Kyiv Trolleybus | |||
---|---|---|---|
Overview | |||
Native name | Київський Тролейбус | ||
Owner | Kyivpastrans, Kyiv City Council | ||
Area served | Darnytsia Raion, Desna Raion, Dnipro Raion, Holosiiv Raion, Obolon Raion, Pechersk Raion, Podil Raion, Shevchenko Raion, Solomianka Raion, Sviatoshyn Raion | ||
Locale | Kyiv | ||
Number of lines | 48 | ||
Annual ridership | 164,325,700 (2016) [1] | ||
Website | kpt | ||
Operation | |||
Began operation | November 5, 1935 | ||
Number of vehicles | 629 | ||
Technical | |||
System length | 496 kilometres (308 mi) (2019) [2] | ||
|
The Kyiv Trolleybus is a trolleybus network in Kyiv, the largest trolleybus network in the world in terms of line length, and the largest in Ukraine in terms of length and number of cars. The network was opened on November 5, 1935.
In June 1914, a London firm proposed to Kyiv Mayor I. M. Dyakov to build a "railless" tram (of course, this was a trolleybus). It was said that the construction of a trolleybus will cost 5 times cheaper (although funds for road repairs and asphalt were not taken into account). But due to lack of experience with such lines and the war, the talk of a trolleybus in Kyiv began only in 1935, after the transfer of the capital of the Ukrainian SSR from Kharkiv. According to the first project, the trolleybus was to follow the route of the former tram No 2, via III International Square – Khreshchatyk – Lenina Street – Pirohova Street – Tarasa Shevchenka Boulevard – Cominterna Street – Railway Terminal. Then a delegation was sent to Moscow. The issue with the supply of rolling stock was resolved; Moscow agreed to send the carcass of the trolleybuses, and Kyiv had to assemble them at the Dombalya Plant (now KZET). Routes were to open on the anniversary of the October Revolution, but numerous changes to the project caused delays.
The first trolleybus line in Kyiv and Ukraine (the second in the USSR) was opened on November 5, 1935, at 5:00 pm. The one-way fare was 25 kopecks. 4 LK-5 trolleybuses were on the route: Dombalya Plant – Krasnoarmeyska Street – Lva Tolstoho Square – Krasnoarmeyska Street – Dombal Plant. At the same time, a trolleybus depot for 100 vehicles was located on the territory of the plant, which served as one of the final ones. At the end of 1935, it was promised to open the second stage of the trolleybus system. From Lva Tolstoho Square, the trolleybus was to be extended along Khreshchatyk, Lenina Street, Pirohivska Street, Shevchenko Boulevard, and Cominterna Street to the railway station. It is true that they did not meet the deadline, but on June 2, 1936, from 19:00, citizens already had the opportunity to take a trolleybus to the railway station.
At the beginning of 1937, the first trolleybuses manufactured by YAZ (Yaroslavl Automobile Plant) arrived in Kyiv. They were named YATB-1. This allowed to increase the production on the already existing route and to provide rolling stock on the lines that were to open this year. However, due to the fact that trolleybuses were made quickly, factory defects had to be eliminated already in Kyiv. For the first time, every second trolleybus broke down on the route every day. Subsequently, trolleybuses of the YATB-2 type began to arrive. They were of better quality, so a certain problem with the rolling stock was resolved, given the following changes in traffic.
On October 5, 1937, the third stage was completed. It ran from the Bessarabka to the III International Square, thus the trolleybus completely covered Khreschatyk and tram lines closed in 1934. Due to this branching of lines, trolleybuses could no longer run on a single line, so they were divided into routes:
Already at the beginning of 1939, the capital of the Ukrainian SSR received the newest trolleybuses at that time – YATB-4. They differed from their predecessors in power. There were enough new trolleybuses in the city, which allowed to transfer LK-5 to the official balance.
Due to the high intensity of the area from III International Square to Lva Tolstoho Square, on September 18, 1940, an additional route was introduced, No 4: Lva Tolstoho Square – Khreshchatyk – III International Square. There were 4 trolleybuses on the line. It was planned to extend the network from Khreshchatyk to Podil (Volodymyrsky Descent) and to Pechersk (Kirova Street). But the trolleybuses at the time could not cope with such steep slopes, so the projects were rejected.
Thus, as of January 1, 1941, the route network looked like this:
For a long time, after the invasion of German troops in the USSR, the trolleybus system did not stop working. But after Soviet troops withdrew from Kyiv on September 18, 1941, they de-energized the city by blowing up power plants. Some eyewitnesses say trolleybuses stopped in the middle of the streets, where they were forced to do so by a power outage. After most of Khreshchatyk was blown up, the trolleybus could be rebuilt only if the catenary was restored. When the occupiers realized that they would have to leave Kyiv, they dismantled all the remains of the contact wire and took the 18 best YTB-4 trolleybuses to Poznań, Gdynia and Königsburg (6 cars to each city). However, the workers were able to "disguise" several trolleybuses YATB-1 and YATB-2, thus "saving" them from export.
Immediately after the liberation of Kyiv from the occupiers, the task was set to resume tram traffic, so on January 1, 1944, the tram of route No 13 resumed operation. However, due to lack of electricity between January 1 and February 20, 1944, there were 1,422 power outages. Nevertheless, trolleybus restoration works were carried out in parallel with trams. 12 Almaty YATB-4As were mentioned and due to the long-term restoration of the network, 8 trolleybuses were ordered to be transferred to Donetsk and 4 to Kharkiv. However, as it turned out, only 6 trolleybuses were sent, all to Kharkiv. At the end of 1943, a special commission inspected the surviving trolleybuses and concluded that 10 of the 29 mobile units (4 of the 14 YATB-1s and all 6 YATB-2s) could be restored. In May 1944, the Tram trust prepared a comprehensive program for the restoration of electric vehicles from 1944 to 1947.
In 1944, route Lva Tolstoho Square – Dzerzhinsky Plant opened with 5 rolling stock cars. In 1945, 5 more cars were added and route Lva Tolstoho Square – Bessarabka – Tarasa Shevchenka Boulevard – Cominterna Street – Railway Station were opened. In 1946, 20 new cars were to arrive in Kyiv, and the line along Tarasa Shevchenka Boulevard was to be extended by the Brest-Litovsk highway to the Park of Culture and Recreation of the Bilshovik Plant. Only in 1947 was it planned to restore the section along Khreshchatyk and extend the line of the Brest-Litovsk highway to Verstatobud. Another 30 new trolleybuses were to run on these lines.
On June 30, 1944, the Tram trust was renamed the Kyiv Tram and Trolleybus Department (KTTU). Already on November 2, 1944, a test drive was conducted on the route Tolstoy Square – Dzerzhinsky Plant. The route was opened by 4 YATB trolleybuses, which after the LK-5 was written off were renumbered from 1. The fare was 1 rouble, and luggage transportation was prohibited. In winter, electric vehicles again lacked electricity. Production was limited to 3 cars. According to the order of the City Council of April 1, 1945, the trolleybus route was divided into sections, so passengers traveling shorter distances paid 50 kopecks instead of 1 rouble.
In connection with the "arrangement of travel on Velyka Zhytomyrska, Lvivska, Dorohozhytska, and Osiivska Streets and the removal of tram tracks from them, in 1946 it was planned to open trolleybus traffic on the above streets. But due to the catastrophic lack of rolling stock, the Dzerzhinsky Plant organized the production of trolleybus carcasses. Between 1946 and 1947, 80 new trolleybuses were to arrive in Kyiv. 15 new cars were enough to open a new line. But due to the lack of funds, Kyiv residents did not see any trolleybuses or a new route that year.
As of the end of 1947, the route network was to look like this:
All these plans were implemented, but in a slightly different order and with less output on the routes.
In April 1947, the first 5 MTB-82M vehicles arrived in Kyiv. They received No 1, 2, 3, 5, 6. The car No 1 was completely ready for operation, so on April 29, 1947, the driver S. Syuskin drove it on the 2nd route. During this year, the city received another 27 trolleybuses of this type. Due to such an unexpected replenishment, Kyiv in October 1947 transferred 4 MAN trolleybuses to Dnipropetrovsk free of charge to open a route network there.
The replenishment of rolling stock allowed a route to be opened September 25, 1947, in the busiest area in the city at that time: Stalin Square – Lva Tolstoho Square. This line received the 3rd number. 3 trolleybuses were produced on the route and it was sent for unloading "two", which, in turn, produced at least 10 cars. Also, the replenishment of the trolleybus fleet forced the Dzerzhinsky Plant to cede the territory of the factory warehouse, in favor of the trolleybus depot.
In 1947, the reconstruction of the city center was in full swing, and reconstruction and changes in trolleybus traffic did not go unnoticed. The trolleybus route to the Dzerzhinsky Plant was temporarily suspended and route No 1 was closed. And if the repair works on Khreshchatyk were completed, the issue on Krasnoarmeyska Street remained open. Even before the war it was planned to move the tram tracks on the Horkoho Street. This meant that the trolleybus was equipped with all the growing and busiest passenger traffic in the city at that time, which required coordinated and clear operation of the cars on the route. And given the fact that the Horkoho Street is not so wide and spacious, the quality of transportation would deteriorate significantly. But the line to Horkoho Street was completed only to the Dymytrova Street. This meant that almost all passenger traffic fell on the soon-to-be-restored trolleybus route No 1.
Routes as of January 1, 1948:
On September 5, 1948, routes No 1 and 3 merged into a single routes No 1, running from Stalin Square to the Dzerzhinsky Plant. Subsequently, route No 3 was renewed from time to time when it was needed, although it worked only during rush hour.
As of January 1, 1950, the route network took the following form:
On November 5, 1950, after the restoration of the Stalinskyi Viaduct, the trolleybuses of route No 1 followed the extended route to the Frunze Club. And on December 31, 1950, after the completion of the construction of the line by the Avtostrada to Navodnytskyi Bridge, traffic was opened on the trolleybus route No 11: Frunze Club – Navodnytskyi Bridge (Dnieper Embankment). Four trolleybuses came to the line. On the same day, the total length of the trolleybus network reached 41.4 km (25.7 mi). Also shortly before that, the depot was replenished with 51 trolleybuses.
Due to the tension of streets in the city centre, one-way traffic was introduced on some routes:
Also, route No 9 was shortened to Khreshchatyk and unfolded in the quarter of Leontovicha Street – Lenina Street – Khreshchatyk – Tarasa Shevchenka Boulevard.
Areas with new buildings were quickly settled, so it was necessary to connect them with the city center. The first such step in the trolleybus economy was the opening on January 1, 1952, of the trolleybus route No 8: Stalin Square – Fishcombinate. The line was served by 6 trolleybuses.The weak point of the route was a wooden bridge across the Lybid River, because there was no full-fledged Air Fleet overpass at that time. And a little more than six months later, on July 15, the line was extended from the Fishcombinate to the Airport, which allowed to open route No 9: Stalin Square – Airport. 7 trolleybuses were released on the route; on the same day on route No 8 were also produced 7 mobile units.
Until the spring of 1954, the construction of the line to the Agricultural Exhibition continued. On May 23 route No 11 was opened: Stalin Square – Orikhuvatska Square. The route included 11 trolleybuses. The construction of the new line was completed on April 22, 1955, at the same time route No 12 was opened: Stalin Square – Agricultural Exhibition. At the same time, the output was 11 cars – at the expense of No 1 (2 trolleybuses), at the expense of No 11 (3 trolleybuses) and at the expense of the reserve (6 trolleybuses). These routes were to take residents to the newly opened exhibition. The trolleybus was to be assisted by a tram line, the project of which was frozen due to the planned launch of the metro (which was opened only in 2011).
As of January 1, 1956, the route network in the city looked like this:
The 1960s were the "golden age" of trolleybuses in the USSR, and Kyiv was no exception. If in 1947 there were only 3 routes, in 1970 there were 24. Accordingly, the number of trolleybuses increased to 737. Kyiv began to produce its own trolleybuses under the same name "Kyiv"; but there were only a few models. On June 12, 1966 [3] trial operation began [4] on route No 6 of the world's first [5] trolleybus train No 205/84 [6] by Kyiv inventor Volodymyr Veklych, [7] [8] consisting of two MTB-82D trolleybuses.
Later (in the 1970s) the development of the trolleybus network slowed down a bit – in fact, only 4 lines were built – on Chubarya Avenue (now Vidradnyi Avenue), in the residential areas of Vynohradar and Teremky-2 and branches on Syretska Street. The last domestic MTB-82 trolleybuses were written off in 1974, and since then until 1991 the trolleybus fleet in Kyiv consisted exclusively of foreign-made trolleybuses – Czechoslovak Škoda 9Tr, Škoda 14Tr and Škoda 15Tr, and, since the late 1980s – Romanian DAC E217.
In the late 1980s, the length of the trolleybus network was about 280 km (170 mi), there were 30 trolleybus routes, the fleet of trolleybuses was about 1220 trolleybuses – this was a kind of peak of development. New Czechoslovak and Romanian articulated Škoda 15Tr and DAC E217 trolleybuses appeared.
In the early 1990s, the first signs of a crisis appeared: trolleybus routes were reduced (eventually, by the early 2000s, almost all trolleybus lines in the central part of the city were liquidated), and old trolleybuses were written off en masse in the absence of new arrivals. Production of Kyiv's own trolleybuses began: Kyiv-11 and Kyiv-11u, which later "turned" into the more massive UMZ-T1 and UMZ-T2, already produced in Dnipropetrovsk.
The number of trolleybuses was rapidly declining and in 10 years – in the early 2000s, was about 500 – less than half of the previous number. However, at this time, along with the closure of lines in the central part of the city, the rapid development of the trolleybus network continued on the outskirts – from the mid-1990s to 2005, lines were built on the Obolon district (in 1995), as a replacement for closed tram lines trolleybus lines to Solomyanka through Saksahanskoho and Uritskoho Streets (now Mitropolitan Vasyla Lypkivskoho; this was the No 3 in 2001) were launched instead of the tram by the Paton Bridge to Darnytska Square, as well as lines across Protasiv Yar Street (this was route No 40 in 2004), to the Teremky-1 and Lisovyi districts in Mykilska Borshchahivka, on Akademika Zabolotnoho Street, and the (near Borshchahivka), along Kutuzov Street (now General Almazov Street) and Moskovska Street, along Chervonozoryanyi Avenue (now Valery Lobanovskyi Avenue), and the number of lines on the Obolon, Vynohradyshchyna and Vyhiv districts had expanded. However, in the conditions of insufficient number of trolleybuses, all these measures only led to the strain of the existing lines (rolling stock for new routes was simply removed from the existing ones).
In 2006 the ElectroLAZ-12 trolleybus was presented. In total, Kyiv purchased 53 such trolleybuses. And a little later – in 2007, its extended version – ElectroLAZ-20. From 2007 to 2012, the trolleybus network of the capital received about 130 trolleybuses of this brand. There were also 4 Bohdan-E231 trolleybuses in operation at the Kurenivskyi Trolleybus Depot.
Before the European Football Championship of 2012, the Bohdan Motors bus plant agreed with the city authorities for the supply of Bohdan T701.10 and Bohdan T901.10 trolleybuses. From 2011 to 2014, 93 single Bohdan T701.10 trolleybuses and 50 articulated Bohdan T901.10 trolleybuses started operating in Kyiv.
In April 2014, route No 6 was extended along the extended route (Independence Square – Diahnoticheskyi Center), and on August 23 of the same year, 3 routes were opened at once: No 9 (TRED No 3, Kyiv Airport – Lva Tolstoho Square) ; No 15 (TRED No 1, Vydubychi metro station – Palace of Sports metro station); No 33 (TRED No 2, Pivdennyi Railway Station – Diahnotycheskyi Center (Minsk District)).
On December 20, 2016. route No 46 was closed. Simultaneously extensions for routes were added:
Since the beginning of January 2017, night routes were opened:
On December 4, 2017, the route No 19D "Kadetskyi Hai Street – Yuriya Illenka Street (Motorcycle Plant)" was opened to study the demand of residents of Solomyanskyi and Shevchenkivskyi districts in passenger transportation. [9]
On February 6, 2018, route No 1 was reduced to Lybidska metro station, and route No 12 was extended from Yuriya Smolycha Street to Vasylkivska metro station. [10]
On February 22, 2018, route No 7 was extended to Lva Tolstoho Square along the route "Chornobylska Street – Lva Tolstoho Square". [11]
On August 18, 2018, the route No 9 was reoriented from Lva Tolstoho Square to Palace of Sports metro station through the South Kyiv Passenger Railway Terminal. [12]
On August 22, 2018, changes were made to routes No 16, 23, 91N and 92N. Namely: [13] [14]
In addition, on August 22, 2018, a new night route was introduced: [15] No 94 "Lva Tolstoho Square – Lesya Kurbasa Avenue".
During 2005–2008, some improvements took place – in addition to the appearance of a number of new lines from Darnytska Square to the Vyhurivshchyna-Troyeshchyna district – trolleybus depot No 1 was moved to the Teremky-2 district area and a number of routes in the city center were relocated due to traffic reorganization. The purchase of fully low-floor trolleybuses of domestic production from Lviv and Lutsk and from Makarova plants was started. Most trolleybuses of Lviv production – both articulated and single – were purchased together, together with more than 150 new vehicles. Along with the write-off of old trolleybuses, there was a small increase in the trolleybus fleet.
As of August 2014, the fleet of Kyiv trolleybuses had 533 rolling stock, 44 routes, and the length of the lines is about 500 km (310 mi). As of 2020, there are 629 vehicles and 48 lines.
The possibility of building a new line on Staronavodnytska Street and Klovskyi Descent is being considered. There are also projects to restore the trolleybus line that connected the railway terminal and Sophia Square.
The GenPlan of Kyiv envisages the construction of lines by the Dnipro riverside and Rusanivska riverside, and on Haharina Avenue, Bratislava Street, and Koroleva Avenue.
On November 2, 2016, the Kyiv City State Administration decided to build a trolleybus line from Troieshchyna to Sevastopol Square and reconstruct a trolleybus line from Romana Shukhevycha Avenue to Darnytsia station with a separate bus and trolleybus line. [16]
It is also planned to further upgrade the rolling stock with as much replacement as possible to low-floor trolleybuses.
In the first decades of the trolleybus's existence in the city, the fare was differentiated depending on the distance. In the 1960s, a single fare was introduced; later in the 1960s, conductors were finally abandoned and special ticket offices were introduced, and following that composters were installed.
In the 1970s and 1980s, the fare was 4 kopecks, but was then increased to 15 kopecks, then to 30 kopecks.
From 2000 to November 4, 2008, the fare was 50 kopecks. After that, the fare was 1 hryvnia 50 kopecks. From February 7, 2015, the one-time fare was 3 ₴, from July 15, 2017, it was 4 ₴, and from July 14, 2018, the cost is 8 ₴.
Tickets can be purchased at specialized kiosks at bus stops, as well as kiosks with a press located near the stops, as well as from the conductor (although most trolleybuses during the day, as well as all early in the morning and late in the evening after 7–8 pm do not have a conductor on board). Tickets can also be purchased from the driver when the trolleybus is at a stop. The ticket must be composted immediately; without a composter mark the ticket is considered invalid. The fine for ticketless travel (uncomposed tickets) is 160 hryvnias. There is a project to introduce full trolleybus traffic at night, with fares after 10:00 p.m. and until 6:00 a.m. tripling, but for privileged categories of the population the fare will be normal and the interval should be the same on weekdays and weekends.
From July 14, 2021, the circulation of paper tickets in trolleybuses will be completely stopped, and fare payment will be made only by an electronic ticket. [17]
As of May 25, 2020, the following routes are in effect:
As of December 30, 2016, to provide passenger transport services at night from 11 p.m. to 6 a.m. three night trolleybus routes were introduced. The routes are no longer in service due to the nighttime curfew imposed due to the Russian invasion of Ukraine.
Picture | Manufacturer | Model | Quantity | Since |
---|---|---|---|---|
LAZ | E183 E301 | 4 34 | 2006 2007 | |
Bogdan | T701 T901 | 118 142 | 2011 2012 |
Picture | Manufacturer | Model | Quantity | Years |
---|---|---|---|---|
PTMZ | LK-5 | 7 | 1935–1941 | |
YaMZ | YaTB-1 YaTB-2 YaTB-4 | 14 6 20 | 1937–1949 1937–1949 1939–1947 | |
MAN | 4 | 1945–1947 | ||
Trolza | MTB-82 | 280 | 1947–1974 | |
SVARZ | TBES | 21 | 1957–1969 | |
Škoda | 8Tr | 22 | 1960–1972 | |
KZET | KTB-1 | 83 | 1960–1969 | |
Škoda | 9Tr | 1220 | 1962–1996 | |
KZET | Kyiv-2 | 15 | 1964–1969 | |
KZET | Kyiv-4 | 11 | 1965–1969 | |
Trolza | 5 | 60 | 1965–1970 | |
KZET | Kyiv-6 | 2 | 1968–1974 | |
Škoda | 14Tr 15Tr | 358 46 | 1983–2013 1990–2013 | |
Rocar | DAC-217E | 261 | 1986–2007 | |
KZET YuMZ | Kyiv-11 Kyiv-11u T1 T2 | 3 17 54 76 | 1991–1994 1992–1996 1993–2010 1996–2018 | |
Antonov | Kyiv-12 Kyiv-12.01 Kyiv-12.03 Kyiv-12.04 | 1 1 90 1 | 1993–2003 1995–2013 1996–2022 1999–2017 | |
MAZ ETON | 103T T103 | 59 8 | 2003–2017 2008–2022 | |
YuMZ | E186 | 7 | 2006–2015 | |
Bogdan | E231 | 3 | 2007–2015 |
Routes in italic are served only partially by one or another depot.
The Kyiv Metro is a rapid transit system in Kyiv owned by the Kyiv City Council and operated by the city-owned company Kyivskyi Metropoliten. It was initially opened on November 6, 1960, as a single 5.24 km (3.26 mi) line with five stations. It was the first rapid transit system in Ukraine.
Khreshchatyk is the main street of Kyiv, the capital city of Ukraine. The street is 1.2 kilometres (0.75 mi) long, and runs in a northeast-southwest direction from European Square through the Maidan to Bessarabska Square and the Besarabsky Market. The offices of the Kyiv City Council, the Post Office, the Ministry of Agrarian Policy and Food, the State Committee of Television and Radio Broadcasting, the TsUM department store, and the Ukrainian House, are all located on Khreshchatyk.
The Lviv tramway network is an electric tram in Lviv, Ukraine. It is one of two tram system in Western Ukraine, and the largest among narrow-gauge tram systems in Ukraine.
The Kyiv Tram is a tram network that serves the Ukrainian capital Kyiv. The system was the first electric tramway in the former Russian Empire and the fourth one in Europe after the Berlin, Budapest, and Prague tramways. The Kyiv Tram system currently consists of 139.9 km (86.9 mi) of the track, including 14 km (8.7 mi) of two Rapid Tram lines, served by 21 routes with the use of 523 tram cars. However, the system is being neglected, the serviced track length is decreasing at a fast rate and is replaced by buses and trolleybuses.
The Kingston upon Hull tramway network was a network of 4 ft 8+1⁄2 instandard gauge tram lines following the five main roads radially out of the city centre of Kingston upon Hull, East Riding of Yorkshire, England. Two of these lines went west, and two east. The fifth went to the north, and branched to include extra lines serving suburban areas. Additionally a short line linked the city centre to the Corporation Pier where a ferry crossed the Humber Estuary to New Holland, Lincolnshire.
Ploshcha Ukrainskykh Heroiv is a station on Kyiv Metro's Obolonsko–Teremkivska Line. Until May 2023 it was named Ploshcha Lva Tolstoho. The station was opened on 19 December 1981, and was named after the writer Leo Tolstoy. Tolstoy had visited the city only once. The station was designed by N.A. Levchuk and V.B. Zhezheryn.
Halytska Square in Kyiv, the capital of Ukraine, is a large square in the city. The square is in Shevchenkivskyi District and located on Kyiv's main westward thoroughfare being its one of the main transportation hubs.
The Vinnytsia Tramway network is the part of the public transportation system that since 1913 serves Vinnytsia, the administrative center of the Vinnytsia Oblast, Ukraine. The tram system has a narrow rail gauge of 1,000 mm that only exists in Ukraine in the cities of Lviv, Zhytomyr and Yevpatoria, as well as Vinnytsia. The system currently consists of 21.2 km of tracks.
The Kharkiv tram is part of the public transport system of the second largest city of Ukraine. The tram system has a "Russian Standard" track gauge of 1,524 mm. The tram network is built almost exclusively on the streets of Kharkiv, making it a traditional tram system. The network consists almost exclusively of double track. In most parts the tracks are separated from other road traffic, whereas elsewhere tracks lie on lanes that cars and buses may also use.
Trams have been operating in Dalian continuously since 1909, making them one of the oldest tram systems still in use in mainland China. There were once eleven routes in operation in Dalian in Northeast China. Only two routes remain in use today. There was a route 203 which currently merged into route 201. Notably, most of the staff on Dalian's tram system are female, such as the driver, conductor, points man—even the depot manager. The tram system was the only rail network in the city, until Dalian Metro opened in 2003.
The Obolonsko–Teremkivska line, is the second line of the Kyiv Metro, first opened in 1976, it extended northwards along the right bank of the Dnieper river and began deviating from the river towards the southwest. As the current stations were built in the 1970s and 1980s, architecturally the line shows some of the best examples of late-Soviet architectural features. It is generally coloured blue on the maps.
The Bessarabska Square is a square located at the southwest end of Khreshchatyk, the main thoroughfare of Kyiv, the capital of Ukraine. It is located in the city's Shevchenkivskyi District (district), at the busy intersection of Khreshchatyk, Taras Shevchenko Boulevard, Velyka Vasylkivska Street, and the Krutyi Descent streets.
Kyiv, the capital of Ukraine, has an extensive and rapidly developing transportation infrastructure serving local public needs and facilitating external passenger and cargo traffic.
The Vyshhorodsko–Darnytska line is a proposed sixth line to the Kyiv Metro system serving the Ukrainian capital Kyiv. The line is proposed to begin near the Taras Shevchenko Square in the city's north, and is to run south, connecting to the system's four other lines. It will later run east, and will cross over the Dnipro River and ending at the Darnytsia Railway Station on the city's left bank.
Kyivpastrans is a municipal company that operates public transport in Kyiv, the capital of Ukraine. Its operations include electric trams, city buses and trolleybuses. It also operates the Kyiv Funicular and some urban rail lines.
The Metrohrad is an extensive underground shopping mall at Bessarabska Square, Kyiv, Ukraine.
Prospect Beresteiskyi, is the second longest public roadway (prospekt) in Kyiv, Ukraine. The roadway was created in the second half of the 20th century (1964) as part of the urbanized area of the Brest-Lytovske highway and was known as Brest-Lytovskyi prospect. At the beginning of the Soviet perestroika period in 1985, it was renamed to Prospect Peremohy. It gained its current name in February 2023.
The Lviv trolleybus is a trolleybus system in Lviv, Ukraine. The trolleybus network is operated by Lvivelectrotrans - a municipal enterprise, that is the operator of trams and trolleybuses in the city. LET is owned by the Lviv city council. The length of the contact network is 136 km (01.2023), and the length of the route network is 169 km (01.2021). As of 2021, 24,678,300 paid passengers used trams and trolleybuses. In 2021, trolleybuses performed 3.29 million kilometers of transportation work (vehicle-km). In January 2024, 900,744 passengers were transported by trolleybus routes.
The Zaporizhzhia Tram is a tram network in the city of Zaporizhzhia, Ukraine. The network comprises 7 routes spanning 157.9 km of which 99.345 km are in use. The tram began operating on July 17, 1932. Service on the system has been interrupted but continued operating through the Russian Invasion of Ukraine 2022. The system carried 100,500 daily riders as of 2020.
{{cite web}}
: CS1 maint: archived copy as title (link){{cite web}}
: CS1 maint: archived copy as title (link){{cite web}}
: CS1 maint: archived copy as title (link){{cite web}}
: CS1 maint: archived copy as title (link)