Suicide bidding is a response to a tendering exercise in which a potential supplier, anxious to win business, submits a proposal to carry out the work for less than it will cost. These procurement processes are typically modelled as reverse sealed-bid auctions with the lowest bid winning. [1]

The motive for such bidding is to keep the company's skilled labour employed, even if the project only breaks even or makes a loss. [2]

This can result in poor quality work, poor service and debates over loopholes in contract wording in attempts to charge clients extra, [3] or even insolvency on the part of the contractor. [4]

The practice has particularly been noted in construction bidding. Around 2010, suicide bidding was widespread due to the economic crisis and strong competition. [5] 2010 survey by the Chartered Institute of Building found that 82% of respondents believed that “suicide bidding” existed within the industry. [2] It was considered to have contributed to the financial collapse of British firms Connaught plc and Rok plc in 2010. [3]

The Civil Engineering Contractors Association acknowledged that the practice had become "rife" in the desperate competition for work during the late-2000s recession, but blamed the public sector procurement process for focussing on the lowest price rather than best value. [4]

Some commissioning bodies, such as Crossrail, openly discourage the practice. [6] In 2011, some housing associations began including specific terms in tenders to protect them from legal challenge in the event of refusing to award the contract according to the lowest tender. [3]

See also

Related Research Articles

Construction Process of the building or assembling of a building or infrastructure

Construction is a general term meaning the art and science to form objects, systems, or organizations, and comes from Latin constructio and Old French construction. To construct is the verb: the act of building, and the noun is construction: how something is built, the nature of its structure.

Procurement is the process of finding and agreeing to terms, and acquiring goods, services, or works from an external source, often via a tendering or competitive bidding process.

Design–build is a project delivery system used in the construction industry. It is a method to deliver a project in which the design and construction services are contracted by a single entity known as the design–builder or design–build contractor. It can be subdivided into architect-led design–build and contractor-led design–build.

Design–bid–build, also known as Design–tendertraditional method or hardbid, is a project delivery method in which the agency or owner contracts with separate entities for the design and construction of a project.

Construction management (CM) is a professional service that uses specialized, project management techniques to oversee the planning, design, and construction of a project, from its beginning to its end. The purpose of Construction management is to control a project's time / delivery, cost and quality—sometimes referred to as a project management triangle or "triple constraints." CM is compatible with all project delivery systems, including design-bid-build, design-build, CM At-Risk and Public Private Partnerships. Professional construction managers may be reserved for lengthy, large-scale, high budget undertakings, called capital projects.

Bid rigging

Bid rigging is a fraudulent scheme in procurement auctions resulting in non-competitive bids and can be performed by corrupt officials, by firms in an orchestrated act of collusion, or between officials and firms. This form of collusion is illegal in most countries. It is a form of price fixing and market allocation, often practiced where contracts are determined by a call for bids, for example in the case of government construction contracts. The typical objective of bid rigging is to enable the "winning" party to obtain contracts at uncompetitive prices. The other parties are compensated in various ways, for example, by cash payments, or by being designated to be the "winning" bidder on other contracts, or by an arrangement where some parts of the successful bidder's contract will be subcontracted to them. In this way, they "share the spoils" among themselves. Bid rigging almost always results in economic harm to the agency which is seeking the bids, and to the public, who ultimately bear the costs as taxpayers or consumers.

Balfour Beatty plc is a British multinational infrastructure group based in the United Kingdom with capabilities in construction services, support services and infrastructure investments. A constituent of the FTSE 250 Index, Balfour Beatty works across the United Kingdom, Ireland, the United States, Canada and South East Asia.

Costain Group

Costain Group plc is a British technology based construction and engineering company headquartered in Maidenhead, England. Founded in 1865, its history includes extensive housebuilding and mining activities, but it later focused on civil engineering and commercial construction projects. It was part of the British/French consortium which constructed the Channel Tunnel at the end of the 1980s, and has been involved in Private Finance Initiative projects.

<i>R v Ron Engineering and Construction (Eastern) Ltd</i>

R v Ron Engineering and Construction (Eastern) Ltd, of 1981 is the leading Supreme Court of Canada decision on the law of tendering for contracts. The case concerned the issue of whether the acceptance of a call for tenders for a construction job could constitute a binding contract. The Court held that indeed in many cases the submission of an offer in response to a call for tenders constitutes a contract separate from the eventual contract for the construction. With the release of the decision, the tendering process practiced in Canada was fundamentally changed.

Government procurement Purchases made by the government

Government procurement or public procurement is the procurement of goods, services and works on behalf of a public authority, such as a government agency. Amounting to 12 percent of global GDP in 2018, government procurement accounts for a substantial part of the global economy.

Bidding

Bidding is an offer to set a price tag by an individual or business for a product or service or a demand that something be done. Bidding is used to determine the cost or value of something.

Construction bidding is the process of submitting a proposal (tender) to undertake, or manage the undertaking of a construction project. The process starts with a cost estimate from blueprints and material take offs.

Construction law is a branch of law that deals with matters relating to building construction, engineering, and related fields. It is in essence an amalgam of contract law, commercial law, planning law, employment law and tort. Construction law covers a wide range of legal issues including contract, negligence, bonds and bonding, guarantees and sureties, liens and other security interests, tendering, construction claims, and related consultancy contracts. Construction law affects many participants in the construction industry, including financial institutions, surveyors, quantity surveyors, architects, builders, engineers, construction workers, and planners.

The New Engineering Contract (NEC), or NEC Engineering and Construction Contract, is a formalised system created by the UK Institution of Civil Engineers that guides the drafting of documents on civil engineering and construction projects for the purpose of obtaining tenders, awarding and administering contracts. As such they legally define the responsibilities and duties of Employers and Contractors in the Works Information. The contract consists of two key parts the Contract Data part one and Contract Data part two. Several approaches are included making it a family of options. It is used in the UK and internationally in countries including New Zealand, Australia, Hong Kong and South Africa.

Fast-track building construction is construction industry jargon for a project delivery strategy to start construction before the design is complete. The purpose is to shorten the time to completion.

Reverse auction

A reverse auction is a type of auction in which the traditional roles of buyer and seller are reversed. Thus, there is one buyer and many potential sellers. In an ordinary auction also known as a forward auction, buyers compete to obtain goods or services by offering increasingly higher prices. In contrast, in a reverse auction, the sellers compete to obtain business from the buyer and prices will typically decrease as the sellers underbid each other.

British Rail Class 345

The British Rail Class 345 Aventra is a type of electric multiple unit passenger train built by Bombardier Transportation for use on London's Crossrail network. 70 nine-car trains have been manufactured at a cost of over £1 billion, with each train able to carry 1,500 passengers. The contract was awarded to Bombardier in February 2014 and the first train entered service on 22 June 2017.

Invitation to tender Business process

An invitation to tender is a formal, structured procedure for generating competing offers from different potential suppliers or contractors looking to obtain an award of business activity in works, supply, or service contracts, often from companies who have been previously assessed for suitability by means of a supplier questionnaire (SQ) or pre-qualification questionnaire (PQQ).

Best value procurement (BVP) is a procurement system that looks at factors other than only price, such as quality and expertise, when selecting vendors or contractors.

Early contractor involvement (ECI) is a type of construction contract where the principal contractor is engaged at an early stage in a project to offer input into the design phase. It is in contrast to the design–bid–build model where the contractor is only brought onboard at the end of the design phase. The model allows the contractor to have an input in the design of the scheme and suggest value engineering changes. Studies have shown that savings of around 10% in construction phase time and 7% in cost are achievable through the use of ECI. The ECI model has become increasingly popular in the United Kingdom since the early 2000s and is also used in Australia and New Zealand.

References

  1. Biruk, S.; Jaśkowski, P.; Czarnigowska, A. (2017). "Modelling contractor's bidding decision". Engineering Management in Production and Services. Vol. 9 (1). doi:10.1515/jem-2017-0007. ISSN   2543-6597 . Retrieved 21 May 2021.|volume= has extra text (help)
  2. 1 2 Procurement in the Construction Industry. Chartered Institute of Building. December 2010. p. 3, 12.
  3. 1 2 3 Brown, Carl. "Landlords crack down on 'suicide-bidding'". Inside Housing. Retrieved 2011-05-31.CS1 maint: discouraged parameter (link)
  4. 1 2 Prior, Grant (28 April 2011). "Government urged to stamp out suicide bidding". Construction Enquirer. Retrieved 31 May 2011.CS1 maint: discouraged parameter (link)
  5. MANGANELLI, BENEDETTO; MORANO, PIERLUIGI; TAJANI, FRANCESCO (2016). "An empirical analysis of winning bids in public procurement in the Italian construction sector" (PDF). Trans. Bus. Econ. 13: 129–137. Retrieved 16 May 2021.
  6. Lane, Michael (19 November 2009). "Crossrail discourages suicide bidding". Construction News. Retrieved 2011-05-31.CS1 maint: discouraged parameter (link)