Yastreb-class guard ship

Last updated
Yastreb.jpg
Yastreb
Class overview
NameYastreb
OperatorsNaval Ensign of the Soviet Union (1950-1991).svg  Soviet Navy
Preceded by Uragan class
Succeeded by Kola class
SubclassesProject 29K
Built1939–1951
In service1944–1969
Planned20
Completed6
Cancelled5
Lost9
General characteristics (Project 29)
Type Guard ship
Displacement
  • 842 tonnes (829 long tons; 928 short tons) (standard)
  • 995 tonnes (979 long tons; 1,097 short tons) (full load)
Length85.7 m (281 ft 2 in)
Beam8.4 m (27 ft 7 in)
Draught2.6 m (8 ft 6 in)
Propulsion
Speed34 knots (39 mph; 63 km/h)
Endurance2,700 nmi (5,000 km) at 15 knots (28 km/h)
Complement112 men
Armament

The Yastreb-class guard ships were built for the Soviet Navy as small patrol and escort ships. Fifteen out of twenty planned ships were laid down before the start of Operation Barbarossa Only one was completed during World War II. Five others were completed after the war, but five were scrapped on the stocks at Nikolayev when it was captured by the Germans in late 1941. Four were scrapped by the Soviets at Leningrad and five were cancelled before they were laid down. The postwar ships were completed to a modified design as Project 29K. One of these was transferred to the NKVD. The last of the ships was scrapped in 1975.

Contents

Design

The Yastreb-class guard ships were designed to replace the unsatisfactory Uragan-class guard ship that preceded them. The Uragans had proven to be too small for the weight of their armament, too slow and had poor seakeeping capabilities due to their excessive top-weight. Despite being almost twice the displacement of the older ships, the Yastreb were equipped with only one additional main gun. This was done to minimize the stability problems experienced by their predecessors.


General characteristics

The Project 29 ships were longer than their predecessors at 85.7 m (281 ft) overall. They had a beam of 8.4 m (28 ft) and, at full load, a draft of 2.6 m (8.5 ft). They were significantly heavier than the Uragan class; the Yastreb-class ships displaced 842 metric tons (829 long tons) at a standard load, and 995 metric tons (980 long tons) at full load, nearly twice the 457 metric tons (400 long tons) at standard load of the earlier ships. [1] The Project 29K ships had a deeper draft of 3.3 m (11 ft) at full load and they were slightly heavier than their half-sister; they displaced 905 metric tons (891 long tons) at a standard load, and 1,059 metric tons (1,040 long tons) at full load. Their crew increased to 127 men, an increase of 15 men over Yastreb. [2]

Armament

The intended main armament was three single 100 mm (3.9 in)B-34 guns, protected by gun shields. Some ships reportedly substituted the B-34 guns for three of the naval version 85 mm (3.3 in)52-K anti-aircraft guns. [3] Four 12.7 mm (0.50 in) AA machine guns were also carried. The underwater armament consisted of one triple 456 mm (18.0 in) torpedo tube mount, fitted between the funnels and up to 40 mines. [1]

Propulsion

Yastreb had 2 shaft geared steam turbines producing 23,000 shp (17,000 kW) that propelled her to 34 knots (39 mph; 63 km/h). Her endurance was 2,700 nmi (5,000 km) at 15 knots (28 km/h). [1] The Project 29K ships used the same machinery, but were half a knot slower and had only a range of 2,200 nmi (4,070 km) at 15 knots (28 km/h). [2]

Construction

The construction of all the Project 29 ships was interrupted by Operation Barbarossa in 1941. Those ships furthest along were suspended for the duration of the war, although Yastreb, as the lead ship of the class, was just over half-complete on 22 June 1941. It was finished at the end of 1944 after the Siege of Leningrad was broken in early 1944. Most of the others were scrapped or cancelled. [4] Eleven more ships were intended to be laid down in 1942 and another eight in 1943, but the war ended that plan. [5]

Five other ships had made significant progress before the Germans invaded and were completed to a revised design, Project 29K, after the war. These were slightly larger, added four single 37 mm (1.5 in)61-K AA guns, and a pair of depth charge throwers in lieu of the mines. [2]

The six ships that were to start construction at the Ordzhonikidze Shipyard in Sevastopol actually had their material prepared at Marti South in Nikolayev and shipped to Sevastopol for building. Similarly the three ships launched, but not completed by the end of the war at the Zhandov Shipyard in Leningrad, were towed to the former Schichau-Werke shipyard in Kaliningrad for completion. [4]

Ships

Project 29
ShipBuilderLaid downLaunchedCommissionedFate
Yastreb Zhdanov, Leningrad 23 May 193910 June 194030 December 1944scrapped 12 September 1959
Bditel'nyiZhdanov, Leningrad23 May 1940Never completed and scrapped
Tigr Ordzhonikidze, Sevastopol 1940scrapped on the stocks by the Germans
LeopardOrdzhonikidze, Sevastopol1940scrapped on the stocks by the Germans
Rys'Ordzhonikidze, Sevastopol1941scrapped on the stocks by the Germans
YaguarOrdzhonikidze, Sevastopol1941scrapped on the stocks by the Germans
KuguarOrdzhonikidze, Sevastopol1941scrapped on the stocks by the Germans
PanteraOrdzhonikidze, Sevastopol1941not laid down, cancelled
BerkutZhdanov, LeningradAugust 1940scrapped on the stocks
Sokol'Zhdanov, LeningradOctober 1940scrapped on the stocks
GrifZhdanov, LeningradMay 1941scrapped on the stocks
VoronZhdanov, LeningradCanceled 19 July 1941
KondorZhdanov, LeningradCanceled 19 July 1941
FregateShipyard 199, Komsomolsk-on-AmurCanceled
OrlanShipyard 199, Komsomolsk-on-AmurCanceled
Project 29K
OrelZhdanov, Leningrad28 May 193912 February 194121 December 1950scrapped 18 September 1969
KorshunZhdanov, Leningrad25 October 193928 May 194121 January 1951scrapped 31 January 1961
ZorkiiZhdanov, Leningrad23 May 194031 October 194030 January 1950scrapped 4 November 1975
BurevestnikShipyard 199, Komsomolsk-on-Amur 4 December 193917 July 194315 July 1947scrapped 28 January 1958
Al'batrosShipyard 199, Komsomolsk-on-Amur4 December 19392 June 194429 September 1945scrapped 28 February 1961

Career

Little is known about their careers. Yastreb reportedly became a training ship on 17 February 1956. It became a target ship on 31 August 1956 and was then sold for scrap on 12 September 1959. Orel became a floating barracks on 31 January 1964 before being sold for scrap on 18 September 1969. Korshun may have been transferred to the Border Guards for several years before it was returned to the Navy in 1952. She was sold for scrap 31 January 1964. Zorkii also appears to have been transferred to the Border Guards upon completion before it was returned to the Navy in 1952. She became a training ship on 18 October 1956 and was sold for scrap on 4 November 1975. Burevestnik became a training ship on 17 February 1956 and was sold for scrap on 28 January 1958. Al'batros also became a training ship at the same time and was sold for scrap on 28 February 1961. [6]

Notes

  1. 1 2 3 Rohwer and Monakov, p. 101
  2. 1 2 3 Rohwer and Monakov, p. 203
  3. "Russian 85 mm/52 (3.3") 90-K 85 mm/52 (3.3") 92-K 85 mm/52 (3.3") MK85". 23 May 2006. Retrieved 2009-08-09.
  4. 1 2 Rohwer and Monakov, p. 237
  5. Rohwer and Monakov, p. 121
  6. "Typ Yastreb" (in Russian). Retrieved 2009-08-09.

Related Research Articles

<i>Sovetsky Soyuz</i>-class battleship Planned class of Soviet battleships

The Sovetsky Soyuz-class battleships, also known as "Stalin's Republics", were a class of battleships begun by the Soviet Union in the late 1930s but never brought into service. They were designed in response to the Bismarck-class battleships being built by Germany. Only four hulls of the fifteen originally planned had been laid down by 1940, when the decision was made to cut the program to only three ships to divert resources to an expanded army rearmament program.

Storozhevoy was the lead ship of her class of 18 destroyers built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Storozhevoy was completed in 1940 to the modified Project 7U design.

<i>Tashkent</i>-class destroyer

The Tashkent class consisted of a single destroyer leader, built in Italy for the Soviet Navy just before World War II. Three others were ordered from shipyards in the Soviet Union, but they were cancelled before they were laid down as they were too difficult to build with the existing technology in Soviet shipyards. Completed in 1939, Tashkent participated in the Sieges of Odessa and Sevastopol in 1941–1942, during which she ferried reinforcements and supplies into those cities, evacuated wounded and refugees, and provided naval gunfire support for Soviet troops. The ship was badly damaged twice by Axis bombers before she was sunk in the harbor in mid-1942. Her wreck refloated in 1944, but it was too badly damaged to be worth repairing and was scrapped after the war.

<i>Leningrad</i>-class destroyer

The six Leningrad-class destroyer leaders were built for the Soviet Navy in the late 1930s. They were inspired by the contre-torpilleurs built for the French Navy. They were ordered in two batches of three ships each; the first group was designated Project 1 and the second Project 38. These ships were the first large vessels designed and built by the Soviets after the October Revolution of 1917.

Soviet destroyer <i>Opytny</i> 1935 Soviet Navy destroyer

Opytny was the only member of her class of destroyers built for the Soviet Navy during the 1930s. The Soviet designation for her class was Project 45. She was originally named Sergo Ordzhonikidze and was the first Soviet destroyer to be indigenously designed. Renamed Opytny in 1940, the ship was intended as a prototype for future Soviet destroyers.

Uragan-class guard ships were built for the Soviet Navy as small patrol and escort ships in four batches with slightly different specifications. Their official Soviet designations were Projects 2, 4 and 39, but they were nicknamed the "Bad Weather Flotilla" by Soviet sailors by virtue of their meteorological names. Eighteen were built from 1927 to 1938 and those of the Baltic and Northern Fleets participated in the 1939–1940 Winter War against Finland. The Uragan class served during World War II in all four of the Soviet Fleets, including Black Sea and Pacific Fleets. Four of those ships assigned to the Baltic Fleet were lost during the war, including two during the Soviet evacuation of Tallinn in late 1941.

<i>Kiev</i>-class destroyer Soviet class of destroyer leaders

The Kiev class was designed in 1939 for the Soviet Navy as a smaller class of destroyer leaders after the cancellation of the Tashkent-class ships that had been intended to be built in the Soviet Union. Only three ships were begun; one was cancelled and scrapped before the Axis invasion in mid-1941 and construction of the other two was suspended during the war. The navy considered completing them under a new Project 48-K configuration afterwards, but decided against that as they would have been competing against a more modern design that lacked the stability problems that the 48-K design would have had. The Soviets either scrapped them or used them as targets.

Soviet destroyer <i>Tashkent</i> Destroyer of the Soviet Navy

Tashkent was the lead ship of her class of destroyer leaders, built in Italy for the Soviet Navy just before World War II. The problems of the previous Leningrad-class destroyer leaders demonstrated that Russian design experience had atrophied in the years since the Russian Revolution of 1917, and the Soviets contracted for design assistance from Fascist Italy in the mid-1930s. Delivered without any armament in 1939, Tashkent was given a temporary gunnery outfit when she entered service with the Black Sea Fleet later that year. She had her permanent armament installed shortly before the Axis Powers invaded the Soviet Union in mid-1941.

Soviet destroyer <i>Grozyashchy</i> (1937) Destroyer of the Soviet Navy

Grozyashchy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Baltic Fleet and played a minor role in the Winter War of 1939–1940 against the Finns. After the start of the German invasion of the Soviet Union in June 1941, Grozyashchy participated in the Gulf of Riga Campaign and laid minefields in the Gulf of Finland. She was badly damaged by a mine in July and was under repair for over a month. The ship was crippled by German bombs in late September and did not become operational for almost a year. Grozyashchy provided naval gunfire support in 1944 for the Leningrad–Novgorod Offensive.

Soviet destroyer <i>Bezuprechny</i> (1937) Destroyer of the Soviet Navy

Bezuprechny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Black Sea Fleet. After the German invasion of the Soviet Union in June 1941, the ship laid minefields and participated in the Siege of Odessa, ferrying men and supplies to the beleaguered city and providing naval gunfire support. Bezuprechny was damaged by German aircraft in September and was under repair for most of the rest of the year. During the Siege of Sevastopol, the ship resumed her duties in late December, only with a different destination. She was sunk by German aircraft while transporting supplies and troops on 26 June 1942 with the loss of approximately 300 crewmen and 320 passengers.

Soviet destroyer <i>Bditelny</i> (1937) Destroyer of the Soviet Navy

Bditelny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Black Sea Fleet. After the German invasion of the Soviet Union began in 1941, the ship provided naval gunfire support during the Siege of Odessa. Frequently under repair due to running aground in 1941, Bditelny was unable to support the defenders of Sevastopol until early 1942 when she began to ferry supplies and troops there while also bombarding German positions outside the besieged city. She was sunk during a German airstrike in July when some of her torpedoes exploded. Her wreck was salvaged for scrap between 1948 and 1952.

Soviet destroyer <i>Rezvy</i> (1937) Destroyer of the Soviet Navy

Rezvy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1940, she was assigned to the Pacific Fleet.

Soviet destroyer <i>Rastoropny</i> (1938) Destroyer of the Soviet Navy

Rastoropny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1940, she was assigned to the Pacific Fleet.

Soviet destroyer <i>Razyashchy</i> (1938) Destroyer of the Soviet Navy

Razyashchy was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1940, she was assigned to the Pacific Fleet and served until her sinking in 1961.

Soviet destroyer <i>Ryany</i> (1937) Destroyer of the Soviet Navy

Ryany was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1939, she was assigned to the Pacific Fleet.

Soviet destroyer <i>Rezky</i> (1940) Destroyer of the Soviet Navy

Rezky was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1942, she was assigned to the Pacific Fleet.

Soviet destroyer <i>Reshitelny</i> (1940) Destroyer of the Soviet Navy

Reshitelny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Originally named Pospeshny, she was renamed Reshitelny before completion in 1941, and was assigned to the Pacific Fleet. She was sold to People's Liberation Army Navy in 1955 and renamed Changchun. Currently she is preserved as a museum ship.

Soviet destroyer <i>Revnostny</i> (1941) Destroyer of the Soviet Navy

Revnostny was one of 29 Gnevny-class destroyers built for the Soviet Navy during the late 1930s. Completed in 1941, she was assigned to the Pacific Fleet.

Strogy was one of 18 Storozhevoy-class destroyers built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Strogy was rebuilt to the modified Project 7U design.

Stroyny was one of 18 Storozhevoy-class destroyers built for the Soviet Navy during the late 1930s. Although she began construction as a Project 7 Gnevny-class destroyer, Stroyny was completed in 1942 to the modified Project 7U design.

References