Rocky Mountain Arsenal

Last updated

Aerial photo, 1943 Colorado - Rocky Mountain Arsennal - NARA - 23936191 (cropped).jpg
Aerial photo, 1943
1943 Colorado - Rocky Mountain Arsennal - NARA - 23936193 (cropped).jpg
1943
Rocky Mountain Arsenal, south entrance. (photo 1960) Rocky Mountain Arsenal south entrance.jpg
Rocky Mountain Arsenal, south entrance. (photo 1960)

The Rocky Mountain Arsenal was a United States chemical weapons manufacturing center located in the Denver Metropolitan Area in Commerce City, Colorado. The site was completed December 1942, [1] operated by the United States Army throughout the later 20th century and was controversial among local residents until its closure in 1992.[ citation needed ]

Contents

Much of the site is now protected as the Rocky Mountain Arsenal National Wildlife Refuge.

History

After the attack on Pearl Harbor and the United States' entry into World War II, the U.S. Army began looking for land to create a chemical manufacturing center. Located just north of Denver, in Commerce City and close to the Stapleton Airport, the U.S. Army purchased 20,000 acres (81 km2). The location was ideal, not only because of the proximity to the airport, but because of the geographic features of the site, it was less likely to be attacked. The Rocky Mountain Arsenal manufactured chemical weapons including mustard gas, napalm, white phosphorus, lewisite, chlorine gas, and sarin. In the early 1960s, the U.S. Army began to lease out its facilities to private companies to manufacture pesticides. In the early 1980s the site was selected as a Superfund site and the cleanup process began. In the mid-1980s, wildlife, including endangered species, moved into the space and the land became a protected wildlife refuge. [1]

Policy

The environmental movement began in the United States in the 1960-1970s. The U.S. Congress responded to the movement in 1980 with the creation of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), most commonly referred to as a Superfund. CERCLA was a tax imposed on chemical and petroleum industries. CERCLA also gave the Federal government the authority to respond to the release of life-threatening hazardous materials. [2]

After 42 years of chemical manufacturing, in 1984, the United States Army began to inspect the level of contamination at Rocky Mountain Arsenal (RMA). The site was placed on the National Priorities List (NPL), a list of the most contaminated areas in the United States. Rocky Mountain Arsenal, among other post-military sites, was a top priority, establishing RMA as a superfund site. This was further exacerbated when the U.S. Army discovered an endangered species, the bald eagle. [3] After the bald eagles were captured, tested, and found to be healthy, the National Wildlife Federation worked with policymakers to transition RMA to a wildlife refuge. In 1992, Congress Passed the Rocky Mountain Arsenal National Wildlife Refuge Act (RMANWR Act). Included in the RMANWR Act, areas within RMA that were still contaminated were still owned by the U.S. Army, however, the vast majority of the land that was deemed clean would be managed by the Federal Fish and Wildlife Service (FWS).

Tensions arose between the United States Environmental Protection Agency (USEPA), the State of Colorado, United States Army, and the chemical industries as they partnered to clean up the site and create the RMANWR. This led the State of Colorado to take legal action over who has legal authority over RMA remediation efforts, payment of natural resource damages (NRDs), and reimbursement of costs expended for cleanup activities (response costs). [4]

Site selection

The Arsenal's location was selected due to its relative distance from the coasts (and presumably not likely to be attacked), a sufficient labor force to work at the site, whether that was conducive to outdoor work, and the appropriate soil needed for the project. It was also helpful that the location was close to Stapleton airfield, a major transportation hub. [5]

In 1942, the US Army acquired 19,915 acres (80.59 km2) of land on which to manufacture weapons in support of World War II military activities at a cost of $62,415,000. Additionally, some of this land was used for a prisoner of war camp (for German   combatants) and later transferred to the city of Denver as Stapleton Airport expanded. A lateral was built off the High Line Canal to supply water to the Arsenal.

Manufacturing operations

Rocky Mountain Arsenal, south plant. (photo 1970) Rocky Mountain Arsenal south plant.jpg
Rocky Mountain Arsenal, south plant. (photo 1970)

Weapons manufactured at RMA included both conventional and chemical munitions, including white phosphorus (M34 grenade), napalm, mustard gas, lewisite, and chlorine gas. [6] [7] RMA is also one of the few sites that had a stockpile of Sarin gas (aka nerve agent GB), an organophosphorus compound. The manufacturing of these weapons continued until 1969. Rocket fuel to support Air Force operations was also manufactured and stored at RMA. Subsequently, through the 1970s until 1985, RMA was used as a demilitarization site to destroy munitions and chemically related items. Coinciding with these activities, from 1946 to 1982, the Army leased RMA facilities to private industries for the production of pesticides. One of the major lessees, Shell Oil Company, along with Julius Hyman and Company and Colorado Fuel and Iron, had manufacturing and processing capabilities on RMA between 1952 and 1982. The military reserved the right to oust these companies and restart chemical weapon production in the event of a national emergency.

Deep injection well

RMA contained a deep injection well that was constructed in 1961. [8] It was drilled to a depth of 12,045 feet (3,671 m). The well was cased and sealed to a depth of 11,975 feet (3,650 m), with the remaining 70 feet (21 m) left as an open hole for the injection of Basin F liquids. For testing purposes, the well was injected with approximately 568,000 US gallons (2150 m³) of city water prior to injecting any waste. The injected fluids had very little potential for reaching the surface or usable groundwater supply since the injection point had 11,900 feet (3,600 m) of rock above it and was sealed at the opening. The Army discontinued use of the well in February 1966 because the fluid injection triggered a series of earthquakes in the area. [8] [9] The well remained unused until 1985 when the Army permanently sealed the disposal well.

Environmental issues

Rabbit used to check for leaks at Sarin nerve gas production plant. (photo 1970) Sarin test rabbit.jpg
Rabbit used to check for leaks at Sarin nerve gas production plant. (photo 1970)

In 1984, the Army began a systematic investigation of site contamination in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), commonly referred to as Superfund. In 1987, the RMA was placed on the National Priorities List (NPL) of Superfund sites. As provided by CERCLA, a Remedial Investigation/Feasibility Study (RI/FS) was conducted to determine the extent of contamination. Since 1985, the mission at RMA has been the remediation of the site.

Contaminants

The primary contaminants include organochloride pesticides, organophosphate pesticides, carbamate insecticides, organic solvents and feedstock chemicals used as raw products or intermediates in the manufacturing process (e.g., chlorinated benzenes), heavy metals, chemical warfare material and their related breakdown products and biological warfare agent such as TX. Additionally, ordnance (including incendiary munitions) was manufactured and tested, and asbestos and polychlorinated biphenyls (PCBs) were used at RMA. Today, it is considered a hazardous waste site according to the Colorado Department of Public Health and Environment.

Groundwater contamination

The contamination of the underlying alluvial aquifer occurred due to the discharge of waste into unlined basins. The following data were derived from the United States Nuclear Regulatory Commission. From 1943 to 1956, the US Army and Shell discharged wastes into the unlined basins resulting in the contamination of the South Platte River outside the Arsenal. Farmers in the vicinity complained about the damage to crops due to the water pumped from the shallow alluvial aquifer. In response, the Army constructed an asphalt-lined impoundment for the disposal of wastes in 1956. Further, in 1961, the Army constructed a 12,000-foot deep injection well for the disposal of wastes. This resulted in subsequent earthquakes in Denver area. In 1975, Colorado Department of Public Health and Environment ordered the Army and Shell to stop the non-permitted discharge of contaminants, to control the contaminated groundwater leaving the site, and to implement a monitoring plan. The Army and Shell took remedial actions to prevent the contamination that includes the installation of the groundwater barrier system which treated approximately 1 billion gallons of water every year. The deep injection well was closed in 1985 and Basin F was closed in 1988 [10] According to National Resource Damage Assessment, although the contamination has been reduced by the treatment efforts, the water in and around the arsenal may never be fully clean. A volume of approximately 52,500 acre-feet (65 million cubic metres) of the alluvial aquifer is not usable for human consumption. [11]

Wildlife Injuries

The NRDA found several injuries to wildlife. It was estimated by the U.S. Fish and Wildlife Service that at least 20,000 ducks died in a 10-year span during the 1970s. Mallard carcasses found to have higher levels of Dieldrin. Many mammals and birds were found dead and may have suffered lower reproduction rates or birth defects. [11]

Safety concerns for neighboring residents

Because of the Superfund site status and the dramatic cleanups, many residents in neighborhoods surrounding the RMA voiced concern about ongoing health risks of living within the close vicinity of the site. In September 2017, the state of Colorado filed a lawsuit to sue the United States government for the right to control the contaminated areas of the RMA. [12] Though the cleanup of the site was considered complete in 2010, soil and groundwater monitoring practices occur every five years to ensure the effects of the clean-up remain. Restrictions on well water use, residential development, consumption of fish and game from the arsenal, and agricultural use of the arsenal will exist in perpetuity until further scientific research is completed at the site.

Water

Many of the surrounding neighborhoods have been provided with potable tap water from other areas of Adams county because of the potential effects of contaminated groundwater from wells. Trace amounts of the chemical 1,4-dioxane has been found in some samples of drinking water. There is no appropriate standard by the EPA, but the state of Colorado has a standard treatment protocol for this chemical. [13]

Soil

As part of the clean up of the RMA, much of the soil, up to 10 feet below the surface was removed from the site. This soil is contained in hazardous waste landfills. Contaminated areas of soil remain in the Rocky Mountain Arsenal, but are contained in basins and containment structures. [11]

Air quality

During the cleanup of the RMA, concern for air pollution from the hazardous materials was raised. The Colorado Department of Public Health and Environment established monitoring systems throughout various locations of the RMA. Throughout the decades of cleanup, the air monitors revealed there was no safety hazard to public health as no arsenal chemicals had been released into the air.

Epidemiological studies

Longstanding agricultural and health concerns related to the Rocky Mountain Arsenal have resulted in a complex history of political and legal battles. Heavy volatile contaminants related to Basin F raised concern among the public for the site and the process of the clean-up itself of the Arsenal and a medical monitoring program (MMP) was put in place as part of the Record of Decision (ROD) between the U.S. Army, the U.S. Environmental Protection Agency, and the Colorado Department of Health and Environment in 1996. [3] One of the goals of the MMP was to enhance community assurance that the clean-up was effective, and it included air quality monitoring, cancer surveillance, and birth defects surveillance. [11] Air quality monitoring of the Arsenal began concurrently with the decontamination process in 1997 and surveillance continued until July 2009.

The Surveillance for Birth Defects utilized passive observational data from an existing birth defects registry March 1989 – March 2009. [14] The following data were derived from the Rocky Mountain Arsenal Medical Monitoring Program Surveillance for Birth Defects Compendium prepared by Colorado Department of Public Health and Environment and published in February 2010. In this study, baseline birth defects were estimated from the time period 1989–1997, which was the point at which the clean-up began, and inclusion criteria included mother's address at the time of birth being within the geographical study area. Other demographics of the mother were gathered as well. Birth defects included in the analysis were: "total congenital anomalies, major congenital anomalies, heart defects, muscle and skeletal defects, and kidney and bladder defects," and these categories were inconsistent in reporting accuracy. Statistically significant findings (p<0.01) of this study included demographic differences in the mothers as follows: median age 24, compared to 27 years of age in Colorado as a whole, higher percent of mothers who were white/Hispanic and black, mean education level of 11.8 years compared to 13.1 years in Colorado as a whole, fewer mothers who were married, and fewer prenatal visits on average. These potential confounders are not clearly addressed in this report and may complicate the analysis as well as raise concern for disparities in exposure risk that is dependent upon demographic factors. Baseline rates of congenital anomalies in the study area compared to Colorado as a whole did not show significant differences between populations. No significant increase was observed in congenital anomalies during the clean-up period compared to pre-clean up, although there are no baseline data prior to initial contamination events because data was not yet being collected and the population was very different at that time.

In summary, there is no current evidence of health effects. The Colorado Department of Public Health and Environment found no increased risk of birth defects in infants. A separate study of cancer incidence by the Colorado Department of Health did not find convincing evidence of increased cancer risk in people living in residential areas surrounding the arsenal, [15] although the study was made more difficult by the large demographic changes in the area and was also confounded by smoking and obesity rates. Additionally, studies performed at Colorado State University found no increased risk of Arsenic, Mercury, or neurotoxicity in communities within 15 miles of the RMA. [16] [17]

Economic impact of contamination and clean up

Many projects have attempted to clean contaminated groundwater at the Arsenal. For example, DIMP (diisopropyl methyl phosphonate) was one of the main contaminants in the area. One monitoring project has demonstrated incremental improvements over time, and specifically measured 640 parts per billion (ppb) in 1987 and 55 ppb in 1989, while a different off-post monitoring well measured 138 ppb in 1985, 105 ppb in 1987, 14 ppb in 1988, and 6.7 ppb in 1989. [18] While it is difficult to capture the societal cost to clean up the site, the list of actions dealing with groundwater contamination listed by Mears and Heise include:

Direct economic totals add up to approximately $111 million and this estimation does not include operation and maintenance costs. In addition, there were actions completed by Future Farmers of America (FFA) between 1991 and 1993 that cost approximately $151.2 million. A more recent article in 2004 by Pimentel, [19] estimated the cost of removal pesticides from the groundwater and soil at the Rocky Mountain Arsenal by approximately $2 billion. Also, they noted that if all groundwater were to be cleared for human consumption, the cost would be $500 million annually.

Estimating exact direct and indirect impact of the contamination is very challenging as the cleaning and monitoring costs are complex. Further, there have been damages to the rural areas due to contamination resulting in livestock losses, and crop losses. In addition, contamination affects public health and nature (honeybee poisonings, pesticide resistance in pests, destruction of natural predators, wild birds, microbes) negatively. There are many studies that try to estimate the total costs due to contamination of pesticides in U.S. as well as in other countries; however, indirect costs are difficult to estimate, but likely several times than total direct environmental and social costs. [20] In the case of Rocky Mountain Arsenal, total indirect cost was not estimated at all.

Rocky Mountain Arsenal NWR Act

Mule deer at the Rocky Mountain Arsenal National Wildlife Refuge with Denver, CO and the Rocky Mountain foothills in the background. (photo 2009) Mule-deer.jpg
Mule deer at the Rocky Mountain Arsenal National Wildlife Refuge with Denver, CO and the Rocky Mountain foothills in the background. (photo 2009)

In 1986, it was discovered that the absence of human activity had made the area an involuntary park when a winter communal roost of bald eagles, then an endangered species, was discovered on site. The U.S. Fish and Wildlife Service inventoried more than 330 species of wildlife that inhabit the Arsenal including deer, coyotes, white pelicans, and owls.

The Rocky Mountain Arsenal National Wildlife Refuge Act was passed in October 1992 and signed by President George H. W. Bush. It stipulates that the majority of the site will become a National Wildlife Refuge under the jurisdiction of the Fish and Wildlife Service when the environmental restoration is completed. The act also provides that to the extent possible, parts of the arsenal are to be managed as a refuge in the interim. Finally, the act provides for the transfer of some arsenal land for road expansion around the perimeter of the arsenal and 915 acres (3.70 km2) to be sold for development and annexation by Commerce City.

Already since 1995, the buildings became the seat of the National Eagle Repository, an office of the Fish and Wildlife Service that receives the bodies of all dead golden and bald eagles in the nation and provides feathers and other parts to Native Americans for cultural uses.

In September 2010, the cleanup was considered complete, and the remaining portions of land were transferred to the U.S. Fish and Wildlife Service, bringing the total to 15,000 acres (61 km2). Two sites were retained by the Army: the South Plants location due to historical use[ clarification needed ], and the North Plant location, which is now a landfill containing the remains of various buildings used in the plants.

On May 21, 2011, the official visitor center for the refuge was opened with an exhibit about the site's history, ranging from the homesteading era to its current status.

Public use

Congruent with the outline of the June 1996 USFWS Comprehensive Management Plan, RMA will be available for public use through both community outreach and educational programs (as provided by the Visitor Access Plan and the USFWS). This public availability will be implemented while simultaneously supporting the remediation effort and the USFWS activities.

Dick's Sporting Goods Park

In April 2007 Dick's Sporting Goods Park, a soccer-specific stadium, was opened on part of the former Rocky Mountain Arsenal land that was transferred to Commerce City. The new venue hosts the Colorado Rapids of Major League Soccer.

Bison

A small herd of wild bison was introduced to the refuge in March 2007 as part of the USFWS Bison Project. The animals were transferred from the National Bison Range in Montana.

See also

Related Research Articles

<span class="mw-page-title-main">Superfund</span> US federal program to investigate / clean up sites contaminated with hazardous substances

Superfund is a United States federal environmental remediation program established by the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The program is administered by the Environmental Protection Agency (EPA). The program is designed to investigate and clean up sites contaminated with hazardous substances. Sites managed under this program are referred to as Superfund sites. Of all the sites selected for possible action under this program, 1178 remain on the National Priorities List (NPL) that makes them eligible for cleanup under the Superfund program. Sites on the NPL are considered the most highly contaminated and undergo longer-term remedial investigation and remedial action (cleanups). The state of New Jersey, the fifth smallest state in the U.S., is the location of about ten percent of the priority Superfund sites, a disproportionate amount.

<span class="mw-page-title-main">Environmental remediation</span> Removal of pollution from soil, groundwater etc.

Environmental remediation is the cleanup of hazardous substances dealing with the removal, treatment and containment of pollution or contaminants from environmental media such as soil, groundwater, sediment. Remediation may be required by regulations before development of land revitalization projects. Developers who agree to voluntary cleanup may be offered incentives under state or municipal programs like New York State's Brownfield Cleanup Program. If remediation is done by removal the waste materials are simply transported off-site for disposal at another location. The waste material can also be contained by physical barriers like slurry walls. The use of slurry walls is well-established in the construction industry. The application of (low) pressure grouting, used to mitigate soil liquefaction risks in San Francisco and other earthquake zones, has achieved mixed results in field tests to create barriers, and site-specific results depend upon many variable conditions that can greatly impact outcomes.

<span class="mw-page-title-main">Rocky Flats Plant</span> Defunct American nuclear weapons manufacturing site in Colorado

The Rocky Flats Plant was a U.S. manufacturing complex that produced nuclear weapons parts in the western United States, near Denver, Colorado. The facility's primary mission was the fabrication of plutonium pits, which were shipped to other facilities to be assembled into nuclear weapons. Operated from 1952 to 1992, the complex was under the control of the U.S. Atomic Energy Commission (AEC), succeeded by the Department of Energy (DOE) in 1977.

The Small Business Liability Relief and Brownfields Revitalization Act was signed into law by President George W. Bush on January 11, 2002. Brownfields are defined as, "A former industrial or commercial site where future use is affected by real or perceived environmental contamination." The Brownfields Law amended the Comprehensive Environmental Response, Compensation, and Liability Act by providing funds to assess and clean up brownfields, clarifying CERCLA liability protections, and providing funds to enhance state and tribal response programs. Other related laws and regulations impact brownfields cleanup and reuse through financial incentives and regulatory requirements.

<span class="mw-page-title-main">Rocky Mountain Arsenal National Wildlife Refuge</span> Protected area near Denver, Colorado

The Rocky Mountain Arsenal National Wildlife Refuge is a 15,988-acre (24.981 sq mi) National Wildlife Refuge located adjacent to Denver and Commerce City, Colorado, in the United States. It is approximately 8 miles (13 km) northeast of downtown Denver. The refuge is on the grounds of the former Rocky Mountain Arsenal, a United States Army chemical weapons manufacturing facility. The site was designated a national wildlife refuge in 1992 by the United States Congress, and underwent a costly environmental cleanup in order to remove pollutants. The refuge is managed by the United States Fish and Wildlife Service. More than 330 species of wildlife inhabit the refuge, including raptors, deer, raccoons, coyotes, white pelicans, black-footed ferrets, black-tailed prairie dogs, and bison.

The Edison Wetlands Association was founded by noted activist Robert Spiegel in 1989 as a nonprofit environmental organization devoted to the cleanup of hazardous waste sites and the preservation of open space in densely populated central New Jersey.

<span class="mw-page-title-main">Havertown Superfund</span> Superfund site in Pennsylvania

Havertown Superfund is a 13-acre polluted groundwater site in Havertown, Pennsylvania contaminated by the dumping of industrial waste by National Wood Preservers from 1947 to 1991. The state first became aware of the pollution in 1962 and initiated legal action against the owners in 1973 to force them to cleanup the site. The Environmental Protection Agency (EPA) ranked the site the eighth worst cleanup project in the United States. The site was added to the National Priorities List in 1983 and designated as a Superfund cleanup site in the early 1990s. Remediation and monitoring efforts are ongoing and the EPA transferred control of the site to the Pennsylvania Department of Environmental Protection in 2013.

<span class="mw-page-title-main">Rocky Flats National Wildlife Refuge</span> Nature reserve in Colorado, United States

The Rocky Flats National Wildlife Refuge is 5,237-acre (21.19 km2) National Wildlife Refuge in the United States, located approximately 16 miles (26 km) northwest of Denver, Colorado. The refuge is situated west of the cities of Broomfield and Westminster and situated north of the city of Arvada.

<span class="mw-page-title-main">Brown & Bryant</span>

Brown & Bryant Inc. was a chemical distribution company located in Arvin, California in Kern County. The land the company operated on is designated as a U.S. Environmental Protection Agency (EPA) Superfund cleanup site. The company was a formulator of agricultural chemicals including fertilizers, herbicides, insecticides, and fumigants.

The Del Amo Superfund Site is located in southern Los Angeles County between the cities of Torrance and Carson. It is a U.S. EPA Region 9 Superfund Site. The waste-disposal site of a rubber manufacturer is one of 94 Superfund Sites in California as of November 29, 2010.

<span class="mw-page-title-main">Koppers Co., Inc. Superfund Site</span>

The Koppers Co., Inc. (KCI) Superfund Site is one of three Superfund sites in Oroville, California, along with Louisiana Pacific Sawmill and Western Pacific Railyard. The KCI Superfund Site is a 200-acre site which served as a wood treatment plant for 50 years. Wood was treated with many chemicals to prevent wood deterioration. The accumulation of these chemicals from spills, fires, and uses has caused this site to be contaminated with the hazardous waste material. Due to soil and groundwater contamination, the site was placed on the National Priorities List in 1984 for remedial action plans to clean up the site to protect surrounding residential areas concerning environmental and human health risks.

The Ashland/Northern States Power Lakefront Superfund site is a contaminated region of the Wisconsin shoreline of Lake Superior that is being studied for remediation by Northern States Power Wisconsin (NSPW), as well as the Environmental Protection Agency (EPA), the Wisconsin Department of Natural Resources (WDNR). This site has held a manufactured gas plant from 1845 to 1947, as well as lumber manufacturing and treatment mills for four decades at the start of the 20th century, railcar loading facilities, and a municipal landfill. Additionally, a wastewater treatment plant is located on the premises, but is not in operation. Contamination of the site is currently believed to have been caused by all the parties mentioned above, or former owners of the property whose companies are no longer in business. The area is listed as a Superfund site by the EPA under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Releases of hazardous substances occurred onshore and migrated into sediment in Chequamagon Bay on Lake Superior.

<span class="mw-page-title-main">The Waste Disposal Inc. Superfund site</span> Waste disposal

The Waste Disposal Inc. Superfund site is an oil-related contaminated site in the highly industrialized city of Santa Fe Springs in Los Angeles County, California. It is approximately 38 acres (15 ha), with St Paul's high school immediately adjacent to the northeast corner of the site. Approximately 15,000 residents of Santa Fe Springs obtain drinking water from wells within three miles (4.8 km) of the site.

<span class="mw-page-title-main">California Gulch</span>

The California Gulch site consists of approximately 18 square miles in Lake County, Colorado. The area includes the city of Leadville, parts of the Leadville Historic Mining District and a section of the Arkansas River from the confluence of California Gulch downstream to the confluence of Two-Bit Gulch. The site was listed as a Superfund site in 1983.

Water in Arkansas is an important issue encompassing the conservation, protection, management, distribution and use of the water resource in the state. Arkansas contains a mixture of groundwater and surface water, with a variety of state and federal agencies responsible for the regulation of the water resource. In accordance with agency rules, state, and federal law, the state's water treatment facilities utilize engineering, chemistry, science and technology to treat raw water from the environment to potable water standards and distribute it through water mains to homes, farms, business and industrial customers. Following use, wastewater is collected in collection and conveyance systems, decentralized sewer systems or septic tanks and treated in accordance with regulations at publicly owned treatment works (POTWs) before being discharged to the environment.

The Nebraska Ordnance Plant is a former United States Army ammunition plant located approximately ½ mile south of Mead, Nebraska and 30 miles west of Omaha, Nebraska in Saunders County. It originally extended across 17,250 acres (69.8 km2) producing weapons from 1942-45 after which the Army used it as a bomb factory during the Vietnam War. Environmental investigations in the 1980's found the soil and groundwater contaminated with the explosive RDX and the degreaser trichloroethylene. In 1990, federal agencies added the site to the National Priorities List as a Superfund site. Remediation included soil excavation and water treatment, the latter of which has been ongoing since 1997. Water is contained and treated at 4 treatment plants and the known plumes are monitored at hundreds of wells. The latest wells, dug deeper into the bedrock than previously, showed RDX and TCE above desired action levels in April 2016.

Kauffman & Minteer Inc. (K&M) was an industrial transportation company that operated from 1960 to 1981 in Burlington County, New Jersey. After cleaning their trucks, they dumped the waste water into a nearby lagoon that was not properly lined. The lagoon flooded and the waste water containing chemicals, migrated over to wetlands, causing damage to vegetation and seeping into underground drinking water. The Environmental Protection Agency (EPA) got involved in 1989 and conducted a few remediation attempts but the extent of the damage is hard to determine as the different underground pathways of water are unpredictable. The site is currently an active superfund site that is closely monitored by the EPA.

Brook Industrial Park (BIP) is an industrial area occupying 4.5 acres of the Borough of Bound Brook, New Jersey, in the United States of America. It is located on the northern bank of the Raritan River. Industrial, chemical and pesticide operations began in 1971 and eventually lead to the contamination of groundwater and exposure of workers to harmful dioxins. Throughout 1980 to 1988 the United States Environmental Protection Agency (EPA) and the New Jersey Department of Environmental Protection (NJDEP) conducted studies to determine if there were any threats being posed on the workers, community or environment by the BIP companies in their disposal of processed and stored chemicals.

Price Landfill is a 26-acre site located in Pleasantville, Egg Harbor Township, Atlantic County, New Jersey. Price Landfill is also known as Price Sanitary Landfill, Prices Pit, Price Landfill No.1 and Price Chemical Dump. The United States Environmental Protection Agency (USEPA) added Price Landfill to the Superfund National Priorities List on September 20, 1983, because of the hazardous chemicals found on the site and in the groundwater. The site was originally owned by Mr. Charles Price and was used to mine sand and gravel, which was shut down in 1968. The site was then turned into a private landfill in 1969 and then a commercial solid waste landfill in 1971. At this point the landfill was used to dispose of liquid waste by companies, specifically Atlantic City Electric Company. The liquid waste consisted of industrial chemicals, oils and greases/sludges, septic tank and sewer wastes, which were disposed on the site for 8 years, ending altogether in 1976, but in the meantime, having contaminated the groundwater, soil, air, and nearby creeks, specifically Absecon Creek. Chemicals dumped on the site are believed to be 1,2-Dichloroethane, arsenic, benzene, chloroform, lead, and vinyl chloride, all of which contaminated the groundwater, soil, air, and nearby creeks. The USEPA originally got involved in 1982 by beginning to correct the damage. Currently the USEPA states that they are continuing to monitor and treat the groundwater and land, and that hazards to humans are controlled.

<span class="mw-page-title-main">Ohio River Park</span> Contaminated site in Pennsylvania, U.S.

Ohio River Park is a Superfund Site located in Neville Island, Pennsylvania. Between the 1920s-1970s, the Site was used for municipal waste, pesticide manufacturing, coke sludge disposal, cement manufacturing disposal, and pesticide waste. In 1977, Neville Land Company donated the Site to Allegheny County who started developing the Site as a community park. In 1979, Allegheny County found various hazardous contaminants on the Site. On August 30, 1990, the Site was determined to be a Superfund Site due to VOCs, SVOCs, inorganics, and pesticides being present in the surface soil, subsurface soil, surface water, river sediment, and groundwater. Soil remediation began in February 1998 and ended in September 1999. Today, Ohio River Park has the Robert Morris University Island Sports Center and Coraopolis Bridge on top of it. Additionally, benzene continues to be monitored because it is still present in the Site's groundwater.

References

  1. 1 2 "History of Rocky Mountain Arsenal" (PDF). Rocky Mountain Arsenal Information Center. May 1980. Archived (PDF) from the original on June 4, 2011. Retrieved November 10, 2019.
  2. US EPA, OLEM (November 9, 2017). "What is Superfund?". US EPA. Retrieved November 11, 2019.
  3. 1 2 Salcido, Rachael (2014). "The Rocky Mountain Arsenal National Wildlife Refuge: On a Rocky Road to Creating a Community Asset". John Marshall Law Review. 47 (4): 1401. Retrieved November 11, 2019.
  4. "Remediation Management of Complex Sites, Case Study 6.4 Rocky Mountain Arsenal, Colorado". Interstate Technology Regulatory Council. Retrieved November 11, 2019.
  5. "Site History". Rocky Mountain Arsenal. Rocky Mountain Arsenal Remediation Venture Office. Archived from the original on December 8, 2013. Retrieved November 11, 2019.
  6. "A Brief History of Rocky Mountain Arsenal" (PDF). RMA Fact Sheets. Rocky Mountain Arsenal Remediation Venture Office. Archived from the original (PDF) on February 17, 2013. Retrieved November 11, 2019.
  7. Shannon, Brian (1997). "ARSENAL Base Clean-Up". ICE Case Studies. American University. Archived from the original on July 9, 2015. Retrieved July 9, 2015.
  8. 1 2 "Deep Injection Well Fact Sheet". RMA Fact Sheets. Rocky Mountain Arsenal Remediation Venture Office. Archived from the original on November 8, 2013.
  9. "Colorado Earthquake History". Earthquake Hazards Program. United States Geological Survey. January 14, 2015. Archived from the original on July 9, 2015. Retrieved July 9, 2015.
  10. Warner, J.; Abdel-Rahman, A.; Tamayo-Lara, C.; May, J. "Remediation of Groundwater Contamination at the Rocky Mountain Arsenal: Numerical and Geostatistical Analysis" (PDF). US Nuclear Regulatory Commission . Retrieved November 11, 2019.
  11. 1 2 3 4 "Rocky Mountain Arsenal". Colorado Department of Public Health and Environment. n.d. Retrieved November 11, 2019.
  12. Knappe, Doug (September 16, 2017). "Colorado Sues Government Over Rocky Mountain Arsenal Site" . Retrieved March 11, 2018.
  13. "Rocky Mountain Arsenal Oversight Program FAQs". Tri-County Health Department.
  14. Rickard, Russel (May 2010). Rocky Mountain Arsenal Medical Monitoring Program Surveillance for Birth Defects Compendium. Colorado Department of Public Health and Environment.
  15. Update of cancer incidence in northeast Denver residents living in the vicinity of the Rocky Mountain Arsenal 1997–2005 data review. Colorado Department of Public Health and Environment. May 2010.
  16. Reif, JS (1993). "Risk factors for exposure to arsenic at a hazardous waste site". Journal of Exposure Analysis and Environmental Epidemiology. 3 (1): 73–86.
  17. Reif, JS (October 1993). "Two-stage evaluation of exposure to mercury and biomarkers of neurotoxicity at a hazardous waste site". Journal of Toxicology and Environmental Health. 40 (2): 413–422. Bibcode:1993JTEH...40..413R. doi:10.1080/15287399309531808. PMID   8230312.
  18. Mears, Connally; Heise, Elaine (1992). "The Rocky Mountain Arsenal: Groundwater Contamination and Clean-Up Activities". Uncovering the Hidden Resource: Groundwater Law, Hydrology, and Policy in the 1990s.
  19. Pimentel, David (2005). "Environmental and Economic Costs of the Application of Pesticides Primarily in the United States". Environment, Development and Sustainability. 7 (2): 229–252. Bibcode:2005EDSus...7..229P. doi:10.1007/s10668-005-7314-2.
  20. Pimentel, David; Andow, David; Dyson-Hudson, Rada; Gallahan, David; Jacobson, Stuart; Irish, Molly; Kroop, Susan; Moss, Anne; Schreiner, Ilse; Shepard, Mike; Thompson, Todd; Vinzant, Bill (1980). "Environmental and social costs of pesticides: A preliminary assessment". Oikos. 34 (2): 126–140. Bibcode:1980Oikos..34..126P. doi:10.2307/3544173. JSTOR   3544173.