Besposhchadny at sea | |
History | |
---|---|
Soviet Union | |
Name | Besposhchadny |
Ordered | 2nd Five-Year Plan |
Builder | Shipyard No. 198 (Andre Marti (South)), Nikolayev |
Laid down | 15 May 1936 |
Launched | 5 December 1936 |
Completed | 22 August 1939 |
Commissioned | 2 October 1939 |
Honors and awards | Order of the Red Banner, 4 April 1942 |
Fate | Sunk by aircraft, 6 October 1943 |
General characteristics (Gnevny as completed, 1938) | |
Class and type | Gnevny-class destroyer |
Displacement | 1,612 t (1,587 long tons) (standard) |
Length | 112.8 m (370 ft 1 in) (o/a) |
Beam | 10.2 m (33 ft 6 in) |
Draft | 4.8 m (15 ft 9 in) |
Installed power |
|
Propulsion | 2 shafts; 2 geared steam turbines |
Speed | 38 knots (70 km/h; 44 mph) |
Range | 2,720 nmi (5,040 km; 3,130 mi) at 19 knots (35 km/h; 22 mph) |
Complement | 197 (236 wartime) |
Sensors and processing systems | Mars hydrophone |
Armament |
|
Besposhchadny was one of 29 Gnevny-class destroyers (officially known as Project 7) built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Black Sea Fleet. After the start of the German invasion of the Soviet Union (Operation Barbarossa) in June 1941, the ship helped to lay minefields off Sevastopol. During the Siege of Odessa the ship transported troops and supplies while providing naval gunfire support to the defenders until she was crippled by German dive bombers in September. Besposhchadny was further damaged by bombs while still under repair in November and they were not completed for almost another year.
The ship ferried troops and supplies for the rest of the year and then provided fire support during an amphibious landing behind German lines in the Caucasus in February 1943. She later bombarded Axis positions and unsuccessfully attempted to intercept German convoys off the Crimea. After a one such attempt, Besposhchadny and two other destroyers were attacked by German aircraft in October. After repeated attacks, she was sunk with only 41 survivors.
Having decided to build the large and expensive 40- knot (74 km/h; 46 mph) Leningrad-class destroyer leaders, the Soviet Navy sought Italian assistance in designing smaller and cheaper destroyers. They licensed the plans for the Folgore class and, in modifying it for their purposes, overloaded a design that was already somewhat marginally stable. [1]
The Gnevnys had an overall length of 112.8 meters (370 ft 1 in), a beam of 10.2 meters (33 ft 6 in), and a draft of 4.8 meters (15 ft 9 in) at deep load. The ships were significantly overweight, almost 200 metric tons (197 long tons ) heavier than designed, displacing 1,612 metric tons (1,587 long tons) at standard load and 2,039 metric tons (2,007 long tons) at deep load. Their crew numbered 197 officers and sailors in peacetime and 236 in wartime. [2] The ships had a pair of geared steam turbines, each driving one propeller, rated to produce 48,000 shaft horsepower (36,000 kW ) using steam from three water-tube boilers which was intended to give them a maximum speed of 37 knots (69 km/h; 43 mph). [3] The designers had been conservative in rating the turbines and many, but not all, of the ships handily exceeded their designed speed during their sea trials. Variations in fuel oil capacity meant that the range of the Gnevnys varied between 1,670 to 3,145 nautical miles (3,093 to 5,825 km; 1,922 to 3,619 mi) at 19 knots (35 km/h; 22 mph). [4]
As built, the Gnevny-class ships mounted four 130-millimeter (5.1 in) B-13 guns in two pairs of superfiring single mounts fore and aft of the superstructure. Anti-aircraft defense was provided by a pair of 76.2-millimeter (3 in) 34-K AA guns in single mounts and a pair of 45-millimeter (1.8 in) 21-K AA guns [5] as well as two 12.7-millimeter (0.50 in) DK or DShK machine guns. They carried six 533 mm (21.0 in) torpedo tubes in two rotating triple mounts; each tube was provided with a reload. The ships could also carry a maximum of either 60 or 95 mines and 25 depth charges. They were fitted with a set of Mars hydrophones for anti-submarine work, although they were useless at speeds over 3 knots (5.6 km/h; 3.5 mph). [6] The ships were equipped with two K-1 paravanes intended to destroy mines and a pair of depth-charge throwers. [7]
Built in Nikolayev's Shipyard No. 198 (Andre Marti (South)) as yard number 322, Besposhchadny was laid down on 15 May 1936. The ship was completed on 22 August 1939 [8] and was commissioned into the Black Sea Fleet on 2 October 1939. [9] When the Germans invaded the Soviet Union on 22 June 1941, the ship was assigned to the 2nd Destroyer Division of the Black Sea Fleet. On 23–25 June Besposhchadny laid 114 defensive mines off Sevastopol. On 9 July, the 2nd Destroyer Division, including the destroyer leader Kharkov, Besposhchadny and her sister ships Bodry, Boyky and Bezuprechny made an unsuccessful attempt to interdict Axis shipping near Fidonisi. Besposhchadny ran aground near the Eupatoria lighthouse on 14 July and damaged her propellers. After repairs, she began escorting cargo ships to Odessa while also transporting supplies and troops there. In addition, the ship provided gunfire support. On 14–17 August, Besposhchadny escorted the incomplete ships being evacuated from the shipyards at Nikolayev. The destroyer helped to escort transports ferrying the 157th Rifle Division to Odessa on 16–21 September. While providing fire support during the amphibious landing at Grigorievka on 22 September, Besposhchadny was attacked by Junkers Ju 87 Stuka dive bombers of StG 77. They nearly blew her bow off and she steamed to Odessa for emergency repairs. The following day, she was towed, stern-first, to Sevastopol by the destroyer Soobrazitelny. The ship was repaired using the salvaged bow from her sunken sister Bystry. While still under repair, Besposhchadny was attacked by Stukas from StG 77 on 12 November; they hit her once in the aft boiler room and near missed her several times. The bombs badly damaged her propulsion machinery and started a large fire. She was drydocked for emergency repairs on the 14th and was towed to Poti, Georgia three days later by the destroyer Shaumyan for further repairs that lasted until September 1942. [10]
While still under repair, Besposhchadny was awarded the Order of the Red Banner on 4 April. The ship completed her post-repair sea trials and working up by 9 October and helped to ferry the 8th, 9th and 10th Guards Rifle Brigades and other troops from Poti to Tuapse on 19–28 October. On 29 November, Besposhchadny and Boyky were tasked to attack Axis shipping off the Bulgarian coast and to bombard the port of Mangalia, Romania. They failed to locate any ships and mistook coastal rocks for a convoy in heavy fog on 1 December, firing 141 shells from their main guns and six torpedoes at them. Besposhchadny, together with the light cruiser Krasnyi Krym and the destroyer Nezamozhnik, transported the 9th Mountain Rifle Division and other troops from Batumi, Georgia, to Tuapse in early December. Together with Soobrazitelny, Besposhchadny covered the sortie of a division of minesweepers off the Romanian coast and then unsuccessfully patrolled south of Fidonisi themselves on 26–29 December. [11]
The destroyer bombarded German positions around Novorossiysk on 1 February 1943 with 206 shells from her 130 mm guns. On 4 February, she provided fire support during the amphibious landing west of Novorossiysk, firing 151 illumination and 56 high-explosive shells. Besposhchadny fired 105 shells at Axis troops near Anapa on 13 February. During the rest of the month, the ship helped to ferry 8,037 troops from Tuapse to Gelendzhik. On the night of 30 April/1 May, Boyky and Besposhchadny shelled Axis positions on the Kerch Peninsula and then the ship bombarded Alushta on the night of 20/21 May. Boyky and Besposhchadny, together with the destroyer Sposobny made an unsuccessful attempt on 30 September to intercept German transports evacuating troops and equipment from the Kuban Bridgehead. During the night of 5/6 October, Kharkov, Besposhchadny and Sposobny attempted to intercept German evacuation convoys off the Crimean coast, but were again unsuccessful. Kharkov bombarded Yalta and Alushta while the two smaller destroyers steamed to do the same to Feodosia. The latter pair were attacked by five S-boats of the 1st S-Boat Flotilla en route. The Germans failed to damage either destroyer and Sposobny claimed one hit on S-45. On their way home the three ships were spotted by German reconnaissance aircraft and were attacked by Stukas of III./StG 3. Kharkov was damaged by their first attack and had to be towed by Sposobny. The second attack damaged all three ships and Sposobny alternated towing Besposhchadny and Kharkov. The next attack sank both Kharkov and Besposhchadny with only 41 crewmen rescued from the latter. This incident prompted Stalin to issue an order forbidding the use of ships destroyer-sized and larger without his express permission. [12]
The six Leningrad-class destroyer leaders were built for the Soviet Navy in the late 1930s. They were inspired by the contre-torpilleurs built for the French Navy. They were ordered in two batches of three ships each; the first group was designated Project 1 and the second Project 38. These ships were the first large vessels designed and built by the Soviets after the October Revolution of 1917.
Kharkov was one of six Leningrad-class destroyer leaders built for the Soviet Navy during the 1930s, one of the three Project 1 variants. Completed in 1938, she was slightly damaged during the Raid on Constanța a few days after the German invasion of the Soviet Union on 22 June and covered the evacuation of the Danube Flotilla to Odessa the following month. During the Siege of Odessa and the Siege of Sevastopol in 1941–1942, the ship ferried reinforcements and supplies into those cities, evacuated wounded and refugees and bombarded Axis troop positions. Damaged by German aircraft a few weeks before the surrender of Sevastopol on 4 July, Kharkov was under repair until the beginning of August.
Gromky was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1938, the ship was initially assigned to the Baltic Fleet before being transferred to the Northern Fleet in mid-1939 where she played a minor role in the 1939–1940 Winter War against Finland.
Grozyashchy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Baltic Fleet and played a minor role in the Winter War of 1939–1940 against the Finns. After the start of the German invasion of the Soviet Union in June 1941, Grozyashchy participated in the Gulf of Riga Campaign and laid minefields in the Gulf of Finland. She was badly damaged by a mine in July and was under repair for over a month. The ship was crippled by German bombs in late September and did not become operational for almost a year. Grozyashchy provided naval gunfire support in 1944 for the Leningrad–Novgorod Offensive.
Gordy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1938, she was assigned to the Baltic Fleet. The ship was covering a minelaying operation after the start of the German invasion of the Soviet Union in June 1941 when she entered a German minefield. One of her sister ships had her bow blown off and Gordy rescued the survivors. The ship provided naval gunfire support for Soviet ground forces over the next several months, although she was badly damaged by a mine during the evacuation of Tallinn, Estonia, in August. After repairs, Gordy was assigned to evacuate Soviet troops from their enclave in Hanko, Finland, in November, but struck several mines en route and sank with heavy loss of life.
Steregushchy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Baltic Fleet. The ship played a minor role in the Winter War of 1939–1940 against the Finns. After the start of the German invasion of the Soviet Union in June 1941, Steregushchy participated in the Gulf of Riga Campaign. The ship briefly provided naval gunfire support during the Siege of Leningrad before she was sunk by German dive bombers on 21 September. Her wreck was refloated in 1944, although the repairs were not completed until 1948. Steregushchy was broken up for scrap in 1959.
Stremitelny was one of 29 Gnevny-class destroyer built for the Soviet Navy during the late 1930s. Completed in 1938, the ship was assigned to the Baltic Fleet and played a minor role in the 1939–1940 Winter War against Finland. Stremitelny was transferred to the Northern Fleet in mid-1940. After the start of the German invasion of the Soviet Union in June 1941, she covered an amphibious landing along the Arctic coast. The ship was attacked and sunk by German dive bombers the following month in Polyarny with the loss of 111 crew and passengers. Her wreck was partially salvaged the following year.
Smetlivy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1938, she was assigned to the Baltic Fleet and played a minor role in the 1939–1940 Winter War against Finland. After the start of the German invasion of the Soviet Union in June 1941, the ship participated in the Gulf of Riga Campaign before withdrawing to Tallinn, Estonia. Smetlivy supported Soviet forces during the defense of Tallinn in August and covered the subsequent evacuation to Leningrad. The ship provided naval gunfire support to the defenders of Leningrad over the next several months before she was assigned to evacuate Soviet troops from their enclave in Hanko, Finland, in November. Smetlivy struck several mines returning from Hanko and sank with heavy loss of life.
Sokrushitelny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was initially assigned to the Baltic Fleet before she was transferred to the Northern Fleet in late 1939. After the Axis invasion of the Soviet Union in June 1941, the ship laid several minefields in the White and Barents Seas. Sokrushitelny spent most of her service escorting the Arctic Convoys, run by the British to provide weapons and supplies to the Soviets, or providing naval gunfire support to Soviet troops along the Arctic coast. The ship engaged a German ship just once, while defending Convoy QP 13 in early 1942. While escorting Convoy QP 15 in November, she sank during a severe storm after breaking in half. Most of her crew was rescued by other destroyers sent to her aid, although 35 crewmen were lost.
Bodry was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1938, she was assigned to the Black Sea Fleet. After the German invasion of the Soviet Union in June 1941, the ship covered the evacuation of the Danube Flotilla to Odessa the following month. During the Siege of Odessa, Bodry transported troops and supplies while providing naval gunfire support to the defenders and then helped to evacuate them in October. During the Siege of Sevastopol, she performed the same sorts of missions and then participated in the Battle of the Kerch Peninsula at the end of 1941. The ship bombarded German troops in January 1942 before beginning repairs the following month. Bodry was badly damaged during a German air raid in July and was under repair until the end of 1944.
Bystry was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Black Sea Fleet. When the German invasion of the Soviet Union began in June 1941, the ship was under repair. Bystry struck a mine and sank in July. Her wreck was raised, but was too badly damaged for immediate repairs. She was later sunk by German bombs and her wreck had the bow salvaged to repair one of her sisters.
Boyky was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Black Sea Fleet. After the start of the German invasion of the Soviet Union in June 1941, the ship helped to lay minefields off Sevastopol. During the Siege of Odessa, Boyky transported troops and supplies while providing naval gunfire support to the defenders and then helped to evacuate them in October. During the Siege of Sevastopol, she performed the same sorts of missions and then participated in the Battle of the Kerch Peninsula at the end of 1941.
Bezuprechny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Black Sea Fleet. After the German invasion of the Soviet Union in June 1941, the ship laid minefields and participated in the Siege of Odessa, ferrying men and supplies to the beleaguered city and providing naval gunfire support. Bezuprechny was damaged by German aircraft in September and was under repair for most of the rest of the year. During the Siege of Sevastopol, the ship resumed her duties in late December, only with a different destination. She was sunk by German aircraft while transporting supplies and troops on 26 June 1942 with the loss of approximately 300 crewmen and 320 passengers.
Bditelny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Black Sea Fleet. After the German invasion of the Soviet Union began in 1941, the ship provided naval gunfire support during the Siege of Odessa. Frequently under repair due to running aground in 1941, Bditelny was unable to support the defenders of Sevastopol until early 1942 when she began to ferry supplies and troops there while also bombarding German positions outside the besieged city. She was sunk during a German airstrike in July when some of her torpedoes exploded. Her wreck was salvaged for scrap between 1948 and 1952.
Surovy was one of 18 Storozhevoy-class destroyers built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Surovy was completed in 1941 to the modified Project 7U design.
Smyshlyony was one of 18 Storozhevoy-class destroyer built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Smyshlyony was completed in 1940 to the modified Project 7U design.
Sposobny was one of 18 Storozhevoy-class destroyers built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Sposobny was completed in 1941 to the modified Project 7U design and assigned to the Black Sea Fleet.
Soobrazitelny was one of 18 Storozhevoy-class destroyers built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Soobrazitelny was completed in 1941 to the modified Project 7U design.
Sovershenny (Совершенный) was one of 18 Storozhevoy-class destroyer built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Sovershenny was completed in 1941 to the modified Project 7U design. The ship struck a mine while running her acceptance trials in September. While under repair in November, she was hit by two bombs that virtually wrecked her; the Soviets subsequently disarmed her. Repairs resumed in early 1942 until Sovershenny was sunk by an artillery shell in June. Her wreck was scrapped in late 1945.
Svobodny was one of 18 Storozhevoy-class destroyers built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Svobodny was completed in early 1942 to the modified Project 7U design.