The Rugeley power stations were a series of two coal-fired power stations located on the River Trent at Rugeley in Staffordshire. The first power station on the site, Rugeley A power station was opened in 1961, but has since been closed and demolished. Rugeley B power station was commissioned in 1970, and closed on 8 June 2016. [1] The cooling towers of which were demolished on 6 June 2021. It had an output of 1,000 megawatts (MW) and had a 400 kilovolt (kV) connection to the national grid. The B station provided enough electricity to power roughly half a million homes. [2]
Rugeley power station A | |
---|---|
Country | England |
Location | Rugeley |
Status | Closed |
Construction began | 1956 |
Commission date | 1961 [3] |
Decommission date | 1995 [4] |
Operator(s) |
|
Thermal power station | |
Primary fuel | Coal |
Power generation | |
Nameplate capacity | 600 MW |
External links | |
Commons | Related media on Commons |
Construction of the A station started in 1956. [4] The station's generating sets were commissioned between 1961 and 1962. [5] The station was the first joint venture between the Central Electricity Generating Board (CEGB) and the National Coal Board (NCB). The station took coal directly from the neighbouring Lea Hall Colliery by conveyor belt. [4] This was the first such arrangement in Britain. The colliery was put into production some 6 months before the first generating unit was commissioned in the power station. The station was officially opened on 1 October 1963 by Lord Robens of Woldingham and Sir Christopher Hinton.
The first of the five cooling towers to be completed at Rugeley in 1960 was the world's first large dry cooling tower and the first large scale experiment with a design aimed at eliminating water loss. [4] The dry tower was commissioned in 1962 but its capital and operating costs were considerably higher than a conventional wet tower. No further dry towers were constructed in the UK. [6] On occasions this tower was used by the RAF for parachute development. Rugeley A was also the first power station in Britain to be controlled entirely from a central control room. [4] The total cost of building it was £30 million.
The station had five 120 MW generating sets which gave it a generating capacity of 600 megawatts (MW). The boilers operated on pulverised coal and delivered 540 kg/s of steam at 103.4 bar and 538 °C. [7] Rugeley A was one of the CEGB's twenty steam power stations with the highest thermal efficiency; in 1963–4 the thermal efficiency was 33.34 per cent, 31.75 per cent in 1964–5, and 31.42 per cent in 1965–6. [8] In 1980–1 the station sent out 2,612.838 GWh, the thermal efficiency was 29.56 per cent. [7] The annual electricity output of Rugeley A was: [7] [9]
Year | 1960–1 | 1961–2 | 1962–3 | 1963–4 | 1964–5 | 1965–6 | 1966–7 | 1971–2 | 1978–9 | 1980–1 | 1981–2 |
---|---|---|---|---|---|---|---|---|---|---|---|
Electricity supplied, GWh | 119.2 | 1,379.2 | 2,873.1 | 3,361 | 3,058 | 2,953 | 3,309 | 2,544 | 2,633.9 | 2,612.8 | 2,433 |
Thermal efficiency, % | 31.12 | 32.81 | 33.01 | 33.34 | 31.75 | 31.42 | 31.75 | 30.54 | 30.08 | 29.56 | 30.94 |
The closure of the A station began in 1994. Two of the station's generating units were decommissioned, with the other three following in 1995. [5] Having burned nearly 42 million tonnes of coal in its lifetime, [4] the station was demolished later in 1996. [1]
First ran [5] | Closing date | Total run (hours) | Total starts | Total generation (GWh) | |
---|---|---|---|---|---|
Unit 1 | 1961 | 1994 | 196,049 | 3,719 (3,260 hot, 459 cold) | 20,097 |
Unit 2 | 1961 | 1995 | 180,781 | 4,948 (4,577 hot, 371 cold) | 18,882 |
Unit 3 | 1961 | 1995 | 154,621 | 4,220 (3,701 hot, 519 cold) | 15,912 |
Unit 4 | 1962 | 1994 | 169,201 | 4,404 (3,997 hot, 407 cold) | 17,526 |
Unit 5 | 1962 | 1995 | 168,670 | 3,817 (3,420 hot, 397 cold) | 17,261 |
Total coal burnt during lifetime: 41,869,969 tonnes
Rugeley B Power Station | |
---|---|
Country | England |
Location | Rugeley |
Coordinates | 52°45′22″N1°54′58″W / 52.756°N 1.916°W |
Status | Decommissioned |
Construction began | 1964 [10] |
Commission date | 1970 [11] |
Decommission date | 8 June 2016 |
Owner(s) | Engie |
Operator(s) |
|
Thermal power station | |
Primary fuel | Coal |
Power generation | |
Nameplate capacity | 1,000 MW |
External links | |
Website | www |
Commons | Related media on Commons |
grid reference SK056177 |
Construction of Rugeley B power station began in 1964, with completion of the station in 1970. [10] [11] The architects were L. K. Watson and H. J. Coates. [12] The architects coloured two of the four cooling towers a pinkish red colour to heighten what they saw as the femininity of the hyperbolic form. [12] With both stations in operation, 850 people were employed at the stations in 1983. [4]
The two stations were initially operated by the Central Electricity Generating Board, but following privatisation in 1990, were handed over to National Power. The Lea Hall colliery was closed on 24 January 1991, meaning all coal burned in the stations needed to be delivered by rail. [4] Rugeley B was supplied with fuel via branch off the adjacent Cannock and Rugeley railway line, near to its connection with the West Coast Main Line. Rail facilities included a west-facing junction on the Rugeley line, A and B sidings, gross-weight and tare-weight weighbridges, a hopper house, an oil siding, a hopper bypass line and a run-round loop. [13]
In July 1996 the Rugeley B power station was bought by Eastern Generation, itself acquired by TXU Europe. Rugeley B was subsequently sold to International Power plc in July 2001. [14] It remains under the same ownership, though International Power later merged with GDF Suez in 2011.
Construction of a flue-gas desulfurization plant started in early 2007 and it was commissioned at the B station in 2009. This allowed the station to comply with environmental legislation in force at the time and continue generating electricity. [15] As well as FGD, a new chimney stack was built and attached to the plant due to the original chimney having a major issue where it was rocking in high winds and a concern it was going to collapse. The original chimney was decommissioned and demolished in 2006, then the new one alongside the FGD plant was commissioned in 2009.
In March 2012 Rugeley Power Ltd announced it would be considering a conversion to run using biomass fuel. [16] In December 2013, Rugeley Power Ltd said they have scrapped the proposed biomass conversion. [17] In 2014, there were 146 people employed at the station. [4]
The Rugeley B station used two 500 MW generating sets, which could produce 8,760,000 MWh each year. [18] The station usually burned 1.6 million tonnes of coal a year, producing 240,000 tonnes of ash. [19] The station's boilers produced 1,100 tonnes of steam per hour, at a temperature of 568 °C. [4] In 1980–1 the station sent out 6,724.920 GWh, the thermal efficiency was 35.47 per cent. [7] Rugeley B also had two gas turbine generators installed, each of 25 MW capacity, which were used for emergency unit starts or could generate direct to the grid when required. It closed in 2016, as a result of a deterioration of market conditions. 30 of the 150 staff remained to decommission the plant over three years. [20]
The Rugeley B Station chimney was 600 ft (183m) in height, each of the four remaining cooling towers were 380 ft (114m) and main boiler/generator house was 245 ft (74m) high. [1]
In February 2016 it was announced that the power station would close in the summer of 2016. [1] An announcement by owners, Engie blamed a deterioration in market conditions which included a fall in market prices and increasing carbon costs. The closure resulted in the loss of 150 jobs. [21]
Rugeley Power Station ceased all operations on Wednesday 8 June 2016. Decommissioning began in June 2016. A total of 6 blowdown demolitions took place for the removal of the turbine hall and boiler house in several phases between November 2019 and August 2020. [3] [22] [23] The 600 ft chimney was demolished on 24 January 2021 at 8:32am. [24] The four cooling towers were demolished on 6 June 2021 at 11:25am. [25] [26] The site of the former station is expected to become a residential area. [27] [28]
First ran | Last run | Total run (hours) | Total starts | Total generation (GWh) | |
---|---|---|---|---|---|
Unit 6 | 09/01/1970 | 08/06/2016 | 285,595 | 2,764 (2313 hot, 451 cold) | 125,776 |
Unit 7 | 15/10/1970 | 30/12/2015 | 125,776 | 2,705 (2318 hot, 387 cold) | 123,501 |
The Ironbridge power stations refers to a series of two power stations that occupied a site on the banks of the River Severn at Buildwas in Shropshire, England. The Ironbridge B Power Station was operated by E.ON UK but the site is now owned by Haworth Group. The station stands near the Ironbridge Gorge World Heritage Site. Originally powered by coal, they were converted to use 100% biomass fuel. Ironbridge B Power Station stopped generating electricity on 20 November 2015, with the decommissioning process continuing into 2017. The main phase of the 27-month demolition process began at 11:00 GMT on 6 December 2019, commencing with the four cooling towers.
The Ferrybridge power stations were a series of three coal-fired power stations on the River Aire near Ferrybridge in West Yorkshire, England, in operation from 1927 to 2016 on a site next to the junction of the M62 and A1(M) motorways.
Drakelow Power Station refers to a series of three now decommissioned and demolished coal-fired power stations located 2.4 mi (3.9 km) south of Burton upon Trent, Staffordshire in the West Midlands of England, on the River Trent. However, the station was actually located in the county of Derbyshire, in the East Midlands. The power station was a distinguishable landmark of Burton, which is most famous for its breweries.
Agecroft power station was a coal-fired power station between the eastern bank of the Manchester, Bolton and Bury Canal and the western bank of the River Irwell at Pendlebury, near Manchester, England. It operated between 1925 and 1993, and was demolished in 1994. HM Prison Forest Bank has since been built on the site.
The Littlebrook Power Station were a series of four oil and coal-fired power stations situated on the south bank of the River Thames, next to the Queen Elizabeth 2 Bridge and the Dartford Tunnel in Dartford, Kent. The final power station, Littlebrook D, ceased operating in March 2015, and has now been demolished.
Little Barford Power Station is a gas-fired power station just north of the village of Little Barford in Bedfordshire, England. It lies just south of the A428 St Neots bypass and east of the Wyboston Leisure Park. The River Great Ouse runs alongside. It was formerly the site of two coal-fired power stations, now demolished. The station is operated by RWE.
Barton Power Station was a coal-fired power station on the Bridgewater Canal in Trafford Park, near Eccles, Lancashire, England.
High Marnham Power Station was a coal fuelled power station in Nottinghamshire, to the west of the River Trent, approximately 0.5 miles (0.8 km) north of the village of Marnham. Construction site clearance began in November 1955, No. 1 Unit power generation commenced in October 1959, and the station became fully operational in June 1962. The plant operated until 2003 when it was decommissioned, though the cooling towers weren't demolished until 2012.
Ince Power Station refers to two demolished power stations near Ellesmere Port in Cheshire, North West England.
Hams Hall Power Station refers to a series of three, now demolished coal-fired power stations, situated in Warwickshire in the West Midlands of England, 9 miles (14 km) from Birmingham.
Chadderton Power Station refers to a series of two coal-fired power stations, which were situated at Chadderton, Greater Manchester in North West England.
Stuart Street Power Station was a coal-fired power station in Bradford, Manchester, England.
Willington Power Station is a pair of partly demolished coal-fired power stations that were constructed in the 1950s. The two stations were built on a site off Twyford Road, between Willington and Findern in Derbyshire, England. The two power stations had an installed capacity totaling 804 MW. The two stations consisted of the 'A' Station, and the 'B' Station.
Meaford Power Station was a coal-fired power station situated on the River Trent at Meaford near Stone in Staffordshire.
Bold Power Station refers to a series of two coal-fired power stations in Bold near St Helens, Merseyside, North West England. They were closed, decommissioned and demolished between 1981 and 1992, and a housing estate now occupies the site.
Kirkstall power station was a coal-fired unit opened in 1930, serving the city of Leeds, West Yorkshire, England.
Cliff Quay Power Station was a coal-fired power station situated to the south of Ipswich, Suffolk in the East of England. The station was designed by Sir Alexander Gibb & Partners and built by the Cleveland Bridge Company.
Skelton Grange Power Station refers to two now-demolished coal fired power stations that served the city of Leeds and surrounding areas. They were located in the Stourton area of the city. The power stations were built in the early 1950s and early 1960s, taken out of use in 1983 and 1994 and subsequently dismantled but the associated 275 kV switching substation was retained and remains in use.
Bromborough power stations are three electricity generating stations that supplied power to industrial and domestic users in Bromborough, Port Sunlight and the wider Wirral area from 1918 until 1998. Bromborough power station provided public electricity supplies from 1951 to 1980. Central power station Bromborough (1918–1998) was originally owned by Lever Brothers and supplied electricity to domestic users in Port Sunlight as well as electricity and steam to industrial users. Merseyside power station Bromborough (1958–1998) was also owned by Unilever and provided electricity and steam at a range of pressures to industrial users in the locality. All three power stations at Bromborough have been demolished.
Stourport power stations were two electricity generating stations that supplied electricity to Stourport-on-Severn, Worcestershire and to the wider West Midlands area from 1927 to 1984. The two stations, A (1927–78) and B (1950–84), were collocated on a joint site adjacent to the River Severn south of Stourport-on-Severn.
Media related to Rugeley Power Station at Wikimedia Commons