The Ripley Wind Power Project is a 76 megawatt (MW) wind power project near Ripley, Ontario. [1]
The wind farm includes 38 Enercon E-82 wind turbines, each with two megawatt rated power, 82m rotor diameter and 79m hub height as well as a transmission line and two electrical sub-stations. The wind farm is located on the shores of Lake Huron in Huron-Kinloss Township, approximately 220 kilometres west of Toronto and 140 kilometres north of London. [1]
The project is expected to have the capacity to generate enough zero-emission electricity to power 24,000 homes and offset approximately 66,000 tonnes of carbon dioxide annually. Project cost is estimated at $176 million Canadian dollars. [1]
Year | January | February | March | April | May | June | July | August | September | October | November | December | Total |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2007 | 986 | 15,344 | 16,330 | ||||||||||
2008 | 25,666 | 18,181 | 19,954 | 19,424 | 17,985 | 10,630 | 9,597 | 8,233 | 9,455 | 20,042 | 23,460 | 32,343 | 171,123 |
2009 | 21,783 | 21,853 | 19,844 | 22,978 | 16,914 | 5,673 | 6,304 | 11,683 | 8,711 | 16,606 | 15,280 | 20,316 | 144,309 |
2010 | 21,322 | 12,583 | 15,277 | 18,974 | 12,864 | 9,487 | 7,497 | 10,381 | 17,901 | 16,393 | 21,621 | 30,108 | 160,503 |
2011 | 18,602 | 25,266 | 18,058 | 20,833 | 14,441 | 8,970 | 6,794 | 8,338 | 12,172 | 17,074 | 29,258 | 24,377 | 160,315 |
2012 | 26,133 | 20,590 | 23,762 | 19,329 | 10,790 | 12,803 | 7,438 | 120,845 |
The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large government-owned integrated public utilities play a leading role in the generation, transmission, and distribution of electricity. Ontario and Alberta have created electricity markets in the last decade to increase investment and competition in this sector of the economy.
Kingsbridge Wind Power Project, also referred to as Kingsbridge 1 Wind facility , refers to a large wind farm owned and operated by Capital Power Corporation. Kingsbridge 1 Wind facility is located between Goderich and Kincardine, Ontario. The Kingsbridge 1 Wind facility is located on the southeast shore of Lake Huron in the township of Ashfield-Colborne-Wawanosh and consists of 22 1.8 MW Vestas V80 wind turbines with a capacity of 39.6 MW. Each tower is over 78 meters tall and weigh around 195 metric tonnes. The project consists of two phases and currently provides power to on average 12,500 homes.
Albany wind and Grasmere farms are two wind power stations near Albany, Western Australia, owned by Bright Energy Investments. They are adjacent and are often considered a single facility. They have 18 wind turbines, with a maximum generating capacity of 35.4 MW of electricity. The original Albany Wind Farm was commissioned in October 2001, after ten years of planning. The wind farm has the capacity to produce 80 per cent of the electricity requirements of Albany.
Wind power has a history in Canada dating back many decades, particularly on prairie farms. As of December 2021, wind power generating capacity was approximately 14,304 megawatts (MW). Combined with 2,399 MW of solar power generating capacity, this provided about 6.5% of Canada's electricity demand as of 2020. The Canadian Wind Energy Association (CanWEA) has outlined a future strategy for wind energy that would reach a capacity of 55 GW by 2025, meeting 20% of the country's energy needs.
Burton Wold Wind Farm is a wind farm located near Burton Latimer in the English county of Northamptonshire, UK. The farm was developed by Your Energy Ltd, is owned by Mistral Windfarms and operated by Engineering Renewables Ltd. E.ON UK is buying the electricity output of the project under a long-term power purchase agreement. The farm is spread over three hectares. It has an installed capacity of 20 MW and generate on average around 40,000,000 units of electricity annually.
Prince Wind Farm is a large wind farm in northern Ontario. Prince Wind Farm is owned by Brookfield Power Prince Wind LP, a subsidiary of Brookfield Power. It is located north of Sault Ste. Marie, Ontario, mostly within the township of Prince but also extending into Unorganized Algoma, however it is visible from as far away as Pancake Bay Provincial Park and Whitefish Point. Prince I, 99 MW was completed in September 2006, Prince II, 90 MW, in November 2006. The average capacity factor for the first five full years of operation was 27.2%.
The Mount Mercer Wind Farm is located at Mount Mercer approximately 30 kilometres south of Ballarat in Western Victoria on 2600ha. The wind farm consists of 64 REpower MM92 wind turbines, giving a total installed capacity of 131 MW. It is expected to generate approximately 395,000 megawatt hours (MWh) of electricity each year which could power approximately 74,000 households and result in a reduction of some 510,000 tonnes of carbon dioxide.
Ontario Power Generation Inc. (OPG) is a Crown corporation and "government business enterprise" that is responsible for approximately half of the electricity generation in the province of Ontario, Canada. It is wholly owned by the government of Ontario. Sources of electricity include nuclear, hydroelectric, wind, gas and biomass. Although Ontario has an open electricity market, the provincial government, as OPG's sole shareholder, regulates the price the company receives for its electricity to be less than the market average, in an attempt to stabilize prices. Since 1 April 2008, the company's rates have been regulated by the Ontario Energy Board.
Historically, the main applications of solar energy technologies in Canada have been non-electric active solar system applications for space heating, water heating and drying crops and lumber. In 2001, there were more than 12,000 residential solar water heating systems and 300 commercial/ industrial solar hot water systems in use. These systems presently comprise a small fraction of Canada's energy use, but some government studies suggest they could make up as much as five percent of the country's energy needs by the year 2025.
According to the International Hydropower Association, Canada is the fourth largest producer of hydroelectricity in the world in 2021 after the United States, Brazil, and China. In 2014, Canada consumed the equivalent of 85.7 megatonnes worth of oil of hydroelectricity, 9.8% of worldwide hydroelectric consumption. Furthermore, hydroelectricity accounted for 25.7% of Canada's total energy consumption. It is the third-most consumed energy in Canada behind oil and natural gas.
There are a number of wind power projects in the state of Maine, totaling more than 900 megawatts (MW) in capacity. In 2020 they were responsible for 24% of in-state electricity production. In 2019, Maine had more wind capacity than the other five New England states combined, at 923 MW.
The Hau Nui Wind Farm is a 15-turbine wind farm located approximately 21 kilometres (13 mi) south-east of Martinborough, in the South Wairarapa District of New Zealand. Hau Nui was the first wind farm built in New Zealand.
The Amaranth Wind Farm, also known as the Melancthon EcoPower Centre, is a 199.5 megawatt (MW) wind farm in Amaranth and Melancthon Township, near Shelburne, Ontario. The centre is owned and operated by TransAlta and at the time of opening, was Canada's largest wind energy installation.
Wolfe Island Wind Farm is a large wind farm project located on Wolfe Island, Ontario. The wind farm became operational on June 29, 2009. It is owned and operated by Canadian Hydro Developers, Inc., through its subsidiary Canadian Renewable Energy Corporation (CREC). The power will be purchased by Hydro One for distribution to consumers.
Port Alma Wind Farm is a large wind farm project located on the north shore of Lake Erie in the Municipality of Chatham–Kent, Ontario, Canada.
The Bear Mountain Wind Park is an electricity generating wind farm facility located near Dawson Creek, British Columbia, Canada. It is owned by Bear Mountain Wind LP and began operations in November, 2009. BC's first operating wind farm has a generating capacity of 102 megawatts. It uses 34 turbines in a single row along Bear Mountain ridge. The turbines are Enercon E-82.
The Comber Wind Farm is a 165.6 megawatt (MW) wind farm in Lakeshore, Ontario, consisting of 72 2.3 MW Siemens SWT 2.3 wind turbines with 101 meter diameter rotors. Construction was completed in January 2012. It is adjacent to the Gosfield Wind Project.
The Gosfield Wind Project is a 50.6 megawatt (MW) wind farm in Kingsville, Ontario, consisting of 22 2.3 MW Siemens SWT 2.3 wind turbines with 49 metre long blades. Construction was completed in October 2010 for CDN 149 million.
The U.S. State of Oklahoma has high potential capacity for wind power in the western half of the state. In 2021, Oklahoma's installed wind generation capacity was almost 10,500 megawatts, supplying over 40% of the state's generated electricity and 85% of Oklahoma's total generating capacity from all renewable resources.