DJF1 "Zhongyuan Star" | |
---|---|
In service | 2001-2005 |
Manufacturer | Zhuzhou Electric Locomotive |
Designer | Zhuzhou Electric Locomotive, CRRC Zhuzhou Institute, Qingdao Sifang, Zhengzhou bureau |
Assembly | Zhuzhou, China |
Constructed | 2001, 2002 |
Entered service | 2001 |
Refurbished | 2002 |
Number built | 1 set (8M6T) |
Number in service | 0 |
Number preserved | 2 driving motor, 2 motor |
Predecessor | KDZ1A "Chuncheng" |
Successor | DJF2 "Xianfeng" |
Capacity | 1392 |
Operators | China Railway |
Specifications | |
Car length | 27 m (88 ft 7 in) (control car) 25.5 m (83 ft 8 in) (other cars) |
Width | 3,204 mm (10 ft 6.1 in) |
Height | 3,950 mm (13 ft 0 in) |
Wheel diameter | 915 mm (3.002 ft) (new) |
Maximum speed | 178 km/h (111 mph) (test maximum) |
Axle load | 16 tonnes (16 long tons; 18 short tons) |
Traction system | IGBT-VVVF |
Traction motors | JD-112 |
Power output | 200 kW |
Tractive effort | 3200 kW (6 car layout) 6400 kW (14 car layout) |
Transmission | AC–DC–AC |
Acceleration | 1.44 km/(h⋅s) (0.89 mph/s) |
Power supply | 25 kV AC |
Bogies | DDB-1, DTB-2 |
Braking system(s) | Regenerative braking, air brake |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Notes/references | |
[1] [2] [3] |
The DJF1 "Zhongyuan Star" was an electric multiple unit of China Railway. It only operated in service for less than five years, before it was removed from service due to its various flaws and high maintenance costs. The train was initially built as a six car set, and subsequently lengthened to a fourteen car set. The two driving motors and the middle two motor cars have been preserved, with the other carriages being scrapped.
From the late 1990s onwards, with the progression of the multiple rounds of railway speed-ups, in order to fulfill passenger rail demands, various locomotive factories in China built a number of diesel and electric multiple units for Nanchang, Harbin, Shanghai, Kunming and Guangzhou bureaus. A similar event happened on 3 July 2000, with Zhengzhou bureau signing an agreement for cooperation with Zhuzhou Locomotive, Zhuzhou Institute and Qingdao Sifang, to jointly develop an EMU with a top speed of 160 km/h (99 mph) and using AC transmission for a total cost of CN¥36,000,000. On 18 June 2001, the Ministry of Railways and CSR held a conference on the design of alternating current, power separated EMUs, during which the design of the DJF1 was also approved. [4]
This new EMU was officially named the DJF1, where "D", "J" and "F" respectively describes the characteristics of the train: D for "电力动车组" (EMU), J for "交流传动" (AC) and F for "动力分散" (power separated). [5]
On 21 September 2001, the DJF1, now named the "Zhongyuan Star" was rolled out in a ribbon cutting ceremony, along with the China Railway DJ2 "Olympic Star" electric locomotive at Zhuzhou Electric Locomotive, with the deputy minister for railways, Cai Qinghua, Hunan Province deputy governor Zheng Maoqing and the manager and deputy manager of Zhengzhou bureau, Feng Lingyun and Xu Yifa in attendance. [6] After being rolled out, the DJF1 was transported to the China Academy of Railway Beijing ring railway for operational and safety tests, which it passed successfully. On 19 October 2001, it departed Beijing for Zhengzhou. Under the guidance of the ministry, Zhuzhou Electric Locomotive and Zhengzhou bureau, the DJF1 began publicly testing on the Jingguang railway from 23 October between Zhengzhou—Xuchang—Xiaoshangqiao—Wuchang; However, problems relating to control logic appeared not long after entering the line for testing. [7] After a period of diagnosis, the problem was solved on the morning of the 24th. The public tests were completed on 26 October, during which it had travelled a total of 2,815 km (1,749 mi), reaching a maximum speed of 178 km/h (111 mph). [8] To fulfill the maintenance demands of the set, a 560 metre long ditch was exclusively built for the use of the DJF1 at Zhengzhou bureau, Zhengzhou sector.
On 4 November 2001, the General Secretary and President Jiang Zemin, with the accompaniment of minister for railways Fu Zhihuan, and Shijiazhuan Electric sector inspected the DJ2 and the DJF1. [9] [10]
On 18 November 2001, the DJF1 was put into operation to with service T491/492, with T491 departing Zhengzhou every morning at 7:28, arriving at Wuchang at 13:37; then returning with service T492 at 14:54 and arriving back at Zhengzhou at 21:10, with stops at Xiaogan, Xinyang, Zhumadian, Luohe and Xuchang, shrinking the journey time by 3 hours. [11] In 28 December, Zhengzhou bureau changed the timetable by adding service T501/502 from Zhengzhou to Hankou to be operated by the DJF1 and stopping only one stop, at Xinyang, with service T501 departing every day at 07:43 from Zhengzhou and arriving at Hankou at 12:59; T502 would depart Hankou at 15:50, returning to Zhengzhou at 21:10, taking 5 hours and 20 minutes for the journey, reducing the original travel time by 45 minutes. As the DJF1 was switched to the new service, T491/492 started using double deck 25K carriages again. [12]
The DJF1 was originally built as a six car set with a capacity of 548 people with a single price for any distance. This was set at CN¥119 for soft seat and CN¥76 for hard seat. Due to the large passenger demand but insufficient seats, service T501/502 was never profitable. Even with each seat being occupied, the service lost an average of CN¥30,000 per day, due to costs from electricity. [13] To increase the carrying capacity and thus operating efficiency, Zhengzhou bureau signed a contract in 2002 with Zhuzhou Electric Loocmotive, Zhuzhou Institute and Sifang for expanding the six car set into a fourteen car set, increasing maximum capacity to 1398 people. For this, the DJF1 was removed from service from 11 May 2002, departing for modifications at Qingdao. This was completed, and then transferred to Zhuzhou on 8 July for fitting out and testing. [14] Other features fitted were at the request of Zhengzhou bureau, such as vacuum toilets, emergency air conditioning electrical supply and LCD televisions. The entire set was returned to Zhengzhou on 8 September, and passed various tests, [15] re-enterting service on 28 September in time for Golden Week holidays. [16]
However, the train still had an inconsistent performance. Various faults would occur; the components that had the most faults were the traction transformers, auxiliary inverters, auxiliary power supply and microcomputer controls. The set failed often in service, which not only affected the on-time running of services, but also led to passenger frustration and damage to the reputation of the railway bureau. [17] Some breakdowns were severe enough that the set could not continue on its on. On 5 September 2004, while operating T502 from Wuchang to Zhengzhou, a fault occurred as the seat was near Xiaogang, where an axle in carriage ten became jammed. After passengers were moved to other carriages, traction unit three (carriages 8 to 10) were removed, and the set continued on with eleven cars to Zhengzhou. [18]
By November 2005, the DJF1 had run over 1,800,000 km (1,118,468 mi), transporting over 1,900,000 passengers. It was replaced in service from June 2006, with T501/502 being instead assigned to 25K double deck carriages, while the DJF1 being stored at Zhengzhou. It was returned to Qingdao Sifang in June 2007, where it became a spare parts donor, and was progressively dismantled. With the old factory buildings at Sifang being dismantled, ten of the carriages were also dismantled, except for the four motor cars, which have since then been stored at the China Railway Museum. [5]
The DJF1 was designed as a power separated EMU, with two motors and a trailer forming a traction unit. The train has the ability to be rearranged, and could be expanded with demand. Initially, in its six car form, it consisted two traction units, with a total tractive effort of 3200 kW. With the expansion of it into a fourteen car set with four traction units, the tractive effort was increased to 6400 kW. Operation can be conducted with just one raised pantograph, with a high voltage cable linking all cars to distribute power.
The carriage body was built with a drum shape, and the thin wall structure was supported with a welded frame, built with mostly aluminium, ABS and polycarbonates, with an emphasis on lighter materials. Each carriage was connected with a tightlock coupler, and the control cars had a streamlined design built of fibreglass, while skirts under each carriage smooth airflow. Only the two driving motors are soft seat carriages in a two by two reclinable layout; the hard seat carriages were in a two by three seat layout. All carriages had a luggage room, conductor's room, tea boilers, toilets and locally manufactured plug doors. [19]
The DJF1 had an AC—DC—AC transmission, with every traction unit having a primary transformer in the trailer between the two motors. The two motor carriages are fitted with inverters and traction motors. [20]
The DJF1 used mostly domestically built parts, developed by Zhuzhou Institute. The AC transmission used has three components: PMW inverter, DC return and IGBT controls rated at 3300V/1200A, which dissipates heat with a heat sink and air cooling. [21] The JD112 traction motors are three-phase, asynchronous motor with a rated output of 200 kW. [22]
Auxiliary electronics are split into two independent units for seven carriages each, with centralised rectifiers but individual inverters, providing 600V DC to each carriage, which is passed through an inverter to become two-phase 220 V AC. [20]
The DJF1 used a microcomputer control based on the Adtranz "MICAS-S2", using the TCN standard. The controls are separated into three lines, the set control, the carriage control and control cable. Each traction unit has a single connector for the cables.
The DJF1 used two different types of bogies, the DDB-1 for motors and DTB-2 for trailers. These two bogies feature a different structure, though they were both developed using existing Sifang designs, while incorporating foreign designs for a bolsterless bogie. The bogies had two stage suspension, with the carriage resting on air cushioned springs of the second stage suspension, which in turn is on the springs of the first stage suspension. [23]
Carriage number | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Carriage registration | DJF1-0001A RZ25DD 110964 | YZ25DT 348274 | YZ25DD 348272 | YZ25DT 349110 | YZ25DD 349106 | YZ25DT 349111 | YZ25DD 349107 | YZ25DD 349108 | YZ25DT 349112 | YZ25DD 349109 | YZ25DT 349113 | YZ25DD 348273 | YZ25DT 348275 | DJF1-0001B RZ25DD 110965 |
Type | soft seat | hard seat | soft seat | |||||||||||
Traction | ●● ●● | 〇〇 〇〇 | ●● ●● | 〇〇 〇〇 | ●● ●● | 〇〇 〇〇 | ●● ●● | 〇〇 〇〇 | ●● ●● | 〇〇 〇〇 | ●● ●● | 〇〇 〇〇 | ●● ●● | |
① | ② | ③ | ④ | |||||||||||
Mc | Tp | M | T | M | T | M | T | M | T | M | Tp | Mc | ||
Equipment | driver's cabin motors | pantographs traction converters | air compressors motors | traction motors | primary transformer | air compressors motors | primary transformer | traction motors | air compressors motors | pantographs traction converters | driver's cabin | |||
Occupancy | 68 | 98 | 108 | 102 | 108 | 102 | 108 | 102 | 108 | 102 | 108 | 98 | 68 | |
Notes | additional cars built in 2002 |
The CRH2 Hexie is one of the high-speed train models in China. The CRH2 is based on the E2-1000 Series Shinkansen design from Japan with the license purchased from a consortium formed of Kawasaki Heavy Industries, Mitsubishi Electric, and Hitachi, and represents the second Shinkansen train model to be exported.
China Railway High-speed (CRH) is a high-speed rail service operated by China Railway.
The HXD1 is an eight axle high power heavy freight twin unit locomotive of axle configuration Bo'Bo'+Bo'Bo'. Both the HXD1 and HXD2 double unit locomotives were designated DJ4, the HXD2 units being disambiguated DJ4-6000.
The CRH6 is a regional/commuter higher-speed train of the People's Republic of China. It is designed by CRRC Qingdao Sifang and will be manufactured by CRRC Nanjing Puzhen at its subsidiary, the CRRC Guangdong Jiangmen Factory. Unlike other CRH types, most CRH6 trains use unique names; only very few CRH6 use Hexie as the train name.
The HXD2 is an electric locomotive and a series of related locomotive classes built by CNR Datong Electric Locomotive and Alstom. The locomotives designs are based on the Alstom Prima electric locomotives, and are a product of a cooperation agreement signed between the two companies in 2004. All locomotives are intended for heavy freight work, including coal trains on the Datong Qinhuangdao line.
HXD2B locomotives are railway locomotives designed for heavy freight mainline work. The design is a single body twin cab locomotive with 6 axles in Co′Co′ wheel arrangement. The body frame, traction motor power electronics and driver facilities are of a similar design as the HXD2. The bogie design differs from the HXD2 using a straight welded steel frame rather than the 'mouth' shaped form used in the HXD2.
The HXD2C is a 6 axle Co′Co′ freight locomotive which shares a similar exterior design with the HXD2B. The individually inverter controlled traction motors, body structure overall structural design also are the same as other members of the series; with transformers from ABB. The locomotive power is reduced to 7.2 MW (9,700 hp), suitable for trains of 5,000–6,000 tonnes. The locomotive can be ballasted to give axle loads from 23 to 25 tonnes. The HXD2C locomotives are constructed by CNR Datong.
CRRC Datong Co. Ltd. is a Chinese railway locomotive manufacturing plant based in Datong, Shanxi, China, founded 1953. The factory was a major producer of steam locomotives for the Chinese market up to 1988 when production switched to diesel powered locomotives. By the 1990s electric locomotives had begun to be produced, and became the major product of the works.
The "fastest" train commercial service can be defined alternatively by a train's top speed or average trip speed.
The HXD1C is an electric locomotive developed by CSR Zhuzhou Electric Locomotive Co., Ltd. The design was revealed in 2009: a 7.2 MW power six axle, 150-tonne, Co'Co' locomotive.
The CR200J Fuxing is a Chinese higher-speed trainset consisting of a power car paired with unpowered passenger cars operated by China Railway. It is the slowest member of the Fuxing series. The train was jointly designed and produced by six companies under CRRC.
The DDJ1 is a first generation high-speed electric multiple unit built for China Railway, built by Zhuzhou Electric Locomotives, Changchun Railway Vehicles, Sifang Railway Vehicles, Tangshan Passenger vehicle factory, Nanjing Puzhen and developed by Zhuzhou Electric Locomotive Research Centre. It was built in 1999, and was an experimental vehicle, with only one set built, as it did not enter mass production. The design was well received as part of national science in the 9th five year plan. The DDJ1 is in a push–pull configuration, with only one locomotive in the set and the other end being a trailer with a driver's cabin.
The NZJ "Lushan", also registered as the NZJ1 are a class of diesel multiple unit (DMU) of China Railway. These sets were built by Tangshan Locomotive in a 2M2T layout of four cars with Cummins diesel engines and Siemens electrical equipment. Three sets were built in total between 1998 and 2000, with two operated by Nanchang Railway Bureau and one by Kunming Railway Bureau.
The DJF2"Xianfeng" electric multiple unit is a model operated formerly by China Railway with traction motors distributed throughout the unit. It was developed in 2001 as a key task of the science and technology targets of the Ninth Five-Year Plan. It was an innovative and advanced design being the first Chinese multiple unit train to achieve 200 km/h (124 mph) and achieving a top test speed of 292.8 km/h (181.9 mph) in tests, but had numerous flaws in the design that complicated operations.
The NDJ3 "Great Wall", previously labeled the "Harmony Great Wall" is the only higher-speed diesel multiple unit that is still operating in China. It was first designed to be used for passenger transport in the 2008 Olympics, and has become a mature technology platform with export orders to Nigeria despite initial flaws related to overheating of electrical cables in the power car.
The Dongfeng diesel multiple unit, also known as the Dongfeng motor coach, and NM1, was a DMU of Ministry of Railways, and was also the first diesel-hydraulic power car and double deck passenger car of China, built by Qingdao Sifang in 1958. The train consisted two motors and four double deck trailers, and was designed for short, commuter services. Each motor has two DV12A high speed diesel engines, and has the SF2006-1 hydraulic transmission. As the set had numerous flaws, it never entered mass production, but the valuable experience gained in the design and manufacturing process was later applied to the DFH1 and Red Star-class locomotive, while the passenger cars designs were later further developed for double deck trains such as the NZJ.
The TSD09 diesel multiple unit is a tilting train developed by Tangshan Locomotive in 2003 and fitted with Cummins diesel engines, Voith hydraulic transmission and Extel Systems Wedel tilting mechanisms. It was built for Sanmao Railway, but due to strategic reasons within the Ministry of Railways, the set never operated commercially and has been permanently stored at Tangshan Locomotive.
The KDZ1 is the first electrical multiple unit built in China. It is an experimental alternating current electrical multiple unit, developed by Changchun Railway Vehicles, CRRC Zhuzhou Institute and China Academy of Railway Sciences in 1978 and completed in 1988, though it never saw passenger service, with it being stored after it completed its initial tests.
The KDZ1A "Chuncheng" was an early attempt at building an electric multiple unit in China with the participation of Changchun Railway Vehicles, Zhuzhou Institute and Kunming railway bureau. Development was completed in 1999 in time for the Kunming World Horticultural Exposition. As its predecessor, the KDZ1 never operated commercially, the KDZ1A became the first Chinese EMU to be in revenue service, although it was in service for only 10 years before being withdrawn.