Blue Ridge Tunnel

Last updated
Blue Ridge Tunnel
Blueridgetunnel.jpg
West Entrance to the Blue Ridge Tunnel
Overview
Line Chesapeake and Ohio Railway (C&O) Mountain Subdivision [1]  previously C&O Railroad and Blue Ridge Railroad
Location Augusta / Nelson counties, near Rockfish Gap, Virginia
Coordinates 38°02′18″N78°51′45″W / 38.0383°N 78.8625°W / 38.0383; -78.8625 (Northwest Portal of new tunnel)
StatusAbandoned, replaced by new tunnel currently in operation
Operation
Opened1858 (1858)
Owner Blue Ridge Railroad (1856–1870) [2]
Chesapeake and Ohio Railroad (1870–1878) [2]
Chesapeake and Ohio Railway (1878–1944) [3] [4]
Technical
Line length4,237 ft (1,291 m)
Track gauge 4 ft 8+12 in (1,435 mm)
Grade 70+ftmi (1.326%) [5]

The Blue Ridge Tunnel (also known as the Crozet Tunnel) is a historic railroad tunnel built during the construction of the Blue Ridge Railroad in the 1850s. The tunnel was the westernmost and longest of four tunnels engineered by Claudius Crozet to cross the Blue Ridge Mountains at Rockfish Gap in central Virginia.

Contents

At 4,237 feet (1,291 m) in length, the tunnel was the longest tunnel in the United States at the time of its completion. The tunnel was used by the Virginia Central Railroad from its opening to 1858, when the line was reorganized as the Chesapeake and Ohio Railroad (renamed Chesapeake and Ohio Railway in 1878). The Chesapeake and Ohio routed trains through the tunnel until it was abandoned and replaced by a new tunnel in 1944.

The new tunnel was named the "Blue Ridge Tunnel" as well, although the original tunnel still remains abandoned nearby. The old Blue Ridge Tunnel has since been named a Historic Civil Engineering Landmark by the American Society of Civil Engineers in 1976. [6] In late 2020, after a decade of stabilization work and restoration as well as access pathway construction, the tunnel was opened to visitors as a linear park.

Construction

The Blue Ridge Railroad was incorporated by the Commonwealth of Virginia in 1849 with Claudius Crozet as chief engineer. Its purpose was to provide a crossing of the Blue Ridge Mountains for the Virginia Central Railroad into the Shenandoah Valley. [3]

The Virginia Board of Public Works, founded in 1816, supported numerous internal improvements in the state, owning part of the Virginia Central in stock as well as virtually all of the Blue Ridge Railroad.

A civil engineer of considerable skill, Crozet had identified the eventual route as early as 1839. Rail service reached Charlottesville by 1851; westward, the railroad closely followed the alignment of the ancient Three Notch'd Road.

To protect its investment and enable transportation, the State then incorporated and financed the Blue Ridge Railroad to accomplish the hard and expensive task of crossing the Blue Ridge mountain barrier to the west. Rather than attempting the more formidable Swift Run Gap, the state-owned Blue Ridge Railroad built over the mountains at the next major gap to the south, Rockfish Gap near Afton Mountain.

Overseen by Crozet, the crossing was accomplished by building four tunnels, including the 4,237-foot (1,291 m) Blue Ridge Tunnel near the top of the pass. Construction began in 1850 and was expected to be completed in three years but the first train passed through the tunnel in 1858 and construction continued until 1860. [7] With construction proceeding from either side a decade before the invention of dynamite, the complex was dug through solid granite with only hand drills and black powder. The tunnel was less than 6 inches (150 mm) off perfect alignment when it was holed through on December 29, 1856. [8]

Records show that about 800 Irishmen and 40 enslaved African American laborers worked on the tunnel and there were 189 recorded deaths during its construction including men, women, and children who died during a cholera epidemic in 1854. [9]

When completed, the Blue Ridge Tunnel was the longest in the United States and one of the longest tunnels in the world, a remarkable feat of engineering. It opened to rail traffic in April 1858, and was considered to be one of the engineering wonders of the modern world. [10]

American Civil War

During the American Civil War, the infantry under Confederate General Stonewall Jackson earned the nickname "foot cavalry" by traveling very quickly across the Blue Ridge Mountains, to the consternation of the Union leaders opposing them. To do this, Jackson used his detailed knowledge of the gaps in the Blue Ridge and directed his troops to march through the Blue Ridge Tunnel. [11]

Replacement

View of the replacement Blue Ridge Tunnel (left) constructed by the C&O in 1944. The old tunnel is visible to the right. New and Old Blue Ridge Tunnels.jpg
View of the replacement Blue Ridge Tunnel (left) constructed by the C&O in 1944. The old tunnel is visible to the right.

The Blue Ridge Railroad ceased to exist once the route across the mountains was completed, becoming a part of the Virginia Central Railroad. In 1868, the Virginia Central was merged with another state-chartered railroad, the Covington and Ohio Railroad, to create the Chesapeake and Ohio Railroad (renamed Chesapeake and Ohio Railway in 1878). This helped achieve Virginia's long-term goal of linking its navigable rivers of the Chesapeake Bay watershed with the Ohio River. The C&O Railroad was subsequently sold to Collis Potter Huntington. [3]

The C&O replaced the Blue Ridge Tunnel in 1944 with a larger, parallel tunnel to accommodate the increased rail traffic of World War II. The new tunnel—which was 4 feet (1.2 m) off alignment when constructed—is now referred to as the Blue Ridge Tunnel. It is still in use by CSX Transportation, the Buckingham Branch Railroad and Amtrak.

Phased construction

After the original tunnel was replaced, it became known as the Crozet Tunnel in honor of its remarkable engineer, for whom the nearby town of Crozet is named. As of 2022, it was slated for use as part of a rail trail project. [10]

The Claudius Crozet Blue Ridge Tunnel Foundation secured a $749,000 grant through the Virginia Department of Transportation and the Commonwealth Transportation Board to begin Phase I of the project to reopen the long-closed tunnel with a bike path and hiking trail. Phase I will be a footpath from the former Afton rail depot to a concrete bulwark 700 feet into the tunnel. The first piece of the trail will begin and end on the east side of Afton Mountain. [12]

"This is definitely safe where we're going," district supervisor Allen Hale said in 2015. "But once you get to the tunnel and someone walks through here and gets all the way up, they're going to want to go in... The ultimate goal … is to have the tunnel open all the way through to the west side to the Blue Ridge Mountains and have a trail connection to U.S. Route 250 on the other side," Hale said... According to the News & Advance archives, the $450,000 required for Phase II has already been raised. Hale hopes to begin Phase II some time this year. The date for Phase III has yet to be set. [13] The Crozet Tunnel is open to foot traffic. The “Rails-To-Trails” walking/pedal cycling path is not yet, as of April 2021, complete to the tunnel.

Present use

Mapping the tunnel

In the fall of 2017, a University of Virginia assistant professor and two graduate students used a ground-based autonomous robot to scan and map the tunnel using LiDAR. The result was a three-dimensional map of the tunnel which can be used for restoration or construction projects in the future. [14]

Reopening of the tunnel

On the 21st September 2020, the tunnel was opened with an access trail. A Nelson County Parks and Recreation press release announced the Claudius Crozet Blue Ridge Tunnel Trail system will open from sunrise to sunset.

The project incorporates an access trail through the restored tunnel and new trailheads on both sides of the Blue Ridge with access for hikers, walkers, bicyclists, and others.

Eventually, the project will link existing trails, a long-distance trail system, and the historic communities on both sides of the mountains. The tunnel is also near the convergence of Skyline Drive, the Blue Ridge Parkway, the Appalachian Trail, and U.S. Bicycle Route 76. On the eastern side, there is a 12-spot parking lot at 215 Afton Depot Lane, while the western trailhead is near 483 Three Notched Mountain Highway, where there are 25 parking spaces and two oversized areas for small buses. At this time, there are no plans to light the tunnel, so visitors are urged to bring headlamps and/or flashlights.

A mini documentary about the reopening of the tunnel was released onto Youtube in March 2021. [15] The tunnel was listed on the National Register of Historic Places in 2023. [16]

See also

Footnotes

  1. Dixon 2008, p. 9.
  2. 1 2 Dixon 2008, p. 8.
  3. 1 2 3 History of the Chesapeake and Ohio Railway .
  4. Logan 1998, p. 12.
  5. Drinker 1893, p. 1072.
  6. "Historic Landmarks | ASCE".
  7. The Blue Ridge Tunnel - A remarkable Engineering Feat in Antebellum Virginia by Mary E. Lyons - ISBN   978-1-62619-421-2 p. 7, p. 22
  8. The Daily Dispatch (January 1, 1857), p. 2.
  9. The Blue Ridge Tunnel - A remarkable Engineering Feat in Antebellum Virginia by Mary E. Lyons - ISBN   978-1-62619-421-2 p. 29, p. 103, pp. 143-144, p. 169.
  10. 1 2 Jameson 2002
  11. Putnam 2011, p. 41.
  12. Aaron Richardson. September 15, 2013. "Project opens rail tunnel’s past." The (Charlottesville) Daily Progress.
  13. Tobi Walsh. "Inside the Blue Ridge Tunnel: The historic railroad tunnel, built in the 1850s, is set to become a walking trail." The (Lynchburg) News & Advance. June 21, 2015.
  14. Kelly, Matt (2018-01-05). "INTO THE DARKNESS: UVA ROBOT MAPS HISTORIC TUNNEL". UVAToday. University of Virginia . Retrieved 2018-01-09.
  15. The Tunnel , retrieved 2022-02-10
  16. "WEEKLY LIST OF ACTIONS TAKEN ON PROPERTIES: 4/21/2023 THROUGH 4/28/2023". National Park Service. Retrieved 2023-05-05.

Related Research Articles

<span class="mw-page-title-main">Nelson County, Virginia</span> County in Virginia, United States

Nelson County is a county located in the Commonwealth of Virginia, in the United States. As of the 2020 census, the population was 14,775. Its county seat is Lovingston. Nelson County is part of the Charlottesville, VA, Metropolitan Statistical Area.

<span class="mw-page-title-main">Crozet, Virginia</span> Census-designated place in Virginia, United States

Crozet is a census-designated place (CDP) in Albemarle County in the Commonwealth of Virginia, United States. It sits along the I-64 corridor, about 12 miles (19 km) west of Charlottesville and 21 miles (34 km) east of Staunton. Crozet is part of the Charlottesville Metropolitan Statistical Area. The population of Crozet was 5,565 at the 2010 census.

<span class="mw-page-title-main">Chesapeake and Ohio Railway</span> Defunct American Class I railway

The Chesapeake and Ohio Railway was a Class I railroad formed in 1869 in Virginia from several smaller Virginia railroads begun in the 19th century. Led by industrialist Collis P. Huntington, it reached from Virginia's capital city of Richmond to the Ohio River by 1873, where the railroad town of Huntington, West Virginia, was named for him.

<span class="mw-page-title-main">Claudius Crozet</span> French-American soldier and civil engineer (1789–1864)

Claude "Claudius" Crozet was a soldier, educator, and civil engineer.

<span class="mw-page-title-main">Skyline Drive</span> National Scenic Byway in Shenandoah National Park, Virginia, US

Skyline Drive is a 105-mile (169 km) National Parkway that runs the entire length of the National Park Service's Shenandoah National Park in the Blue Ridge Mountains of Virginia, generally along the ridge of the mountains. The drive's northern terminus is at an intersection with U.S. Route 340 (US 340) near Front Royal, and the southern terminus is at an interchange with US 250 near Interstate 64 (I-64) in Rockfish Gap, where the road continues south as the Blue Ridge Parkway. The road has intermediate interchanges with US 211 in Thornton Gap and US 33 in Swift Run Gap. Skyline Drive is part of Virginia State Route 48, which also includes the Virginia portion of the Blue Ridge Parkway, but this designation is not signed.

<span class="mw-page-title-main">Virginia Central Railroad</span> Railroad in Virginia

The Virginia Central Railroad was an early railroad in the U.S. state of Virginia that operated between 1850 and 1868 from Richmond westward for 206 miles (332 km) to Covington. Chartered in 1836 as the Louisa Railroad by the Virginia General Assembly, the railroad began near the Richmond, Fredericksburg and Potomac Railroad's line and expanded westward to Orange County, reaching Gordonsville by 1840. In 1849, the Blue Ridge Railroad was chartered to construct a line over the Blue Ridge Mountains for the Louisa Railroad which reached the base of the Blue Ridge in 1852. After a decision from the U.S. Supreme Court, the Louisa Railroad was allowed to expand eastward from a point near Doswell to Richmond.

<span class="mw-page-title-main">Blue Ridge Railroad (1849–1870)</span>

The Blue Ridge Railroad was incorporated by the Commonwealth of Virginia in March 1849 to provide a state-financed crossing of the Blue Ridge Mountains for the Virginia Central Railroad, which it became a part of after completion.

<span class="mw-page-title-main">Rockfish Gap</span>

Rockfish Gap is a wind gap located in the Blue Ridge Mountains between Charlottesville and Waynesboro, Virginia, United States, through Afton Mountain, which is frequently used to refer to the gap.

Buckingham Branch Railroad is a Class III short-line railroad operating over 275 miles (443 km) of historic and strategic trackage in Central Virginia. Sharing overhead traffic with CSX and Amtrak, the company's headquarters are in Dillwyn, Virginia in the former Chesapeake and Ohio Railroad (C&O) station, itself a historic landmark in the community. The railroad was featured in the January 2012 issue of Trains Magazine. It is referenced in the How It’s Made episode “Railway Bridge Ties”, showing it crossing a curved bridge.

Swift Run Gap is a wind gap in the Blue Ridge Mountains located in the U.S. state of Virginia.

<span class="mw-page-title-main">Covington and Ohio Railroad</span>

Covington and Ohio Railroad was part of a planned railroad link between Eastern Virginia and the Ohio River in the 1850s. The mountainous region of the Allegheny Front of the Appalachian Plateau between an existing canal, railroads and navigable rivers represented a formidable obstacle.

<span class="mw-page-title-main">U.S. Route 60 in Virginia</span> Section of U.S. Numbered Highway in Virginia, United States

U.S. Route 60 (US 60) in the Commonwealth of Virginia runs 303 miles (488 km) west to east through the central part of the state, generally close to and paralleling the Interstate 64 corridor, except for the crossing of the Blue Ridge Mountains, and in the South Hampton Roads area.

<span class="mw-page-title-main">Virginia State Route 151</span>

State Route 151 is a primary state highway in the U.S. state of Virginia. The state highway runs 35.22 miles (56.68 km) from U.S. Route 29 at Buffalo Hill north to US 250 at Critzers Shop. SR 151 traverses the Blue Ridge foothills of western Nelson County, where the highway provides access to the Wintergreen Resort.

<span class="mw-page-title-main">Virginia State Route 240</span>

State Route 240 is a primary state highway in the U.S. state of Virginia. The state highway runs 4.51 miles (7.26 km) between junctions with U.S. Route 250 in Brownsville and near Ivy. SR 240 is an L-shaped route that forms the old alignment of US 250 through Crozet in western Albemarle County.

The Staunton–Parkersburg Turnpike was built in what is now the U.S. states of Virginia and West Virginia during the second quarter of the 19th century to provide a roadway from Staunton, Virginia and the upper Shenandoah Valley to the Ohio River at present-day Parkersburg, West Virginia. Engineered by Claudius Crozet through the mountainous terrain, it was a toll road partially funded by the Virginia Board of Public Works. Control of this road became crucial during the American Civil War. Today, the Staunton-Parkersburg Turnpike can be largely traversed by following West Virginia Route 47 east from Parkersburg to Linn, then U.S. Route 33 east through Weston and Buckhannon to Elkins, then U.S. Route 250 southeast through Beverly, Huttonsville, crossing the West Virginia/Virginia state line to Staunton, Virginia.

<span class="mw-page-title-main">U.S. Route 250 in Virginia</span>

U.S. Route 250 is a part of the U.S. Highway System that runs from Sandusky, Ohio to Richmond, Virginia. In Virginia, the highway runs 166.74 miles (268.34 km) from the West Virginia state line near Hightown east to its eastern terminus at US 360 in Richmond. US 250 is the main east–west highway of Highland County, which is known as Virginia's Little Switzerland; the highway follows the path of the 19th century Staunton and Parkersburg Turnpike. From Staunton east to Richmond, the highway serves as the local complement to Interstate 64 (I-64), roughly following the 18th century Three Notch'd Road through Waynesboro and Charlottesville on its way through the Shenandoah Valley, its crossing of the Blue Ridge Mountains at Rockfish Gap, and the Piedmont. In the Richmond metropolitan area, US 250 is known as Broad Street, a major thoroughfare through the city's West End and downtown areas.

<span class="mw-page-title-main">Afton, Virginia</span> Unincorporated community in Virginia, United States

Afton is an unincorporated community and census-designated place in Albemarle and Nelson counties in the Commonwealth of Virginia. It is newly listed as a CDP in the 2020 census with a population of 313.

<span class="mw-page-title-main">Greenwood, Albemarle County, Virginia</span> Unincorporated community in Virginia, United States

Greenwood is an unincorporated community in Albemarle County, Virginia, United States. It is home to the Greenwood Country Store and the Greenwood Community Center, which has the area's only roller skating rink. Greenwood has a post office with ZIP code 22943 The Greenwood Tunnel, built by Claudius Crozet for the Blue Ridge Railroad and used by the Chesapeake and Ohio Railway until its abandonment during World War II, is near Greenwood by the Buckingham Branch Railroad tracks.

<span class="mw-page-title-main">Greenwood Tunnel</span>

The Greenwood Tunnel is a historic railroad tunnel constructed in 1853 by Claudius Crozet during the construction of the Blue Ridge Railroad. The tunnel was the easternmost tunnel in a series of four tunnels used to cross the Blue Ridge Mountains of Virginia. Located near Greenwood in Albemarle County, Virginia, the tunnel was used by the Chesapeake and Ohio Railway (C&O) until its abandonment in 1944. The tunnel still exists, though sealed, next to the old C&O line, now owned by CSX Transportation and leased to the Buckingham Branch Railroad, which runs through a cut bypassing the old tunnel.

<span class="mw-page-title-main">Brookville Tunnel</span> Railroad tunnel in Virginia, United States

The Brookville Tunnel was a historic railroad tunnel engineered by Claudius Crozet during the construction of the Blue Ridge Railroad in the 1850s. The tunnel was part of a series of four tunnels used to cross the Blue Ridge Mountains of Virginia for the Virginia Central Railroad of the United States. The Brookville Tunnel was the second tunnel used to cross the mountains from the east, and was located approximately 1.5 miles (2.4 km) west of the village of Greenwood, Virginia.

References