 25.5 m (83 ft 8 in) (trailer) |
Width | 3.204 m (10 ft 6.1 in) |
Height | 3.95 mm (0.156 in) |
Maximum speed | 120 kilometres per hour (75 mph) |
Weight | ≤17,000 kg (37,479 lb) (trailer) ≤18,000 kg (39,683 lb) (motor) |
Axle load | 18 tons |
Steep gradient | ≤20‰ |
Traction system | 660 kW |
Prime mover(s) | Cummins QST30-G3 |
Traction motors | ZQDR-110 |
Tractive effort | 1320 kW |
Transmission | AC–DC |
Acceleration | ≥0.828 km/(h⋅s) (0.514 mph/s)) |
Bogies | TW-160D, 209PK |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Notes/references | |
[1] |
The NZJ "Lushan", [Note 1] also registered as the NZJ1 are a class of diesel multiple unit (DMU) of China Railway. These sets were built by Tangshan Locomotive in a 2M2T layout of four cars with Cummins diesel engines and Siemens electrical equipment. Three sets were built in total between 1998 and 2000, with two operated by Nanchang Railway Bureau and one by Kunming Railway Bureau. [2]
From the mid-1990s, short distance and intercity services saw great decreases in passenger volume, due to competition from highways. To win back patronage on mid to short distance journeys, the Tangshan Locomotive with the support of the Ministry of Railways technological development department and China Railways Locomotive Company, started developing a new DMU in 1996, designed for intercity transport. [3] In April 1997, the first such vehicle was rolled out at Tangshan Locomotive, an electrical transmission DMU, for Harbin Railway Bureau. Afterwards, the designers started work for a double deck DMU design, which would become the NZJ class DMU. [3]
In May 1998, Tangshan Locomotive completed the development of the first double-decker diesel multiple unit; on the 22 and 23 of the same month, the set underwent running in on the Beijing–Qinhuangdao railway and the Beijing–Chengde railway, which also included a safety test, with the highest speed reached in the test being 137 km/h (85 mph). It was presented on 29 May 1998 at Tangshan Locomotive. It was handed over to Nanchang Railway Bureau on 5 June. Operation began on 18 June after it was named "Lushan", carrying passengers on the intercity service form Nanchang to Jiujiang, taking around 1.5 hours for the journey, [4] [5] faster than the two hours by coach. This led to the increase of passenger train traffic, and the set became a symbol for the newer generation of trains that would serve the railways and it was featured on train tickets. The second set was completed by Tangshan Locomotive in November 1999, and handed over to Nanchang Bureau. However, due to the short period of development and testing, the service of these sets revealed multiple flaws, and they had a very poor reliability. [6] Due to this, Nanchang Bureau only paid about 40% of the fees for the set (around CN¥240,000), with the rest being withheld due to the quality issues. After 1999, when Nanchang Bureau bought the more conventional but simpler to operate NYJ1 locomotive hauled passenger trains, the use of the NZJ sets was reduced to mainly running services during peak periods, such as the Chunyun period. Up until 2005, the NZJ still ran N621/622 from Nanchang to Yushan and N629/630, from Nanchang to Jingdezhen.
After 2006, the NZJ were stored at Nanchang depot. They were formally deregistered in August 2011, with tenders for the sale of the sets for scrapping being posted. Both sets were scrapped by the end of the year. [7]
A third NZJ set, designated NZJ1-0002 was originally completed in March 2000 as part of an order of two from Jitong railway. However, for reasons unknown, the set was not accepted, and the order was switched to 25G carriages instead. It is also unknown whether the second car in the order was ever constructed. This set was eventually purchased by Kunming Railway Bureau and underwent a refurbishment at Tangshan Locomotive in August 2004, and was handed over in the first half of 2005, entering service in September. [8]
Although the car was later designated with the prefix SWX (rail inspection vehicle), the equipment for it, such as infrared scanners, were never installed. It continued to run as a passenger vehicle in either intercity or tourist services, depending on the source although the set spent much of the time as a parked at Kunming depot. It underwent a repair at Kunming in April 2007. [8]
The main differences of this third set was that instead of a all hard seat layout, it has a hard sleeper and a soft sleeper car, along with two hard seat cars. As it was ordered for a different bureau, the paint of the set is somewhat different. It also had a different bogie for the trailers and differences in the location of car doors. [8]
This set did not serve long, exiting service in 2011, then formally withdrawn in 2012, and has been stored near Geyitou station since 2014. [9]
The NZJ has a two motor, two trailer layout, with motor cars on either end and trailer cars in the middle. The layout of the motor car, from front to back is driver's cabin, motor room, passenger cabin and electrical cabin. Apart from the driver's door, all other doors are plug doors. The motor room houses the prime mover, fuel pumps, water tank, cooling equipment and other auxiliary equipment. The electrical cabin houses the control electronics, air conditioner equipment and controls and transformers. The two NZJ sets delivered to Nanchang Bureau are fitted with only 'hard' seats, which were arranged in a 2 by 3 layout. The trailer cars provides toilets, conductor's room, air conditioning controls. Batteries and 1200 litre fuel tanks are located on the trailer cars at the side closest to the motor car. The carriages are thin-walled structures without a central supporting beam, and are connected to each other with a size H15 tightlock coupler and imported rubber gangways. The motor cars have a streamlined fibreglass structure. [10]
Each motor car has an American Cummins QST30-G3 prime mover, which is a 12 cylinder, four stroke, water cooled, v-shaped high speed diesel engine. The cylinders have a diameter of 140 mm (5.5 in), a piston travel distance of 165 mm (6.5 in). It has a maximum traction force of 700 kW at 1500 rpm, though the installed power is 634 kW. The NZJ has an AC to DC transmission, with the diesel motor driving a three-phase AC generator, model 1FC5 406-4TA. This is then passed through a transformer and a rectifier, with the ZQDR-110 traction motors using DC power, which is speed regulated through changing voltage. [10]
The NZJ used a Siemens S7-300 programmable controller for direct current, and the two motor cars are connected through a RS-485 standard cable, allowing both motors to be controlled at the same time through microcomputers.
Position in set | 1 | 2 | 3 | 4 |
---|---|---|---|---|
Carriage numbers | NZJ-0001A SYZ25DD345687 | SYZ25DT345685 | SYZ25DT345686 | NZJ-0001B SYZ25DD345688 |
NZJ1-0001A SYZ25DD345937 | SYZ25DT345935 | SYZ25DT345936 | NZJ1-0001B SYZ25DD345688 | |
NZJ1-0002A SWX25DD999213 | SWX25DT999214 | SWX25DT999215 | NZJ1-0002B SWX25DD999212 | |
Carriage type (for original pair) | Double deck 'hard' seat | |||
Carriage type (NZJ1-0002) | Double deck 'hard' seat | Double deck 'hard' seat | Double deck 'soft' bed | |
Traction | ●● ●● | 〇〇 〇〇 | ●● ●● | |
Mc | T | Mc | ||
Equipment | driver's cabin diesel generator traction motor | diesel fuel tank batteries toilet AV broadcasting station | diesel fuel tank batteries toilet snack shop | driver's cabin diesel generator traction motor |
Max occupancy (for original pair) | 102 | 166 | 102 | |
Bogie (for original pair) | TW-160D | 209PK | TW-160D | |
Bogie (NZJ1-0002) | TW-200 |
As an early DMU, the NZJ had numerous flaws that contributed to its prolonged periods out of service. As the controls for traction and electrical generation at both ends were linked to each other, the failure of one caused the other to fail as well, which resulted in the train becoming unmovable due to the loss of power. In summer, this meant the interior would heat up to high temperatures without the air conditioning, as the windows were not openable. Technological limitations meant that the self diagnosis system was not properly developed, and the low level of modularity and proprietary nature of the electrical system meant that the workers at Tangshan Locomotive often did not know how to solve the problems either. Although the design was technically not flawed, it had tolerances that were too low and there were insufficient spare parts available, and without a diagnosis system, it was hard to locate the source of the problem. Performing maintenance on the set was a difficult task, as height restrictions limit the size of the cars, worsened by the double deck design, meaning that the spaces between the bogie and car body were small. As a consequence, maintenance was hard to carry out. [6]
CRRC Tangshan Co., Ltd., is a manufacturer of rolling stock located in Tangshan, Hebei province, People's Republic of China. While Datong built mainline steam locomotives until 1988, Tangshan built steam for industrial use until 1999, becoming the last works in the world to build steam for non-tourist use.
China Railway High-speed (CRH) is a high-speed rail service operated by China Railway.
The DF8 is a type of diesel locomotive used in China. It was in production from 1984 until mid-1990s, with mass production starting in 1989. The revised DF8B is still in production today. DF8 are almost exclusively used for freight services.
The CRH3 Hexie is a version of the Siemens Velaro high-speed train used in China on the Beijing–Tianjin intercity railway line, Wuhan-Guangzhou Passenger Dedicated Line, Zhengzhou-Xi'an Passenger Dedicated Line and the Shanghai–Nanjing intercity railway. It is capable of service speed of 380 km/h (236 mph) as the very similar Velaro E used in Spain, but, similarly to the Sapsan, it is 300 mm (11.8 in) wider to take advantage of a more generous structure gauge and thus be able to fit in more seats in a 2+3 layout.
The CRH5 Hexie is an electric multiple unit high-speed train in use with China Railway High-speed in the People's Republic of China. The CRH5 is based on the ETR-600 New Pendolino used in Italy.
The China Railways "Dongfang Hong" diesel-hydraulic locomotive classes DFH2, DFH5, DFH6, and DFH7, built from the 1970s to 1990s, were all used as shunters on the Chinese railway network.
The HXD2 is an electric locomotive and a series of related locomotive classes built by CNR Datong Electric Locomotive and Alstom. The locomotives designs are based on the Alstom Prima electric locomotives, and are a product of a cooperation agreement signed between the two companies in 2004. All locomotives are intended for heavy freight work, including coal trains on the Datong Qinhuangdao line.
The DF5 is a diesel-electric locomotive used by China Railway in the People's Republic of China. It has been in production since 1976 and is still produced as of 2006 by several local companies. It is the most common road switcher in China and is used for yard and road switching duties. A small number are also in service with the Korean State Railway in North Korea.
The HXN5B, is a diesel-electric locomotive used by China Railway in the People's Republic of China. It has been in production since 2012. It is a new-generation road switcher type made in China and used for yard and road switching services.
Hexie, also known as the CRH series EMU, is an umbrella term for the multiple unit high-speed and higher-speed trains operated by China Railway under the China Railway High-speed brand. All series of Hexie are based on foreign-developed technology and later manufactured locally in China through technology transfer licenses, with the ultimate goal of China acquiring the know-how and capability to produce high-speed rail trains.
The CR200J Fuxing is a Chinese higher-speed trainset consisting of a power car paired with unpowered passenger cars operated by China Railway. It is the slowest member of the Fuxing series. The train was jointly designed and produced by six companies under CRRC.
The DDJ1 is a first generation high-speed electric multiple unit built for China Railway, built by Zhuzhou Electric Locomotives, Changchun Railway Vehicles, Sifang Railway Vehicles, Tangshan Passenger vehicle factory, Nanjing Puzhen and developed by Zhuzhou Electric Locomotive Research Centre. It was built in 1999, and was an experimental vehicle, with only one set built, as it did not enter mass production. The design was well received as part of national science in the 9th five year plan. The DDJ1 is in a push–pull configuration, with only one locomotive in the set and the other end being a trailer with a driver's cabin.
The DJF2"Xianfeng" electric multiple unit is a model operated formerly by China Railway with traction motors distributed throughout the unit. It was developed in 2001 as a key task of the science and technology targets of the Ninth Five-Year Plan. It was an innovative and advanced design being the first Chinese multiple unit train to achieve 200 km/h (124 mph) and achieving a top test speed of 292.8 km/h (181.9 mph) in tests, but had numerous flaws in the design that complicated operations.
The NDJ3 "Great Wall", previously labeled the "Harmony Great Wall" is the only higher-speed diesel multiple unit that is still operating in China. It was first designed to be used for passenger transport in the 2008 Olympics, and has become a mature technology platform with export orders to Nigeria despite initial flaws related to overheating of electrical cables in the power car.
The Dongfeng diesel multiple unit, also known as the Dongfeng motor coach, and NM1, was a DMU of Ministry of Railways, and was also the first diesel-hydraulic power car and double deck passenger car of China, built by Qingdao Sifang in 1958. The train consisted two motors and four double deck trailers, and was designed for short, commuter services. Each motor has two DV12A high speed diesel engines, and has the SF2006-1 hydraulic transmission. As the set had numerous flaws, it never entered mass production, but the valuable experience gained in the design and manufacturing process was later applied to the DFH1 and Red Star-class locomotive, while the passenger cars designs were later further developed for double deck trains such as the NZJ.
The TSD09 diesel multiple unit is a tilting train developed by Tangshan Locomotive in 2003 and fitted with Cummins diesel engines, Voith hydraulic transmission and Extel Systems Wedel tilting mechanisms. It was built for Sanmao Railway, but due to strategic reasons within the Ministry of Railways, the set never operated commercially and has been permanently stored at Tangshan Locomotive.
The KDZ1 is the first electrical multiple unit built in China. It is an experimental alternating current electrical multiple unit, developed by Changchun Railway Vehicles, CRRC Zhuzhou Institute and China Academy of Railway Sciences in 1978 and completed in 1988, though it never saw passenger service, with it being stored after it completed its initial tests.
The DJF1 "Zhongyuan Star" was an electric multiple unit of China Railway. It only operated in service for less than five years, before it was removed from service due to its various flaws and high maintenance costs. The train was initially built as a six car set, and subsequently lengthened to a fourteen car set. The two driving motors and the middle two motor cars have been preserved, with the other carriages being scrapped.
The KDZ1A "Chuncheng" was an early attempt at building an electric multiple unit in China with the participation of Changchun Railway Vehicles, Zhuzhou Institute and Kunming railway bureau. Development was completed in 1999 in time for the Kunming World Horticultural Exposition. As its predecessor, the KDZ1 never operated commercially, the KDZ1A became the first Chinese EMU to be in revenue service, although it was in service for only 10 years before being withdrawn.
The NC3 are a model of diesel multiple units operated by China Railway. They were built by Ganz-MAVAG in 1962 and imported from the Hungarian People's Republic to be operated in China. They were not the first DMU to be operated in China; the Dongfeng DMU had been built a few years earlier, but only in a single set.