Changchun at Rushan, 2019 | |
History | |
---|---|
Soviet Union | |
Name | Reshitelny |
Ordered | 2nd Five-Year Plan |
Builder | |
Laid down |
|
Launched | 30 April 1940 |
Completed | 5 September 1941 |
Stricken | 17 February 1956 |
Fate | Transferred to the People's Liberation Army Navy, 14 January 1955 |
People's Republic of China | |
Name | Changchun |
Acquired | 14 January 1955 |
Reclassified | As a missile destroyer, 1974 |
Stricken | August 1990 |
Fate | Museum ship, 1990 |
General characteristics (Gnevny as completed, 1938) | |
Class and type | Gnevny-class destroyer |
Displacement | 1,612 t (1,587 long tons) (standard) |
Length | 112.8 m (370 ft 1 in) (o/a) |
Beam | 10.2 m (33 ft 6 in) |
Draft | 4.8 m (15 ft 9 in) |
Installed power |
|
Propulsion | 2 shafts; 2 geared steam turbines |
Speed | 38 knots (70 km/h; 44 mph) |
Range | 2,720 nmi (5,040 km; 3,130 mi) at 19 knots (35 km/h; 22 mph) |
Complement | 197 (236 wartime) |
Sensors and processing systems | Mars hydrophone |
Armament |
|
Reshitelny was one of 29 Gnevny-class destroyers (officially known as Project 7) built for the Soviet Navy during the late 1930s. Originally named Pospeshny, she was renamed Reshitelny before completion in 1941, and was assigned to the Pacific Fleet. She was sold to People's Liberation Army Navy in 1955 and renamed Changchun. Currently she is preserved as a museum ship.
Having decided to build the large and expensive 40- knot (74 km/h; 46 mph) Leningrad-class destroyer leaders, the Soviet Navy sought Italian assistance in designing smaller and cheaper destroyers. They licensed the plans for the Folgore class and, in modifying it for their purposes, overloaded a design that was already somewhat marginally stable. [1]
The Gnevnys had an overall length of 112.8 meters (370 ft 1 in), a beam of 10.2 meters (33 ft 6 in), and a draft of 4.8 meters (15 ft 9 in) at deep load. The ships were significantly overweight, almost 200 metric tons (197 long tons ) heavier than designed, displacing 1,612 metric tons (1,587 long tons) at standard load and 2,039 metric tons (2,007 long tons) at deep load. Their crew numbered 197 officers and sailors in peacetime and 236 in wartime. [2] The ships had a pair of geared steam turbines, each driving one propeller, rated to produce 48,000 shaft horsepower (36,000 kW ) using steam from three water-tube boilers which was intended to give them a maximum speed of 37 knots (69 km/h; 43 mph). [3] The designers had been conservative in rating the turbines and many, but not all, of the ships handily exceeded their designed speed during their sea trials. Others fell considerably short of it, although specific figures for most individual ships have not survived. Variations in fuel oil capacity meant that the range of the Gnevnys varied between 1,670 to 3,145 nautical miles (3,093 to 5,825 km; 1,922 to 3,619 mi) at 19 knots (35 km/h; 22 mph). [4]
As built, the Gnevny-class ships mounted four 130-millimeter (5.1 in) B-13 guns in two pairs of superfiring single mounts fore and aft of the superstructure. Anti-aircraft defense was provided by a pair of 76.2-millimeter (3 in) 34-K AA guns in single mounts and a pair of 45-millimeter (1.8 in) 21-K AA guns [5] as well as two 12.7-millimeter (0.50 in) DK or DShK machine guns. They carried six 533 mm (21.0 in) torpedo tubes in two rotating triple mounts; each tube was provided with a reload. The ships could also carry a maximum of either 60 or 95 mines and 25 depth charges. They were fitted with a set of Mars hydrophones for anti-submarine work, although they were useless at speeds over 3 knots (5.6 km/h; 3.5 mph). [6] The ships were equipped with two K-1 paravanes intended to destroy mines and a pair of depth-charge throwers. [7]
Major components for the ship that became Reshitelny were laid down at Shipyard No. 198 (Andre Marti South) in Nikolayev on 23 August 1936 as yard number 324 and were then railed to Shipyard No. 199 at Komsomolsk-on-Amur, Siberia, for completion where the ship was laid down again on 23 August 1937 as Pospeshny. She was launched on 30 April 1940 and was renamed Reshitelny on 25 August before she was commissioned on 5 September 1941. [8] She was sold to China in 1955 and renamed Changchun and decommissioned in the 1990. She is currently a museum ship in Rushan, Shandong.
Gremyashchy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Baltic Fleet and was later transferred to the Northern Fleet in 1941.
Gnevny was the lead ship of her class of 29 destroyers built for the Soviet Navy during the late 1930s. Completed in 1938, she was assigned to the Baltic Fleet and played a minor role in the 1939–1940 Winter War when the Soviet Union invaded Finland. A few days after the start of the German invasion of the Soviet Union in June 1941, the ship struck a German mine and was badly damaged. After taking off the survivors, the Soviets failed to sink Gnevny with gunfire before they withdrew and the abandoned wreck drifted until she was sunk by German bombers three days later.
Grozyashchy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Baltic Fleet and played a minor role in the Winter War of 1939–1940 against the Finns. After the start of the German invasion of the Soviet Union in June 1941, Grozyashchy participated in the Gulf of Riga Campaign and laid minefields in the Gulf of Finland. She was badly damaged by a mine in July and was under repair for over a month. The ship was crippled by German bombs in late September and did not become operational for almost a year. Grozyashchy provided naval gunfire support in 1944 for the Leningrad–Novgorod Offensive.
Gordy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1938, she was assigned to the Baltic Fleet. The ship was covering a minelaying operation after the start of the German invasion of the Soviet Union in June 1941 when she entered a German minefield. One of her sister ships had her bow blown off and Gordy rescued the survivors. The ship provided naval gunfire support for Soviet ground forces over the next several months, although she was badly damaged by a mine during the evacuation of Tallinn, Estonia, in August. After repairs, Gordy was assigned to evacuate Soviet troops from their enclave in Hanko, Finland, in November, but struck several mines en route and sank with heavy loss of life.
Steregushchy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Baltic Fleet. The ship played a minor role in the Winter War of 1939–1940 against the Finns. After the start of the German invasion of the Soviet Union in June 1941, Steregushchy participated in the Gulf of Riga Campaign. The ship briefly provided naval gunfire support during the Siege of Leningrad before she was sunk by German dive bombers on 21 September. Her wreck was refloated in 1944, although the repairs were not completed until 1948. Steregushchy was broken up for scrap in 1959.
Stremitelny was one of 29 Gnevny-class destroyer built for the Soviet Navy during the late 1930s. Completed in 1938, the ship was assigned to the Baltic Fleet and played a minor role in the 1939–1940 Winter War against Finland. Stremitelny was transferred to the Northern Fleet in mid-1940. After the start of the German invasion of the Soviet Union in June 1941, she covered an amphibious landing along the Arctic coast. The ship was attacked and sunk by German dive bombers the following month in Polyarny with the loss of 111 crew and passengers. Her wreck was partially salvaged the following year.
Smetlivy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1938, she was assigned to the Baltic Fleet and played a minor role in the 1939–1940 Winter War against Finland. After the start of the German invasion of the Soviet Union in June 1941, the ship participated in the Gulf of Riga Campaign before withdrawing to Tallinn, Estonia. Smetlivy supported Soviet forces during the defense of Tallinn in August and covered the subsequent evacuation to Leningrad. The ship provided naval gunfire support to the defenders of Leningrad over the next several months before she was assigned to evacuate Soviet troops from their enclave in Hanko, Finland, in November. Smetlivy struck several mines returning from Hanko and sank with heavy loss of life.
Bystry was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Black Sea Fleet. When the German invasion of the Soviet Union began in June 1941, the ship was under repair. Bystry struck a mine and sank in July. Her wreck was raised, but was too badly damaged for immediate repairs. She was later sunk by German bombs and her wreck had the bow salvaged to repair one of her sisters.
Bezuprechny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Black Sea Fleet. After the German invasion of the Soviet Union in June 1941, the ship laid minefields and participated in the Siege of Odessa, ferrying men and supplies to the beleaguered city and providing naval gunfire support. Bezuprechny was damaged by German aircraft in September and was under repair for most of the rest of the year. During the Siege of Sevastopol, the ship resumed her duties in late December, only with a different destination. She was sunk by German aircraft while transporting supplies and troops on 26 June 1942 with the loss of approximately 300 crewmen and 320 passengers.
Bditelny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Black Sea Fleet. After the German invasion of the Soviet Union began in 1941, the ship provided naval gunfire support during the Siege of Odessa. Frequently under repair due to running aground in 1941, Bditelny was unable to support the defenders of Sevastopol until early 1942 when she began to ferry supplies and troops there while also bombarding German positions outside the besieged city. She was sunk during a German airstrike in July when some of her torpedoes exploded. Her wreck was salvaged for scrap between 1948 and 1952.
Rezvy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1940, she was assigned to the Pacific Fleet.
Rastoropny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1940, she was assigned to the Pacific Fleet.
Razyashchy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1940, she was assigned to the Pacific Fleet and served until her sinking in 1961.
Ryany was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Pacific Fleet.
Rezky was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1942, she was assigned to the Pacific Fleet.
Rekordny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1941, she was assigned to the Pacific Fleet.
Retivy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1941, she was assigned to the Pacific Fleet.
Revnostny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1941, she was assigned to the Pacific Fleet.
Redky was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Originally named Pylky, she was renamed Redky before completion in 1942, and was assigned to the Pacific Fleet.
Statny was one of 18 Storozhevoy-class destroyers built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Statny was completed in 1941 to the modified Project 7U design.