An editor has nominated this article for deletion. You are welcome to participate in the deletion discussion , which will decide whether or not to retain it. |
Bilaspur Junction - Nagpur Junction Vande Bharat Express | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service type | Vande Bharat Express | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Chhattisgarh and Maharashtra | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
First service | 11 December 2022 (Inaugural run) 12 December 2022 (Commercial run) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Current operator(s) | South East Central Railways (SECR) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Route | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | Bilaspur Junction (BSP) Nagpur Junction (NGP) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stops | 4 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Distance travelled | 412 km (256 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Average journey time | 05 hrs 30 mins | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service frequency | Six days a week [lower-alpha 1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Train number(s) | 20825 / 20826 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line(s) used | Bilaspur–Nagpur section | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
On-board services | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Class(es) | AC Chair Car, AC Executive Chair Car | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Seating arrangements |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sleeping arrangements | No | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Catering facilities | On-board catering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Observation facilities | Large windows in all coaches | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Entertainment facilities |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Baggage facilities | Overhead racks | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other facilities | Kavach | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | 8-car Vande Bharat | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | Indian gauge 1,676 mm (5 ft 6 in) broad gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 25 kV 50 Hz AC Overhead line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 75 km/h (47 mph) (Avg.) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Average length | 384 metres (1,260 ft) (16 coaches) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track owner(s) | Indian Railways | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rake maintenance | Bilaspur Junction (BSP) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The 20825/20826 Bilaspur - Nagpur Vande Bharat Express is India's 6th Vande Bharat Express train, connecting the states of Chhattisgarh and Maharashtra.
This train is operated by Indian Railways, connecting Bilaspur Jn, Raipur Jn, Durg Jn, Raj Nandgaon, Gondia Jn and Nagpur Jn. It is currently operated with train numbers 20825/20826 on 6 days a week basis. [1] [2] [3]
Train operation started with the fourth 2nd Generation (16 coaches) VBE trainset designed and manufactured by the ICF. However the rake was withdrawn and replaced with Mini Vande Bharat 2.0 (MVB2) in the month of May 2023 because of low occupancy. [4]
The 20825/20826 Bilaspur - Nagpur Vande Bharat Express operates 6 days a week, covering a distance of 412 km (256 mi) in a travel time of 5 hrs 30 mins with an average speed of 75 km/h (47 mph). The Maximum Permissible Speed is 130 km/h (81 mph). [5]
After the launch of the 6th Vande Bharat Express (Bilaspur - Nagpur - Bilaspur), on Wednesday 14 December 2022, an unidentified man threw a stone on the windowpane of the newly inaugurated express train. This incident took place between Durg Junction and Bhilai Nagar railway station. Luckily no casualties were reported. [6] [7]
The South East Central Railway is one of the 19 Railway Zones in India. The Zone Office is headquartered at Bilaspur and comprises the Bilaspur, Nagpur and Raipur Division.
In Indian Railways, A MEMU is an electric multiple unit (EMU) train that serves short and medium-distance routes in India, as compared to normal EMU trains that connect urban and suburban areas. The acronym stands for Mainline Electric Multiple Unit.
The 18237 / 18238 Chhattisgarh Express is a well known old Indian train which connects Gevra Road and Amritsar. Its name represents the state of Chhattisgarh. It runs through the states of Chhattisgarh, Maharashtra, Madhya Pradesh, Uttar Pradesh, Delhi, Haryana and Punjab and covers a distance of 2,109 km (1,310 mi).
Meerut City, or Meerut City Junction, is the main railway station in the city of Meerut. It is a junction of Meerut–Bulandshahr–Khurja line and Delhi–Meerut–Saharanpur line. Double lining of Meerut–Saharanpur section is on full swing.
The 12441 / 12442 Bilaspur Rajdhani Express is a Rajdhani Express train belonging to Indian Railways – Northern Railway zone that runs between Bilaspur Junction and New Delhi in India.
Ambikapur, station code ABKP, is a railway station that connects the city of Ambikapur, Chhattisgarh to the Indian Railway network. It is the connecting point of Surguja district and Surajpur district and falls within the South East Central Railway zone of the Indian Railways.
The 18243 / 18244 Bhagat Ki Kothi–Bilaspur Express is one of the Express trains of South East Central Railway zone which runs between Bilaspur Junction railway station of Bilaspur, city of Chhattisgarh and Bhagat Ki Kothi railway station, a suburban railway station in Jodhpur, Rajasthan.
Vande Bharat Express is a medium-distance superfast express service operated by Indian Railways. It is a reserved, air-conditioned chair car service connecting cities that are less than 800 km (500 mi) apart or take less than ten hours to travel with existing services. The train entered commercial service on 15 February 2019.
The 22436/22435 New Delhi - Varanasi Jn Vande Bharat Express is India's 1st semi-high speed, electric multiple unit train, connecting the states of New Delhi and Uttar Pradesh.
The 22439/22440 New Delhi - Shri Mata Vaishno Devi Katra Vande Bharat Express is India's 2nd Vande Bharat Express train, connecting the states of New Delhi, Haryana, Punjab and Jammu and Kashmir.
The 20901/20902 Mumbai Central - Gandhinagar Capital Vande Bharat Express is India's 3rd Vande Bharat Express train, connecting the states of Maharashtra and Gujarat.
The 22447/22448 New Delhi - Amb Andaura Vande Bharat Express is India's 4th Vande Bharat Express train, connecting the states of New Delhi, Haryana, Chandigarh, Punjab, and Himachal Pradesh.
The 20607/20608 MGR Chennai Central - Mysuru Vande Bharat Express is India's 5th Vande Bharat Express train, connecting the states of Tamil Nadu and Karnataka.
The 20833/20834 Visakhapatnam – Secunderabad Vande Bharat Express is India's 8th Vande Bharat Express train, connecting the states of Andhra Pradesh and Telangana.
The 20911/20912 Indore - Nagpur Vande Bharat Express is India's 23rd Vande Bharat Express train, connecting the city of Indore of Madhya Pradesh with Nagpur city in Maharashtra. Initially it ran from Indore Jn to Bhopal Jn when the train was first flagged off by Prime Minister Narendra Modi on 27 June 2023. Starting from 9 October 2023, the train was extended to Nagpur, providing enhanced connectivity in the region.
The 20677/20678 MGR Chennai Central - Vijayawada Vande Bharat Express is India's 27th Vande Bharat Express train, connecting the city of Chennai city in Tamil Nadu with Vijayawada in Andhra Pradesh. This train was inaugurated on 24 September 2023 by Prime Minister Narendra Modi via video conference from New Delhi.
The 22925/22926 Ahmedabad - Jamnagar Vande Bharat Express is India's 34th Vande Bharat Express train, connecting the city of Ahmedabad with Jamnagar in Gujarat. This train was inaugurated on 24 September 2023 by Prime Minister Narendra Modi via video conference from New Delhi.
The 22488/22487 Amritsar - Delhi Junction Vande Bharat Express is India's 38th Vande Bharat Express train, connecting the metropolitan city of Amritsar with the capital city of India, New Delhi.
The 22478/22477 SMVD Katra - New Delhi Vande Bharat Express is India's 37th Vande Bharat Express train, connecting the states of Jammu and Kashmir, Punjab, Haryana and New Delhi. This will be the 2nd Vande Bharat Express train which will run on the New Delhi-Katra train line after 3 October 2019.