Soviet destroyer Smetlivy (1937)

Last updated • 7 min readFrom Wikipedia, The Free Encyclopedia
Aerial view of Razumny A 22471.jpg
Aerial view of sister ship Razumny, March 1944
History
Naval Ensign of the Soviet Union 1935.svg Soviet Union
NameSmetlivy (Сметливый (Sly))
Ordered 2nd Five-Year Plan
Builder Shipyard No. 189 (Ordzhonikidze), Leningrad
Laid down17 September 1936
Launched16 July 1937
Completed6 November 1938
Commissioned29 November 1938
Stricken17 February 1956
FateSunk by mines, 4 November 1941
General characteristics (Gnevny as completed, 1938)
Class and type Gnevny-class destroyer
Displacement1,612  t (1,587 long tons) (standard)
Length112.8 m (370 ft 1 in) (o/a)
Beam10.2 m (33 ft 6 in)
Draft4.8 m (15 ft 9 in)
Installed power
Propulsion2 shafts; 2 geared steam turbines
Speed38 knots (70 km/h; 44 mph)
Range2,720  nmi (5,040 km; 3,130 mi) at 19 knots (35 km/h; 22 mph)
Complement197 (236 wartime)
Sensors and
processing systems
Mars hydrophone
Armament

Smetlivy (Russian : Сметливый, lit. 'Sly') was one of 29 Gnevny-class destroyers (officially known as Project 7) built for the Soviet Navy during the late 1930s. Completed in 1938, she was assigned to the Baltic Fleet and played a minor role in the 1939–1940 Winter War against Finland. After the start of the German invasion of the Soviet Union (Operation Barbarossa) in June 1941, the ship participated in the Gulf of Riga Campaign before withdrawing to Tallinn, Estonia. Smetlivy supported Soviet forces during the defense of Tallinn in August and covered the subsequent evacuation to Leningrad. The ship provided naval gunfire support to the defenders of Leningrad over the next several months before she was assigned to evacuate Soviet troops from their enclave in Hanko, Finland, in November. Smetlivy struck several mines returning from Hanko and sank with heavy loss of life.

Contents

Design and description

Having decided to build the large and expensive 40- knot (74 km/h; 46 mph) Leningrad-class destroyer leaders, the Soviet Navy sought Italian assistance in designing smaller and cheaper destroyers. They licensed the plans for the Folgore class and, in modifying it for their purposes, overloaded a design that was already somewhat marginally stable. [1]

The Gnevnys had an overall length of 112.8 meters (370 ft 1 in), a beam of 10.2 meters (33 ft 6 in), and a draft of 4.8 meters (15 ft 9 in) at deep load. The ships were significantly overweight, almost 200 metric tons (197 long tons ) heavier than designed, displacing 1,612 metric tons (1,587 long tons) at standard load and 2,039 metric tons (2,007 long tons) at deep load. Their crew numbered 197 officers and sailors in peacetime and 236 in wartime. [2] The ships had a pair of geared steam turbines, each driving one propeller, rated to produce 48,000 shaft horsepower (36,000  kW ) using steam from three water-tube boilers which was intended to give them a maximum speed of 37 knots (69 km/h; 43 mph). [3] The designers had been conservative in rating the turbines and many, but not all, of the ships handily exceeded their designed speed during their sea trials. Others fell considerably short of it, although specific figures for most individual ships have not survived. Variations in fuel oil capacity meant that the range of the Gnevnys varied between 1,670 to 3,145 nautical miles (3,093 to 5,825 km; 1,922 to 3,619 mi) at 19 knots (35 km/h; 22 mph). [4]

As built, the Gnevny-class ships mounted four 130-millimeter (5.1 in) B-13 guns in two pairs of superfiring single mounts fore and aft of the superstructure. Anti-aircraft defense was provided by a pair of 76.2-millimeter (3 in) 34-K AA guns in single mounts and a pair of 45-millimeter (1.8 in) 21-K AA guns [5] as well as two 12.7-millimeter (0.50 in) DK or DShK machine guns. They carried six 533 mm (21.0 in) torpedo tubes in two rotating triple mounts; each tube was provided with a reload. The ships could also carry a maximum of either 60 or 95 mines and 25 depth charges. They were fitted with a set of Mars hydrophones for anti-submarine work, although these were useless at speeds over 3 knots (5.6 km/h; 3.5 mph). [6] The ships were equipped with two K-1 paravanes intended to destroy mines and a pair of depth-charge throwers. [7]

Construction and service

Built in Leningrad's Shipyard No. 189 (Ordzhonike) as yard number 294, Smetlivy was laid down on 17 September 1936, launched on 16 July 1937, and was completed on 6 November 1938. [8] Assigned to the Baltic Fleet, she served on patrol and escort duty during the Winter War, [9] aside from bombarding the coastal artillery positions on the Finnish island of Russarö on 1 December 1939 with her sister ship Stremitelny and the light cruiser Kirov. [10]

When Operation Barbarossa, the German invasion of the Soviet Union, began on 22 June 1941, the destroyer was based in Ust-Dvinsk, Latvia, as part of the 1st Destroyer Division of the fleet's Light Forces Detachment. She participated in the defense of the Gulf of Riga, laying minefields in the Irben Straits during the nights of 24/25 and 26/27 June; she was damaged by two near misses by bombs on 25 June. The ship sailed to Kuivastu, Estonia, on the 27th and then helped to escort Kirov through the Moonsund archipelago to Tallinn, Estonia, three days later as the Soviets evacuated their forces from the Gulf of Riga. Smetlivy steamed to Leningrad for repairs on 15 July which were completed on the 27th. [11]

The ship bombarded German positions during the defense of Tallinn between 24 and 28 August, firing 456 shells from her main guns. [12] She covered the evacuation of Tallinn on 28–29 August as part of the detachment of main forces led by Kirov. [13] Together with the minelayer Marti, Smetlivy laid a minefield off Gogland Island on 10 September. She bombarded German positions on 3–5 October in support amphibious landings in the Peterhof area. On 14 October the destroyer was attached to the group of ships in the River Neva and moved to the Ust-Izhora area to provide gunfire support. Smetlivy supported a local counter-attack near Sinyavino between 20 and 25 October. During 1941 the ship fired a total of 700 shells from her 130 mm guns. [12]

On 4 November she was assigned to the second convoy helping to evacuate the garrison of Hanko to Kronstadt, [9] together with the destroyer Surovy. While loading 560 evacuees, [14] Smetlivy was struck by a Finnish artillery shell. [15] On the return voyage, a mine exploded in her paravanes at 23:10 and knocked out her engines. Twenty minutes later, another mine explosion detonated her forward magazine and blew off her bow all the way back to her bridge. At 23:50 she struck yet another mine that broke her in half, killing over half of her crew and passenger. The ship's stern section sank at 00:30 in the area of Naissaar at 59°41′N24°10′E / 59.683°N 24.167°E / 59.683; 24.167 . 80 crewmen and 274 evacuees were rescued by the minesweeper T-205 and several patrol boats. [16] Smetlivy was officially struck from the Navy List on 19 November. [9]

Citations

  1. Yakubov & Worth, pp. 99, 102–103
  2. Yakubov & Worth, p. 101
  3. Budzbon, p. 330
  4. Yakubov & Worth, pp. 101, 106–107
  5. Hill, p. 40
  6. Yakubov & Worth, pp. 101, 105–106
  7. Berezhnoy, p. 335
  8. Rohwer & Monakov, p. 233
  9. 1 2 3 Berezhnoy, pp. 332–333
  10. Rohwer, p. 10
  11. Platonov, p. 188; Rohwer, pp. 82, 84
  12. 1 2 Platonov, p. 188
  13. Rohwer, p. 95
  14. Yakubov & Worth, p. 108
  15. Rohwer, p. 112
  16. Platonov, pp. 188–189

Sources

Further reading

Related Research Articles

Soviet destroyer <i>Gremyashchy</i> (1937) Destroyer of the Soviet Navy

Gremyashchy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Baltic Fleet and was later transferred to the Northern Fleet in 1941.

Soviet destroyer <i>Grozyashchy</i> (1937) Destroyer of the Soviet Navy

Grozyashchy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Baltic Fleet and played a minor role in the Winter War of 1939–1940 against the Finns. After the start of the German invasion of the Soviet Union in June 1941, Grozyashchy participated in the Gulf of Riga Campaign and laid minefields in the Gulf of Finland. She was badly damaged by a mine in July and was under repair for over a month. The ship was crippled by German bombs in late September and did not become operational for almost a year. Grozyashchy provided naval gunfire support in 1944 for the Leningrad–Novgorod Offensive.

Soviet destroyer <i>Gordy</i> (1937) Soviet Navys Gnevny-class destroyer

Gordy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1938, she was assigned to the Baltic Fleet. The ship was covering a minelaying operation after the start of the German invasion of the Soviet Union in June 1941 when she entered a German minefield. One of her sister ships had her bow blown off and Gordy rescued the survivors. The ship provided naval gunfire support for Soviet ground forces over the next several months, although she was badly damaged by a mine during the evacuation of Tallinn, Estonia, in August. After repairs, Gordy was assigned to evacuate Soviet troops from their enclave in Hanko, Finland, in November, but struck several mines en route and sank with heavy loss of life.

Soviet destroyer <i>Steregushchy</i> (1938) Destroyer of the Soviet Navy

Steregushchy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Baltic Fleet. The ship played a minor role in the Winter War of 1939–1940 against the Finns. After the start of the German invasion of the Soviet Union in June 1941, Steregushchy participated in the Gulf of Riga Campaign. The ship briefly provided naval gunfire support during the Siege of Leningrad before she was sunk by German dive bombers on 21 September. Her wreck was refloated in 1944, although the repairs were not completed until 1948. Steregushchy was broken up for scrap in 1959.

Soviet destroyer <i>Stremitelny</i> (1937) Destroyer of the Soviet Navy

Stremitelny was one of 29 Gnevny-class destroyer built for the Soviet Navy during the late 1930s. Completed in 1938, the ship was assigned to the Baltic Fleet and played a minor role in the 1939–1940 Winter War against Finland. Stremitelny was transferred to the Northern Fleet in mid-1940. After the start of the German invasion of the Soviet Union in June 1941, she covered an amphibious landing along the Arctic coast. The ship was attacked and sunk by German dive bombers the following month in Polyarny with the loss of 111 crew and passengers. Her wreck was partially salvaged the following year.

Soviet destroyer <i>Bodry</i> (1936) Destroyer of the Soviet Navy

Bodry was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1938, she was assigned to the Black Sea Fleet. After the German invasion of the Soviet Union in June 1941, the ship covered the evacuation of the Danube Flotilla to Odessa the following month. During the Siege of Odessa, Bodry transported troops and supplies while providing naval gunfire support to the defenders and then helped to evacuate them in October. During the Siege of Sevastopol, she performed the same sorts of missions and then participated in the Battle of the Kerch Peninsula at the end of 1941. The ship bombarded German troops in January 1942 before beginning repairs the following month. Bodry was badly damaged during a German air raid in July and was under repair until the end of 1944.

Soviet destroyer <i>Bystry</i> (1936) Destroyer of the Soviet Navy

Bystry was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Black Sea Fleet. When the German invasion of the Soviet Union began in June 1941, the ship was under repair. Bystry struck a mine and sank in July. Her wreck was raised, but was too badly damaged for immediate repairs. She was later sunk by German bombs and her wreck had the bow salvaged to repair one of her sisters.

Soviet destroyer <i>Boyky</i> (1936) Destroyer of the Soviet Navy

Boyky was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Black Sea Fleet. After the start of the German invasion of the Soviet Union in June 1941, the ship helped to lay minefields off Sevastopol. During the Siege of Odessa, Boyky transported troops and supplies while providing naval gunfire support to the defenders and then helped to evacuate them in October. During the Siege of Sevastopol, she performed the same sorts of missions and then participated in the Battle of the Kerch Peninsula at the end of 1941.

Soviet destroyer <i>Bditelny</i> (1937) Destroyer of the Soviet Navy

Bditelny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Black Sea Fleet. After the German invasion of the Soviet Union began in 1941, the ship provided naval gunfire support during the Siege of Odessa. Frequently under repair due to running aground in 1941, Bditelny was unable to support the defenders of Sevastopol until early 1942 when she began to ferry supplies and troops there while also bombarding German positions outside the besieged city. She was sunk during a German airstrike in July when some of her torpedoes exploded. Her wreck was salvaged for scrap between 1948 and 1952.

Soviet destroyer <i>Ryany</i> (1937) Destroyer of the Soviet Navy

Ryany was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Pacific Fleet.

Soviet destroyer <i>Rekordny</i> (1939) Gnevny-class destroyer of the Soviet Navy later transferred to the Peoples Liberation Army Navy

Rekordny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1941, she was assigned to the Pacific Fleet.

Soviet destroyer <i>Revnostny</i> (1941) Destroyer of the Soviet Navy

Revnostny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1941, she was assigned to the Pacific Fleet.

Smely was one of 18 Storozhevoy-class destroyers built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Smely was completed in 1941 to the modified Project 7U design.

Skory was one of 18 Storozhevoy-class destroyers built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Skory was completed in 1941 to the modified Project 7U design.

Stoyky was one of 18 Storozhevoy-class destroyer built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Stoyky was completed in 1940 to the modified Project 7U design.

Svirepy was one of 18 Storozhevoy-class destroyers built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Svirepy was completed in 1941 to the modified Project 7U design.

Statny was one of 18 Storozhevoy-class destroyers built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Statny was completed in 1941 to the modified Project 7U design.

Surovy was one of 18 Storozhevoy-class destroyers built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Surovy was completed in 1941 to the modified Project 7U design.

Slavny was one of 18 Storozhevoy-class destroyers built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Slavny was completed in 1941 to the modified Project 7U design.

Sovershenny (Совершенный) was one of 18 Storozhevoy-class destroyer built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Sovershenny was completed in 1941 to the modified Project 7U design. The ship struck a mine while running her acceptance trials in September. While under repair in November, she was hit by two bombs that virtually wrecked her; the Soviets subsequently disarmed her. Repairs resumed in early 1942 until Sovershenny was sunk by an artillery shell in June. Her wreck was scrapped in late 1945.