Brookville Tunnel

Last updated

Brookville Tunnel
Brooksville Tunnel Profile.PNG
Diagram of the Brookville Tunnel
Overview
Line Chesapeake and Ohio Railway (C&O) Mountain Subdivision [1]  previously C&O Railroad and Blue Ridge Railroad
Location Albemarle County [2]
Coordinates 38°02′38″N78°47′55″W / 38.04389°N 78.79861°W / 38.04389; -78.79861
StatusDemolished, replaced by cut
Operation
Opened1856 (1856)
Closed1960s70s (1960s70s)
Owner Blue Ridge Railroad (18561870) [3]
Chesapeake and Ohio Railroad (18701878) [3]
Chesapeake and Ohio Railway (1878abandonment) [4] [5]
Technical
Length869 feet (265 m) [6] [note 1]
No. of tracks 1
Track gauge 4 ft 8+12 in (1,435 mm) [11]
Grade 70+ftmi (1.326%) [12]

The Brookville Tunnel (also Brooksville Tunnel) was a historic railroad tunnel engineered by Claudius Crozet during the construction of the Blue Ridge Railroad in the 1850s. The tunnel was part of a series of four tunnels used to cross the Blue Ridge Mountains of Virginia for the Virginia Central Railroad of the United States. The Brookville Tunnel was the second tunnel used to cross the mountains from the east (the easternmost being the Greenwood Tunnel), and was located approximately 1.5 miles (2.4 km) west of the village of Greenwood, Virginia.

Contents

During its construction, numerous cave-ins and landslides occurred because of the fragile and weak rock the tunnel passed through, and at one point, an outbreak of cholera forced work to stop. By October 1856 the tunnel was completed at a cost of $114,600, having been lined with a thick elliptical brick arch to hold back the earth. The Brookville Tunnel was used by the Virginia Central Railroad, and after 1868, the line's successor, the Chesapeake and Ohio Railroad. After the reorganization of the line in 1878 as the Chesapeake and Ohio Railway, the tunnel continued to be used until it was demolished and replaced by a cut during the construction of Interstate 64 in the 1960s and 1970s, at which point it was one of only two of Crozet's original four tunnels still in use.

History

On March 5, 1849, the Virginia General Assembly passed an act to incorporate the Blue Ridge Railroad. This railroad was to construct a rail line over the Blue Ridge Mountains for the Louisa railroad (renamed as the Virginia Central Railroad in February 1850) from a point near Blair Park at the eastern base of the mountains to Waynesboro in the Shenandoah Valley via Rockfish Gap. [13] Claudius Crozet was appointed as chief engineer of the Blue Ridge Railroad and developed a plan to cross the mountains using a series of four tunnels. [4] The first tunnel from the east was the Greenwood Tunnel, built through a difficult and insecure ridge near Greenwood. [14] Brookville tunnel was located 1.5 miles (2.4 km) west of the Greenwood Tunnel, [15] also built through a small offshoot spur of the Blue Ridge Mountains. [16]

Construction on the Brookville Tunnel, or the "middle" [17] or "second tunnel" [18] as it was then called, was begun sometime between 1849 and 1851. [12] [17] The earth encountered at Brookville was of a much weaker quality than at the Greenwood Tunnel, rendering the digging of the tunnel both an extremely dangerous and difficult task. Although the eastern section of the ridge was composed of firm and sturdy rock, [18] the majority of the tunnel passed through a mixture of frail slate that was formed at a steep angle, soapstone, and clay. [16] [19] When exposed to air, this mixture would often disintegrate causing large amounts of earth to fall into the tunnel bore. [19] [20] On two occasions during the tunnel's construction, though great care was taken to provide temporary support, major cave-ins occurred forming craters on top of the ridge, as much as 150 feet (46 m) above the tunnel. [16] [21] Another slide occurred on the outside of the western portal that blocked the entrance to the tunnel and prevented workers from repairing the damage from the two internal cave-ins. [22] Rocks often fell down upon the timbers under which the men worked, creating sounds described as "resembling that of distant thunder". [23] The weakness of the earth, especially in the western sections, necessitated the implementation of a strong arch throughout approximately 500 feet (150 m) of the tunnel and a durable brick lining. [24] Crozet described the nature of the work on the tunnel in an 1854 letter:

The Brooksville Tunnel is the most difficult work of the kind, I have seen any record of: at the Western entrance, the pressure of the big slides actually causes the bottom to surge up, as is sometime the case in coal mines; in view of the sliding tendency and immense pressure of this ground, it will be advisable to enter on that side with an invested arch to prevent a collapse...This work is vastly more difficult than the Greenwood Tunnel was, though it was not, by any means, an easy safe job. [25]

Claudius Crozet, Chief Engineer of the Blue Ridge Railroad. Claudius Crozet.jpg
Claudius Crozet, Chief Engineer of the Blue Ridge Railroad.

By this time, the tunnel had come to be known as the "Brooksville Tunnel," after a small stagecoach stop and inn nearby where Crozet's headquarters was located; [5] [26] in later years, the "s" was dropped and the tunnel was simply referred to as the "Brookville Tunnel." [8] [18] [27] In late summer of 1854, an epidemic of cholera broke out among the Irish workers at the tunnel. In a letter to the Virginia Board of Public Works, Crozet states that the epidemic began at the eastern end of the tunnel where around 25 of the total 150 workers perished from the disease. The disease then spread to the western end where another eight workers died before work ceased. During this outbreak, little work could be done on the tunnel, adding yet another delay to the difficult work the Brookville Tunnel posed. [25]

While work on the tunnels continued, the Virginia Central Railroad, eager to connect its eastern division to the line under construction in the Shenandoah Valley, developed plans to use temporary tracks to bypass the incomplete Blue Ridge Railroad. [28] [29] As was done over Rockfish Gap to the west, a temporary track approximately 0.5 miles (0.8 km) long was proposed by the Virginia Central Railroad's Chief Engineer, Charles Ellet, Jr., and constructed around the Brookville Tunnel as the digging continued. [30] Due to the many setbacks and difficulties encountered, the tunnel was not completed until October 1856, just two months prior to the hole-through of the 4,273-foot (1,302 m) Blue Ridge Tunnel at the top of Rockfish Gap. [31] [32] Remarkably, with the exception of the cholera outbreak, no one was injured during the dangerous work completing the Brookville tunnel. [10] The Virginia Central soon after began routing trains through the Brookville tunnel, avoiding the short temporary track. [33]

During the American Civil War (1861–1865), a large crack was found within the tunnel's arch, being in some locations as much as 4 inches (10 cm) wide. Upon examination of the earth above the tunnel, it was found that a section of the earth had slipped, and was resting on the tunnel walls. With the tunnel in danger of collapsing, a plan to address the tunnel's structural issues was developed that put in place a second arch below the original. [16] The new arch was started 12 feet (3.7 m) above the rails [34] and rose to a peak just above what was necessary to clear a brakeman riding atop a railroad car (at that time, 17 feet or 5.2 metres), [35] around 3 feet (0.91 m) below the original arch. [34] Because of the ongoing war and the lack of funds and resources, the new arching could only be completed in 10-foot (3.0 m) segments. [35] It was deemed necessary to re-arch a total of 450 feet (140 m) of the tunnel, and as of 1864, 260 feet (79 m) had been completed at a cost of $23,390.73 (Confederate dollars). [34]

After the war, the tunnel continued to be used by the Virginia Central Railroad, and after 1868, the Chesapeake and Ohio Railroad. [36] The Chesapeake and Ohio Railroad was reorganized as the Chesapeake and Ohio Railway in 1878, [4] and continued to route trains through the tunnel up until the tunnel's demolition with the construction of Interstate 64 in the 1960s and 1970s. [5] [32] At the time of the tunnel's demolition, it was one of only two of Crozet's original four tunnels of the Blue Ridge Railroad still in operation (the other, which as of 2013 is still in use, was the 100-foot (30 m) Little Rock Tunnel). [32] [37] [38] Today, Interstate 64 passes over the cut that replaced the Brookville Tunnel. [3] [32] [39]

Architecture

The original Brookville Tunnel used the same style elliptical portals as the Greenwood Tunnel, seen here, and the Blue Ridge Tunnel. Greenwood Tunnel.jpg
The original Brookville Tunnel used the same style elliptical portals as the Greenwood Tunnel, seen here, and the Blue Ridge Tunnel.

The Brookville Tunnel was constructed in an elliptical form, [40] a design typical of tunnel construction during the 1800s [41] and also used on the Blue Ridge and Greenwood Tunnels. [37] In a November 1849 report, Crozet describes the design to be used on the tunnels:

The shape I have adopted is that of an ellipse, formed by bisecting, on each side, the horizontal ordinates of a circle of 32 feet diameter, down to its center, below which the sides are to be made vertical, if no arch is necessary lower down; otherwise, the ellipse is to continue down to the bottom and to be shaped all round with bricks, stones, or iron, as may appear most eligible. This shape leaves ample room for the cars, and, by contracting the roof, is more secure than a semicircle of 16 feet diameter. [40]

Portions of the Brookville tunnel were lined with brick for added strength, with the brickwork originally contracted to Joseph Dettor, a local brickmaker. Because of the poor quality of Dettor's bricks, Crozet decided to use these bricks on the Greenwood Tunnel to the east, which was a stronger bore than Brookville. [42] Crozet estimated in 1854 that the total number of bricks required for the entire tunnel would be upwards of 750,000. [25] After examining the offers of multiple brickmakers, [43] the Virginia Board of Public Works contracted Robert Harris to provide the bricks for the Brookville Tunnel. [42] The resulting arch was between 3–4 feet (0.9–1.2 m) in thickness over the entire length of the tunnel, and formed an opening approximately 20 feet (6.1 m) high and, at the extreme, 15 feet (4.6 m) wide. [44]

During the construction, the timbers that were used to support the fragile sections of the tunnel to be arched were left in place after the arch was completed, as it was thought too hazardous to remove them. When the earth slip occurred during the Civil War, these remaining timbers acted as levers, furthering the cracking and structural instability of the tunnel. [45] As the new arch was constructed, the old timbers were removed, and the space in between the new and old walls was filled with brick and cement. [35]

The original brick portals were replaced by the Chesapeake and Ohio Railway in 1928 with concrete portals, as part of a series of tunnel upgrades across the line beginning in the 1920s. The new portals no longer bore the distinctive elliptical design of Crozet's original, but had vertical sides and a semi-circular arch. [46]

Construction Costs

The total cost to complete the Brookville Tunnel amounted to $114,600, with a cost per foot, at a length of 869 feet (265 m), of $131.90. [6] [32] By comparison, the cost per foot of the 538-foot (164 m) Greenwood Tunnel was $138.30, the 100-foot (30 m) Little Rock Tunnel was $123.90, and the 4,273-foot (1,302 m) Blue Ridge Tunnel was $108.60. [47] Costs at the Brookville Tunnel were greatly increased from the expected by the frail and insecure earth encountered, contrary to what originally appeared to be solid rock. [48] Workers, both inside and outside laborers, were paid approximately $1.12 per day, while miners were paid $1.37 per day, equivalent to $37.98 and $46.46, respectively, today. [49]

Notes

  1. Sources vary on the length of the tunnel, the following are reported lengths: 859 feet (262 m), [7] 864 feet (263 m), [8] 869 feet (265 m). [9] [10]

Footnotes

  1. Dixon 2008, p. 9.
  2. Brookville Tunnel (historical).
  3. 1 2 3 Dixon 2008, p. 8.
  4. 1 2 3 History of the Chesapeake and Ohio Railway .
  5. 1 2 3 Logan 1998, p. 12.
  6. 1 2 Nelson 1927, p. 137.
  7. Sweet 1998, p. 19.
  8. 1 2 Katz, table 1.
  9. Dixon 2008, p. 5.
  10. 1 2 Couper 1936, p. 157.
  11. Majewski 2000, p. 134.
  12. 1 2 Drinker 1893, p. 1072.
  13. Virginia General Assembly 1849, p. 30–31.
  14. Historic American Engineering Record, p. 4.
  15. Google Maps Distance Between Greenwood and former Brookville Tunnel
  16. 1 2 3 4 Drinker 1893, pp. 886–888.
  17. 1 2 Virginia Central Railroad Company 1853, 1853 Report, p. 25.
  18. 1 2 3 Crozet 1853, p. 282.
  19. 1 2 Couper 1936, p. 147.
  20. Logan 1998, p. 8.
  21. Crozet 1857, p. 406.
  22. Crozet 1857, pp. 406–407.
  23. Couper 1936, p. 148.
  24. Drinker 1893, pp. 887, 1072.
  25. 1 2 3 Crozet 1854, September 1.
  26. Couper 1936, p. 161.
  27. Logan 1998, p. 13.
  28. Virginia Central Railroad Company 1853, 1853 Report, pp. 12, 20–22.
  29. Dixon 2008, pp. 6–7.
  30. Dixon 2008, p. 7.
  31. Crozet 1857, p. 407.
  32. 1 2 3 4 5 Sweet 1998, p. 20.
  33. Couper 1936, p. 158.
  34. 1 2 3 Virginia Central Railroad Company 1864, 1864 Report, p. 30.
  35. 1 2 3 Drinker 1893, p. 887.
  36. Chesapeake & Ohio Railroad Company 1869, 1868 Report, p. 14.
  37. 1 2 Dixon 2008, p. 10.
  38. Google Maps Aerial View of Little Rock Tunnel
  39. Google Maps Aerial View of Former Brookville Tunnel
  40. 1 2 Crozet 1849, p. 331.
  41. Historic American Engineering Record, p. 2.
  42. 1 2 Sweet 1998, pp. 19–20.
  43. Crozet 1854, November 5.
  44. Virginia Central Railroad Company 1864, 1864 Report, p. 29.
  45. Virginia Central Railroad Company 1864, 1864 Report, pp. 29–30.
  46. Dixon 2008, pp. 8,10.
  47. Nelson 1927, pp. 136–137.
  48. Couper 1936, p. 159.
  49. Drinker 1893, pp. 1092–1093.

Related Research Articles

<span class="mw-page-title-main">Crozet, Virginia</span> Census-designated place in Virginia, United States

Crozet is a census-designated place (CDP) in Albemarle County in the Commonwealth of Virginia, United States. It sits along the I-64 corridor, about 12 miles (19 km) west of Charlottesville and 21 miles (34 km) east of Staunton. Crozet is part of the Charlottesville Metropolitan Statistical Area. The population of Crozet was 5,565 at the 2010 census.

<span class="mw-page-title-main">Allegheny Portage Railroad</span> National Historic Site of the United States

The Allegheny Portage Railroad was the first railroad constructed through the Allegheny Mountains in central Pennsylvania. It operated from 1834 to 1854 as the first transportation infrastructure through the gaps of the Allegheny that connected the midwest to the eastern seaboard across the barrier range of the Allegheny Front. Approximately 36 miles (58 km) long overall, both ends connected to the Pennsylvania Canal, and the system was primarily used as a portage railway, hauling river boats and barges over the divide between the Ohio and the Susquehanna Rivers. Today, the remains of the railroad are preserved within the Allegheny Portage Railroad National Historic Site operated by the National Park Service.

<span class="mw-page-title-main">Claudius Crozet</span> French-American soldier and civil engineer (1789–1864)

Claude "Claudius" Crozet was a soldier, educator, and civil engineer.

<span class="mw-page-title-main">Virginia Central Railroad</span> Railroad in Virginia

The Virginia Central Railroad was an early railroad in the U.S. state of Virginia that operated between 1850 and 1868 from Richmond westward for 206 miles (332 km) to Covington. Chartered in 1836 as the Louisa Railroad by the Virginia General Assembly, the railroad began near the Richmond, Fredericksburg and Potomac Railroad's line and expanded westward to Orange County, reaching Gordonsville by 1840. In 1849, the Blue Ridge Railroad was chartered to construct a line over the Blue Ridge Mountains for the Louisa Railroad which reached the base of the Blue Ridge in 1852. After a decision from the U.S. Supreme Court, the Louisa Railroad was allowed to expand eastward from a point near Doswell to Richmond.

<span class="mw-page-title-main">Blue Ridge Railroad (1849–1870)</span>

The Blue Ridge Railroad was incorporated by the Commonwealth of Virginia in March 1849 to provide a state-financed crossing of the Blue Ridge Mountains for the Virginia Central Railroad, which it became a part of after completion.

<span class="mw-page-title-main">Blue Ridge Tunnel</span> Historic railroad tunnel

The Blue Ridge Tunnel is a historic railroad tunnel built during the construction of the Blue Ridge Railroad in the 1850s. The tunnel was the westernmost and longest of four tunnels engineered by Claudius Crozet to cross the Blue Ridge Mountains at Rockfish Gap in central Virginia.

<span class="mw-page-title-main">Pittsburgh, Cincinnati, Chicago and St. Louis Railroad</span> Railroad in the United States (1917–1956)

The Pittsburgh, Cincinnati, Chicago and St. Louis Railroad, commonly called the Pan Handle Route, was a railroad that was part of the Pennsylvania Railroad system. Its common name came from its main line, which began at Pittsburgh, Pennsylvania, crossed the Northern Panhandle of West Virginia, and continued west to Bradford, Ohio, where it split into a northern line to Chicago and a southern one through Indianapolis, Indiana, to East St. Louis, Illinois.

<span class="mw-page-title-main">Rockfish Gap</span>

Rockfish Gap is a wind gap located in the Blue Ridge Mountains between Charlottesville and Waynesboro, Virginia, United States, through Afton Mountain, which is frequently used to refer to the gap.

Buckingham Branch Railroad is a Class III short-line railroad operating over 275 miles (443 km) of historic and strategic trackage in Central Virginia. Sharing overhead traffic with CSX and Amtrak, the company's headquarters are in Dillwyn, Virginia in the former Chesapeake and Ohio Railway (C&O) station, itself a historic landmark in the community. The railroad was featured in the January 2012 issue of Trains Magazine. It is referenced in the How It’s Made episode “Railway Bridge Ties”, showing it crossing a curved bridge.

Swift Run Gap is a wind gap in the Blue Ridge Mountains located in the U.S. state of Virginia.

<span class="mw-page-title-main">Covington and Ohio Railroad</span>

Covington and Ohio Railroad was part of a planned railroad link between Eastern Virginia and the Ohio River in the 1850s. The mountainous region of the Allegheny Front of the Appalachian Plateau between an existing canal, railroads and navigable rivers represented a formidable obstacle.

<span class="mw-page-title-main">Union Station (Columbus, Ohio)</span> Former railway station in Ohio, United States

Columbus Union Station was an intercity train station in Downtown Columbus, Ohio, near The Short North neighborhood. The station and its predecessors served railroad passengers in Columbus from 1851 until April 28, 1977.

The Staunton–Parkersburg Turnpike was built in what is now the U.S. states of Virginia and West Virginia during the second quarter of the 19th century to provide a roadway from Staunton, Virginia and the upper Shenandoah Valley to the Ohio River at present-day Parkersburg, West Virginia. Engineered by Claudius Crozet through the mountainous terrain, it was a toll road partially funded by the Virginia Board of Public Works. Control of this road became crucial during the American Civil War. Today, the Staunton-Parkersburg Turnpike can be largely traversed by following West Virginia Route 47 east from Parkersburg to Linn, then U.S. Route 33 east through Weston and Buckhannon to Elkins, then U.S. Route 250 southeast through Beverly, Huttonsville, crossing the West Virginia/Virginia state line to Staunton, Virginia.

<span class="mw-page-title-main">Greenwood, Albemarle County, Virginia</span> Unincorporated community in Virginia, United States

Greenwood is an unincorporated community in Albemarle County, Virginia, United States. It is home to the Greenwood Country Store and the Greenwood Community Center, which has the area's only roller skating rink. Greenwood has a post office with ZIP code 22943 The Greenwood Tunnel, built by Claudius Crozet for the Blue Ridge Railroad and used by the Chesapeake and Ohio Railway until its abandonment during World War II, is near Greenwood by the Buckingham Branch Railroad tracks.

<span class="mw-page-title-main">Peninsula Extension</span> 1881 railroad line from Richmond, VA to Newport News, VA

The Peninsula Extension which created the Peninsula Subdivision of the Chesapeake and Ohio Railway (C&O) was the new railroad line on the Virginia Peninsula from Richmond to southeastern Warwick County. Its principal purpose was to provide an important new pathway for coal mined in West Virginia to reach the harbor of Hampton Roads for coastal and export shipping on collier ships.

<span class="mw-page-title-main">Greenwood Tunnel</span> Historic railroad tunnel built in 1853

The Greenwood Tunnel is a historic railroad tunnel constructed in 1853 by Claudius Crozet during the construction of the Blue Ridge Railroad. The tunnel was the easternmost tunnel in a series of four tunnels used to cross the Blue Ridge Mountains of Virginia. Located near Greenwood in Albemarle County, Virginia, the tunnel was used by the Chesapeake and Ohio Railway (C&O) until its abandonment in 1944. The tunnel still exists, though sealed, next to the old C&O line, now owned by CSX Transportation and leased to the Buckingham Branch Railroad, which runs through a cut bypassing the old tunnel.

<span class="mw-page-title-main">Charlottesville and Albemarle Railway</span> Electric street railroad

The Charlottesville and Albemarle Railway (C&A) was a short electric street railroad operating within the city of Charlottesville, Virginia, United States, during the early 20th century. The line was preceded by several streetcar lines operating both horse-drawn and electric powered cars dating back to 1887. After facing financial difficulties, the predecessor lines were reorganized into the C&A in 1903. The C&A's electric streetcars operated off of an overhead line system that was powered by the railroad's own power plant. The C&A also offered electric power generated by its plant to the city of Charlottesville. During the mid-1910s, the line received numerous upgrades, including the construction of a new power plant on the Rivanna River, a new company headquarters building, expansion of track, and the purchase of new streetcars.

<span class="mw-page-title-main">Kingwood Tunnel</span>

The Kingwood Tunnel, near Tunnelton, West Virginia, was built between 1849 and 1852 by the Baltimore and Ohio Railroad on its main line between Baltimore, Maryland and Wheeling, West Virginia, under the supervision of B&O chief engineer Benjamin Henry Latrobe, II. At the time of its completion the 4,137-foot (1,261 m) tunnel was the longest tunnel in the United States until it was surpassed by the Blue Ridge Tunnel in 1858.

The original Maggoty Gap was a wind gap in the Blue Ridge Mountains in the counties of Roanoke, Virginia and Franklin, Virginia. Over time, as roads were improved and relocated, the identified location of the gap moved with them. It is now mapped at a spot in Roanoke County.

References