Agency overview | |
---|---|
Formed | May 2, 1941 |
Dissolved | May 31, 2021 (Transmission Lines & Distribution Areas) by LUMA Energy. June 30, 2023 (Generation Area) by Genera PR. |
Superseding agency |
|
Headquarters | San Juan, Puerto Rico |
Website | aeepr |
The Puerto Rico Electric Power Authority (PREPA; Spanish: AEE) Is an electric power company owned by the Commonwealth of Puerto Rico responsible for electricity generation, power distribution, and power transmission on the island. [1] PREPA was the only entity authorized to conduct such business in Puerto Rico, making it a government monopoly, until on January 22, 2018, former governor of Puerto Rico, Ricardo Rossello, announced that all assets of the company will be sold in a general privatization of PREPA.
The authority was ruled by a board of directors appointed by the governor with the advice and consent of the Senate. After 2014, PREPA was subject to the Puerto Rico Energy Commission, another government agency whose board of directors was also appointed by the governor.
Hurricane Maria in September 2017 destroyed PREPA's distribution network, creating a blackout in all parts of the island. [2]
PREPA was originally named the Puerto Rico Water Resources Authority (PRWRA) which was created by Act. 83 of May 2, 1941, [3] during the governorship of Rexford G. Tugwell. Government-owned, PRWRA unified diverse regional and local electric power companies into one unified electric grid.
Over the years the budget for maintenance, such as clearing trees near power lines, has diminished: in 2007 it was $251 million and in 2014 it was $202 million. [4] [5]
Throughout its history, PREPA has suffered several outages that have left regions or the entire island of Puerto Rico without power.
In August 2012 14,000 residents where left without power following the passing of tropical storm Isaac. [6]
One of these islandwide outages occurred on September 20, 2016, due to a fire at one of PREPA's plants—Central Aguirre. [7] All of Puerto Rico was without power for three days.
On occasion, entire sectors are reportedly left without power when an animal, such as a cat or an iguana, causes damage to the system. [8]
In September 2021 demand for electricity exceeded supply, after mechanical and maintenance problems affected various power plants, resulting in four days of consecutive rolling blackouts. [9] [10] Central Aguirre and Palo Seco faced problems with the removal of seaweed since the filters to prevent the accumulation of such needed replacement. [11] The power outages resulted in the cancellation of classes at the Pontifical Catholic University of Puerto Rico and a student protest at the University of Puerto Rico. [12] [13]
At the first days of September 2017, the eye of Hurricane Irma passed north of the island. The strong winds left 1 million residents without power. Power had been restored to 980,000 people by September 20, when Hurricane Maria struck, leaving nearly the entire island without power. Two weeks later, power had been restored to about 10% of customers. [14] Full restoration took months, and many Puerto Ricans bought generators. [15] Electric companies in unaffected areas ordinarily make contracts for speedy assistance to those hit by disaster, but in this case negotiations took weeks.
The initial $300 million contract for power restoration was given to Whitefish Energy, a Montana company which had only two employees on the day the hurricane struck. [16] The award was controversial on those and other grounds, and was cancelled on October 29. By December 2017, the Army Corps of Engineers had other contractors in place, along with crews brought in through mutual aid agreements with utilities such as Con Edison. [17]
Six weeks after Hurricane Maria, 30% of customers had been restored. [18] After two months, almost half had been restored. [19]
On January 6, 2018, representatives of FEMA, the U.S. Army Corps of Engineers and their armed security details entered a Palo Seco warehouse owned by PREPA to obtain and distribute a massive store of spare parts were needed to restore grid power. PREPA has been accused of hoarding the materials and hence delaying the restoration of power. The equipment has since been distributed. [20]
In January 2018, it had been predicted that generation would reach 95% by the following month, and 100% of customers would be restored by June 2018.
On April 18, 2018, an accident at a transmission line knocked out the electrical grid of Puerto Rico. All the island lost power. The following afternoon, PREPA announced that service had been restored to 97% of customers, the same percentage as before this blackout. 40,000 customers were still out of service due to the hurricane seven months earlier. [21]
With June 1 the official start of the 2018 hurricane season, an estimated 11,000+ customers remained without power, possibly for another two months. [22] Although an estimated $3.8B was spent on power grid work since the September hurricanes, the grid is still considered fragile and vulnerable. [23] PREPA announced a $500M one-year master services agreement with MasTec for further power grid reconstruction and modernization services. [24] [25]
As a result of the 2019–20 Puerto Rico earthquakes the Costa Sur Power Plant located in Guayanilla was knocked out of service. An estimated 327,000 clients where left without power and many as a result without water service. The President of the AEE/PREPA, Jose Ortiz, informed there was extensive damage in the facilities and that repairs would take more than a year. [26] [27] FEMA assigned $238 million to help cover cost related to backup units which are used to meet the demand previously covered by Costa Sur. [28]
In 2017, during Hurricane Maria an unsolicited offer by New Fortress Energy was made to PREPA. In 2020, a court order required the awarded-contract documents be made public and showed several irregularities including that the company doesn't have a liquid-gas production track record in Puerto Rico and that rather than go through a bidding process, the contract was approved quickly. Chris Christie, the former governor of New Jersey was listed as a paid lobbyist for PREPA, in the documents. Ingrid Vila Biaggi, the former Puerto Rico Chief of Staff, made a request for an independent investigation. [29] In 2021 various environmental groups requested the cancellation of the contract. [30]
In June 2020 governor Wanda Vázquez Garced and the AEE/PREPA signed a contract with LUMA Energy that would give the company control of the AEE/PREPA electric grid for 15 years. [31] The meeting in which the contract (which contains over 300 pages in length) was approved lasted only 43 minutes. [32]
The UTIER along with the other unions of the authority expressed disapproval of the contract, organized strikes and submitted amendments to the contract. [33] [34] The Puerto Rico House of Representatives called for postponing the contract until 2022 and launched an investigation into the contract. [35] [36] [37]
In October 2024, the Special Commission of the Puerto Rico Bar concluded that the contract, between the two agreements, violated fundamental legal principles, but also contributed to worsening the energy situation of Puerto Rico. The Special Commission of the Puerto Rico Bar recommends, a Litigation in nullity, or Resolution according to the contractual terms. [38]
PREPA's board of directors serves as the authority's governing body, with a membership that usually consists of private citizens entrusted with representing the public interest and may or may not include exofficio political officeholders (typically the Secretary of Economic Development and Commerce). Three members of the board are directly elected by consumers by plurality-at-large; two of them by residential consumers and one by commercial ones. However, when both the governor and the legislature belong to the same party, one of the earliest laws amended by the legislature is the one governing PREPA's board composition. The governor is usually required to appoint four members with the advice and consent of the Senate, who along with the incumbent political officeholders which serve in ex officio capacity effectively render the authority a partisan tool rather than an electric utility.
This section needs to be updated.(October 2017) |
The last structural change to the board occurred on June 11, 2018, after governor Ricardo Rossello.
Role | Representation | Name | Remarks |
---|---|---|---|
Chairman | Public interest | Eli Díaz Atiencia | Engineer |
Vice Chairman | Consumer‑elected | Vacant | |
Secretary | Ex officio | Ralph A. Kreil Rivera | Autoridad de Asesoría Financiera y Agencia Fical de Puerto Rico |
At-large | Christian Sobrino | ||
At-large | Elected by Consumers | Vacant | |
At-large | Elected by consumers | Vacant | Main Access to Infrastructure |
At-large | María Palou |
There are four labor unions that represent the workers from the authority exclusively UTIER, UITICE, UEPI, and UPAEE. [39] In 2021 three of the five unions will disband due to the LUMA energy contract. [40]
The majority of Puerto Rico's electricity is generated using oil and natural gas fired power plants. Puerto Rico also has 21 reservoirs that produce hydroelectric energy. [41]
In 2019 the Puerto Rican government passed legislation requiring the closure of coal fired power plants by 2028 and achieving 100% renewable energy by 2050. [42] A report in 2021 criticized the government for delays in processing applications for electrical interconnection. At the time of said report only 327 applications where approved, representing 0.09% of the total. [43]
In 2021 the government unveiled plans for the Puerto Rico Ocean Technology Complex (PROtech) an Ocean thermal energy conversion project on the southeast coast. [44]
This section needs to be updated.(February 2021) |
PREPA serves close to 1.5 million customers through several power plants (as of 2015): [45] [46] In 2020 the agency continues to report that it serves 1.5 million customers. [47] On July 1, 2023, every generation plant owned by PREPA got taken over by private company Genera PR. [48]
The public corporation also provides fiber optic broadband to private carriers through one of its subsidiary, PREPA Networks. PREPA is also studying the possibility of selling energy to the United States Virgin Islands with the installation of an underwater power cable between Fajardo and the island of St. Thomas —similar to the power cable with which it services its clients in the island municipalities of Vieques and Culebra. [62]
As of 2014 the authority carries liabilities of US$10.1 billion against assets of $6 billion. [63] It also operates with a deficit of about $354 million against revenues of $4.8 billion. [64] [65] In terms of costs, $2.6 billion or about 58% of PREPA's expenses are attributed to fuel purchases alone while salaries and collective bargains represent less than 13% of the authority's expenses. [65]
On May 23, 2014, Citigroup severely curtailed PREPA's line of credit for fuel purchase, forcing PREPA to run out of cash to pay Petrobras, its main oil supplier. Petrobras, in turn, threatened to cut off further shipments to the authority. This forced the authority to take $100 million out of its Capital Improvements Fund in order to pay its debt to Petrobras. PREPA argues that the different agencies of the government of Puerto Rico owe them more than $290 million in debt, while an additional $375 million of revenue is lost through subsidies enacted by the Puerto Rican legislature. [66] [67] [68] [69] [70] An additional $600 million is owed to the authority by residential and commercial consumers, some of them by consumers living in public housing. [71] [72] The authority argues that it wouldn't have a problem being self-sufficient if it were paid the aforementioned debt and if it weren't forced to give out subsidies. On June 3, 2014, senator Ramón Luis Nieves admitted publicly that, "part of the financial problem at PREPA was provoked by the government and the Puerto Rican legislature." [70]
On June 11, 2014, Fitch Ratings downgraded its rating on the authority's to speculative non-investment grade ("junk status") from BB+ to BB while putting the authority on negative rating watch. [73] PREPA filed for bankruptcy in July 2017. [74]
PREPAs' two largest creditors are OppenheimerFunds and Franklin Templeton. [75]
As of 2021 the payment of PREPA's debt remains in an indefinite "limbo" due to a lack of agreement between the government of Puerto Rico and bond holders. PREPA's debt totals over $9 billion and according to David Skeel, the new president of the Financial Oversight and Management Board for Puerto Rico, it will have to be renegotiated in light of the COVID-19 pandemic. [76] Additional to a lack of progress on debt negotiation a 2020 law passed due to the COVID-19 pandemic in Puerto Rico halted cutting service to clients who failed to pay their utility bills, this resulted in a decrease in the earnings of the agency. [77]
Investigations by the office of the Comptroller revealed from 2010 to 2018 the AEE had mismanaged $192 million on projects without utility. [78]
In March 2021 the AEE announced increase in electric bills for the next three months equivalent to an average of $12 more on clients bills. [79] As part of the contract with LUMA Energy, the AEE has begun transferring funds to LUMA, including $128 million sent by April 2021. [80]
Puerto Rico, officially the Commonwealth of Puerto Rico, is a self-governing Caribbean archipelago and island organized as an unincorporated territory of the United States under the designation of commonwealth. Located about 1,000 miles (1,600 km) southeast of Miami, Florida, between the Dominican Republic in the Greater Antilles and the U.S. Virgin Islands in the Lesser Antilles, it consists of the eponymous main island and numerous smaller islands, including Vieques, Culebra, and Mona. With approximately 3.2 million residents, it is divided into 78 municipalities, of which the most populous is the capital municipality of San Juan, followed by those within the San Juan metropolitan area. Spanish and English are the official languages of the government, though Spanish predominates.
The University of Puerto Rico, often shortened to UPR, is the main public university system in the U.S. Commonwealth of Puerto Rico. It is a government-owned corporation with 11 campuses and approximately 44,200 students and approximately 4,450 faculty members. UPR has the largest and most diverse academic offerings in the commonwealth, with 472 academic programs of which 32 lead to a doctorate.
Yabucoa is a town and municipality in Puerto Rico located in the eastern region, north of Maunabo; south of San Lorenzo, Las Piedras and Humacao; and east of Patillas. Yabucoa is spread over 9 barrios and Yabucoa Pueblo. It is part of the San Juan-Caguas-Guaynabo Metropolitan Statistical Area.
San Sebastián is a town and municipality of Puerto Rico located in the northwestern region of the island, south of Isabela, Quebradillas and Camuy; north of Las Marías; east of Moca and Añasco; and west of Lares. San Sebastián is spread over twenty-four barrios and San Sebastián Pueblo. It is a principal city of the Aguadilla-Isabela-San Sebastián Metropolitan Statistical Area.
The Puerto Rico Mental Health and Anti-Addiction Services Administration —Spanish: Administración de Servicios de Salud Mental y Contra la Adicción (ASSMCA)— is a Puerto Rico-based organization associated with the Substance Abuse and Mental Health Services Administration of the United States Department of Health and Human Services. As of June 2021 the administrator the agency is Carlos Rodríguez Mateo.
Jenniffer Aydin González Colón is a Puerto Rican politician who is the governor-elect of Puerto Rico and currently serves as the 20th Resident Commissioner of Puerto Rico. González has served in leadership positions in the New Progressive Party of Puerto Rico (PNP) and in the Republican Party of the United States. These positions included being the chairwoman of the Puerto Rico Republican Party, speaker and minority leader of the House of Representatives of Puerto Rico, and vice-chair of the PNP. González is the second-youngest person to be elected Resident Commissioner and the first woman to hold the role.
The Gasoducto del Sur was a pipeline to supply natural gas to Puerto Rico for conversion to electricity proposed by the administration of Governor Aníbal Acevedo Vilá. The pipeline would have run from Peñuelas, in Puerto Rico's south central coast to electricity-generating plants in Salinas, running in an easterly fashion along Puerto Rico's southern coast. The project aimed to supply a portion of Puerto Rico's electrical energy needs while lowering the cost of electricity in the island.
Pedro Rafael Pierluisi Urrutia is a Puerto Rican politician and lawyer currently serving as Governor of Puerto Rico since 2021, having previously been the de facto governor from August 2–7, 2019. A member of New Progressive and Democratic Parties, he previously served as acting Secretary of State of Puerto Rico in 2019, as Resident Commissioner of Puerto Rico from 2009 to 2017, and as Secretary of Justice of Puerto Rico from 1993 to 1997. He was formerly a private attorney for Puerto Rico's fiscal oversight board under the Puerto Rico Oversight, Management, and Economic Stability Act.
The Dr. Juan A. Rivero Zoo, officially named the Dr. Juan A. Rivero Zoo of Puerto Rico, also known as the Mayagüez Zoo, was a 45-acre (18 ha) zoological park located in Mayagüez, Puerto Rico, owned by the Government of Puerto Rico and operated by the Department of Natural and Environmental Resources, under the agency of the Company of National Parks of Puerto Rico. It was named in honor of Juan A. Rivero, its first director. It was Puerto Rico's only zoo and had an extensive collection of animals from all continents.
Ricardo Antonio Rosselló Nevares is a Puerto Rican politician who served as Governor of Puerto Rico from 2017 until his resignation in 2019, after overwhelming protests related to the Telegramgate scandal. He is the son of former governor of Puerto Rico and pediatric surgeon Pedro Rosselló.
José A. "Josian" Santiago Rivera is a Puerto Rican politician. He became the mayor of the municipality of Comerío as a member of the Popular Democratic Party (PPD) at the 2000 general elections, and was re-elected in 2004 and 2008. In 2010 Santiago became the president of the Asociación de Alcaldes de Puerto Rico, the organization that regulates cooperation between most mayors affiliated to the PPD.
The Puerto Rico Aqueducts and Sewers Authority is a water company and the government-owned corporation responsible for water quality, management, and supply in Puerto Rico, a US insular area. PRASA is the only entity authorized to conduct such business in Puerto Rico, effectively making it a government monopoly.
Javier Jiménez Pérez (born November 12, 1961), is a Puerto Rican politician who has served as the mayor of San Sebastián since 2005. Jiménez was affiliated with the New Progressive Party (PNP) until 2023, when he joined Project Dignity. In 2024, he became Project Dignity's president and their 2024 nominee for governor of Puerto Rico.
The Unión de Trabajadores de la Industria Eléctrica y Riego (UTIER) —English: Electrical Industry and Irrigation Workers Union— is one of the labor unions that represents workers from the Puerto Rico Electric Power Authority. The union was founded on May 3, 1942 by thirty seven linemen in San Juan, Puerto Rico. At some point it was affiliated with the Free Federation of Workers and the American Federation of Labor and Congress of Industrial Organizations but it eventually unaffiliated and became independent. Today, the union represents about 4,800 workers.
The Puerto Rico Energy Bureau is the government agency that regulates the energy industry in Puerto Rico. The commission was created with the primary intention of regulating the Puerto Rico Electric Power Authority (PREPA): the government-owned corporation and government monopoly that distributes and transmits all energy in Puerto Rico as well as producing 70% of all energy in Puerto Rico. Before the commission came into existence, PREPA regulated both itself and the energy industry without any oversight whatsoever. As renewable energy became economically feasible, Puerto Rico lagged behind in comparison to other jurisdictions. This did not bode well with several energy businesses and think tanks, such as the Association of Producers of Renewable Energy (APER) and the Center for the New Economy (CNE), which advocated for the creation of a separate independent entity capable of regulating the industry.
Between September 19–21, 2017, Hurricane Maria devastated the entire island of Puerto Rico and caused a major humanitarian crisis. Originally as a powerful Category 5 hurricane, Maria was the strongest storm to impact the island in nearly 90 years. Maria made landfall on Puerto Rico on September 20 as a high-end Category 4 storm, bringing a large storm surge, very heavy rains, and wind gusts well above 100 mph (160 km/h). It flattened neighborhoods, crippled the island's power grid, and caused an estimated 2,982 fatalities and US$90 billion in damage.
Whitefish Energy Holdings, LLC is a small holding company based in Whitefish, Montana whose portfolio of companies installs, maintains, and repairs electrical grids. The holding company was founded in 2015 by Andy Techmanski, a former lineman. In October 2017, Whitefish, a company whose previous biggest assignment was $1.4 million, was awarded a $300 million contract to repair part of the energy infrastructure in Puerto Rico following Hurricane Maria. This contract involved Puerto Rico Electric Power Authority (PREPA). The contract was ultimately canceled after coming under public scrutiny; the company relied on subcontracted workers, who were paid several times less than the sum Whitefish Energy charged PREPA in return, which was described by The New York Times as "far above the norm even for emergency work — and almost 17 times the average salary of [such workers] in Puerto Rico."
Crime in Puerto Rico describes acts of violent and non-violent crime that take place within the Commonwealth of Puerto Rico.
Palo Seco is a barrio in the municipality of Toa Baja, Puerto Rico. Its population in 2010 was 288.
LUMA Energy is a private power company that is responsible for power distribution and power transmission in the Commonwealth of Puerto Rico. They are also in charge of maintaining and modernizing the power infrastructure. Previously, these duties belonged exclusively to the Puerto Rico Electric Power Authority, but as of July 20, 2018, permission was granted for PREPA assets and service duties to be sold to private companies, and on June 22, 2020, a 15-year contract with LUMA was signed, making LUMA the new operator. The takeover took place on June 1, 2021.
{{cite web}}
: CS1 maint: numeric names: authors list (link){{cite web}}
: CS1 maint: multiple names: authors list (link)